Recommendations issued by UK statutory and non-statutory inquiries, with their tracked government response and supporting evidence.

Clear

Browse by inquiry

35 inquiries with tracked recs
Inquiry Recs Accepted
Mid Staffs Inquiry 290 281
Manchester Arena Inquiry 169 169
IICSA 107 96
Muckamore Abbey Inquiry 106
Grenfell Tower Inquiry 104 104
Infected Blood Inquiry 103 102
Hyponatraemia Inquiry 96 96
Fuller Inquiry 92 71
Leveson Inquiry 92 77
Vale of Leven Inquiry 75 75
Baha Mousa Inquiry 73 72
Southport Inquiry 67
RHI Inquiry 45 44
COVID-19 Inquiry 44 24
Morecambe Bay Investigation 44 44
Brook House Inquiry 33 28
Bichard Inquiry 31 31
Angiolini Inquiry 30 29
Post Office Horizon Inquiry 27 25
Jermaine Baker Inquiry 26 22
Edinburgh Tram Inquiry 24 21
Daniel Morgan Panel 23 21
Cranston Inquiry 18
Paterson Inquiry 17 15
HIA Inquiry 12 12
Scottish Hospitals Inquiry 11 11
Anthony Grainger Inquiry 9 9
Al-Sweady Inquiry 9 9
Hillsborough Panel 9 5
Fingerprint Inquiry 9 9
ICL Inquiry 7 6
Litvinenko Inquiry 5 5
Azelle Rodney Inquiry 3 3
Billy Wright Inquiry 3 3
Penrose Inquiry 1 1

Recommendations

1,417 of 1,814 · page 5 of 29
Code Recommendation Inquiry Response
P1-32 Require personal emergency evacuation plans (PEEPs)
The owner and manager of every high-rise residential building be required by law to prepare personal emergency evacuation plans (PEEPs) for all …
Grenfell Tower Inquiry (2019) Accepted in Part
P1-33 Require PEEP information in premises information box
The owner and manager of every high-rise residential building be required by law to include up-to-date information about persons with reduced mobility …
Grenfell Tower Inquiry (2019) Accepted in Part
P1-34 Equip fire services with smoke hoods
All fire and rescue services be equipped with smoke hoods to assist in the evacuation of occupants through smoke-filled exit routes.
Grenfell Tower Inquiry (2019) Accepted
P1-35 Require clear floor number markings in high-rise buildings
In all high-rise buildings floor numbers be clearly marked on each landing within the stairways and in a prominent place in all …
Grenfell Tower Inquiry (2019) Accepted
P1-36 Require understandable fire safety instructions
The owner and manager of every residential building containing separate dwellings (whether or not it is a high-rise building) be required by …
Grenfell Tower Inquiry (2019) Accepted
P1-37 Urgent fire door inspections required
The owner and manager of every residential building containing separate dwellings (whether or not they are high-rise buildings) carry out an urgent …
Grenfell Tower Inquiry (2019) Accepted
P1-38 Require quarterly fire door checks
The owner and manager of every residential building containing separate dwellings (whether or not they are high-rise buildings) be required by law …
Grenfell Tower Inquiry (2019) Accepted in Part
P1-39 Require compliant flat entrance doors where unsafe cladding exists
All those who have responsibility in whatever capacity for the condition of the entrance doors to individual flats in high-rise residential buildings, …
Grenfell Tower Inquiry (2019) Accepted in Part
P1-40 Communicate Major Incident declarations to all responders
Each emergency service must communicate the declaration of a Major Incident to all other Category 1 Responders as soon as possible.
Grenfell Tower Inquiry (2019) Accepted
P1-41 Establish inter-service control room communications
On the declaration of a Major Incident clear lines of communication must be established as soon as possible between the control rooms …
Grenfell Tower Inquiry (2019) Accepted
P1-42 Designate single point of contact in control rooms
A single point of contact should be designated within each control room to facilitate such communication.
Grenfell Tower Inquiry (2019) Accepted
P1-43 Use METHANE messages for Major Incidents
A 'METHANE' (Major incident declared, Exact location, Type of incident, Hazards, Access, Number and type of casualties, Emergency services present and required) …
Grenfell Tower Inquiry (2019) Accepted
P1-44 Investigate LFB-MPS-LAS system compatibility
Steps be taken to investigate the compatibility of the LFB systems with those of the MPS and the LAS with a view …
Grenfell Tower Inquiry (2019) Accepted
P1-45 NPAS helicopter datalink encryption standards
Steps be taken to ensure that the airborne datalink system on every NPAS helicopter observing an incident which involves one of the …
Grenfell Tower Inquiry (2019) Accepted in Part
P1-46 Improve survivor information collection and sharing
The LFB, the MPS, the LAS and the London local authorities all investigate ways of improving the collection of information about survivors …
Grenfell Tower Inquiry (2019) Accepted
P2-1 Establish single construction industry regulator
That the government draw together under a single regulator all the functions relating to the construction industry to which we have referred. …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-2 Review Building Safety Act higher-risk building definition
That the definition of a higher-risk building for the purposes of the Building Safety Act be reviewed urgently. (113.7)
Grenfell Tower Inquiry (2024) Accepted
P2-3 Consolidate fire safety functions under single department
That the government bring responsibility for the functions relating to fire safety currently exercised by MHCLG, the Home Office and the Department …
Grenfell Tower Inquiry (2024) Accepted
P2-4 Appoint Chief Construction Adviser
That the Secretary of State appoint a Chief Construction Adviser with a sufficient budget and staff to provide advice on all matters …
Grenfell Tower Inquiry (2024) Accepted
P2-5 Review statutory guidance and Approved Document B
That the statutory guidance generally, and Approved Document B in particular, be reviewed accordingly and a revised version published as soon as …
Grenfell Tower Inquiry (2024) Accepted
P2-6 Add legal requirements warning to statutory guidance
That a revised version of the guidance contain a clear warning in each section that the legal requirements are contained in the …
Grenfell Tower Inquiry (2024) Accepted
P2-7 Reconsider compartmentation in Approved Document B
New materials and methods of construction and the practice of overcladding existing buildings make the existence of effective compartmentation a questionable assumption …
Grenfell Tower Inquiry (2024) Accepted
P2-8 Require fire engineer calculations for fire spread and evacuation
Calculating the likely rate of fire spread and the time required for evacuation, including the evacuation of those with physical or mental …
Grenfell Tower Inquiry (2024) Accepted
P2-9 Include academics on statutory guidance advisory bodies
That, as far as possible, membership of bodies advising on changes to the statutory guidance should include representatives of the academic community …
Grenfell Tower Inquiry (2024) Accepted
P2-10 Require fire safety strategy from registered fire engineer at Gateway 2
That it be made a statutory requirement that a fire safety strategy produced by a registered fire engineer to be submitted with …
Grenfell Tower Inquiry (2024) Accepted
P2-11 Develop new test methods for evacuation strategy assessments
Assessing whether an external wall system can support a particular evacuation strategy is difficult because the necessary information is not always available. …
Grenfell Tower Inquiry (2024) Accepted
P2-12 Clarify BS 9414 limitations requiring fire engineer assessment
BS 9414 should be approached with caution and we recommend that the government make it clear that it should not be used …
Grenfell Tower Inquiry (2024) Accepted
P2-13 Make construction regulator responsible for product conformity certificates
That the construction regulator should be responsible for assessing the conformity of construction products with the requirements of legislation, statutory guidance and …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-14 Require test results disclosure and transparency for construction products
a) that copies of all test results supporting any certificate issued by the construction regulator be included in the certificate; b) that …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-15 Establish legal recognition and regulation of fire engineer profession
That the profession of fire engineer be recognised and protected by law and that an independent body be established to regulate the …
Grenfell Tower Inquiry (2024) Accepted
P2-16 Increase Masters-level fire engineering course places
That the government take urgent steps to increase the number of places on high-quality masters level courses in fire engineering accredited by …
Grenfell Tower Inquiry (2024) Accepted
P2-17 Define competent fire engineer knowledge and skills
That the government convene a group of practitioner and academic fire engineers and such other professionals as it thinks fit to produce …
Grenfell Tower Inquiry (2024) Accepted
P2-18 Develop fire engineering courses for construction professionals
That the government, working in collaboration with industry and professional bodies, encourage the development of courses in the principles of fire engineering …
Grenfell Tower Inquiry (2024) Accepted
P2-19 Review architect education and training for fire safety
We recognise that both the Architects Registration Board (ARB) and the Royal Institute of British Architects (RIBA) have taken steps since the …
Grenfell Tower Inquiry (2024) Accepted
P2-20 Require principal designer compliance statement at Gateway 2
That it be made a statutory requirement that an application for building control approval in relation to the construction or refurbishment of …
Grenfell Tower Inquiry (2024) Accepted
P2-21 Introduce licensing scheme for principal contractors
That a licensing scheme operated by the construction regulator be introduced for principal contractors wishing to undertake the construction or refurbishment of …
Grenfell Tower Inquiry (2024) Accepted
P2-22 Independent panel review of building control commercial interests
That the government appoint an independent panel to consider whether it is in the public interest for building control functions to be …
Grenfell Tower Inquiry (2024) Accepted
P2-23 Consider national building control authority
We recommend that the same panel consider whether all building control functions should be performed by a national authority. (113.38)
Grenfell Tower Inquiry (2024) Accepted
P2-24 Create cladding materials library for designers
We have referred to the Cladding Materials Library set up by the University of Queensland, which could form the basis of a …
Grenfell Tower Inquiry (2024) Accepted
P2-25 Maintain public record of inquiry recommendations
That it be made a legal requirement for the government to maintain a publicly accessible record of recommendations made by select committees, …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-26 Establish mandatory fire risk assessor accreditation
That the government establish a system of mandatory accreditation to certify the competence of fire risk assessors by setting standards for qualification …
Grenfell Tower Inquiry (2024) Accepted
P2-27 Standardise fire control switches and keys
We are not in a position to determine whether greater standardisation of the fire control switches and keys is required. We therefore …
Grenfell Tower Inquiry (2024) Accepted
P2-28 Require gas valve accessibility inspections every three years
That every gas transporter be required by law to check the accessibility of each [pipeline isolation] valve on its system at least …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-29 Establish independent College of Fire and Rescue
That the government establish [an independent College of Fire and Rescue] immediately with sufficient resources to provide the following services nationally: a) …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-30 College to have permanent staff and training facilities
That [the college] should have a permanent staff of sufficient size to manage its operations and develop its functions in response to …
Grenfell Tower Inquiry (2024) Accepted in Part
P2-31 Inspect London Fire Brigade control room operations
That His Majesty's Inspectorate of Constabulary and Fire and Rescue Services (the Inspectorate) inspect the London Fire Brigade as soon as reasonably …
Grenfell Tower Inquiry (2024) Accepted
P2-32 Inspect London Fire Brigade incident commander training
That as soon as reasonably possible the Inspectorate inspect the London Fire Brigade to examine and report on the arrangements it has …
Grenfell Tower Inquiry (2024) Accepted
P2-33 Inspect London Fire Brigade information management systems
That as soon as reasonably practicable the Inspectorate inspect the LFB to examine and report on its arrangements for collecting, storing and …
Grenfell Tower Inquiry (2024) Accepted
P2-34 London Fire Brigade to establish lessons learned process
That the London Fire Brigade establish effective standing arrangements for collecting, considering and effectively implementing lessons learned from previous incidents, inquests and …
Grenfell Tower Inquiry (2024) Accepted
P2-35 Consider higher power radios for breathing apparatus
That fire and rescue services that continue to use low power intrinsically safe radios as part of breathing apparatus consider reserving them …
Grenfell Tower Inquiry (2024) Accepted