P1-35 Accepted

Require clear floor number markings in high-rise buildings

Grenfell Tower Inquiry · Grenfell Tower Inquiry: Phase 1 Report · Issued 30 October 2019 · Addressed to: UK Government

Source — verbatim from the inquiry

Inquiry recommendation, 33.27

In all high-rise buildings floor numbers be clearly marked on each landing within the stairways and in a prominent place in all lobbies in such a way as to be visible both in normal conditions and in low lighting or smoky conditions.

Grenfell Tower Inquiry, Grenfell Tower Inquiry: Phase 1 Report · 30 Oct 2019 Source PDF →

Published evidence summary

Publicly available evidence relating to this recommendation:

- The government accepted this recommendation in principle in January 2020 (Government Response to Grenfell Tower Inquiry Phase 1 Report, MHCLG, January 2020).
- The Fire Safety (England) Regulations 2022 came into force on 23 January 2023, requiring responsible persons to install wayfinding signage on each stairwell landing and in lobbies visible in normal and low-light conditions (SI 2022/547, legislation.gov.uk).
- The government's Phase 1 progress report stated this recommendation is complete (Quarterly Thematic Update, MHCLG, February 2025).

Response — verbatim from government

UK Government

The government accepted in principle all Phase 1 recommendations directed at central government. The Housing Secretary Robert Jenrick presented the formal response to Parliament on 21 January 2020, committing to new duties on building owners and managers through the Fire Safety Bill and Building Safety Bill, including requirements for premises information boxes, floor plans, lift inspections, fire door checks, evacuation signage, and fire safety instructions to residents.

UK Government · 21 Jan 2020 Written response →

Evidence trail — what's actually happened since

  • 26 Feb 2025 Completed via the Fire Safety (England) Regulations 2022 (in force 23 January 2023). Responsible persons must install wayfinding signage on each stairway landing visible in low lighting conditions. Source →

Each entry above links to a primary source — gov.uk written statement, consultation response document, or inspection report. The Index does not characterise government intent; it tracks what has been published.

How this page is built

Source and Response are verbatim from primary documents. The Evidence trail records published activity since — written statements, consultation outcomes, inspection findings, parliamentary references. The Index does not paraphrase or characterise intent; it tracks what has been published. Where the evidence is the absence of action (a missed deadline, a slipped timetable), that absence is documented from primary sources rather than inferred.

This recommendation's data is verified periodically against primary sources. The Index is monitored for staleness weekly.