P2-8 Accepted

Require fire engineer calculations for fire spread and evacuation

Grenfell Tower Inquiry · Grenfell Tower Inquiry: Phase 2 Report · Issued 4 September 2024 · Addressed to: UK Government

Source — verbatim from the inquiry

Inquiry recommendation

Calculating the likely rate of fire spread and the time required for evacuation, including the evacuation of those with physical or mental impairments, are matters for a qualified fire engineer. We do not think that it would be helpful to attempt to include in Approved Document B an indication of what would be acceptable because each building is different, but we recommend that the guidance draw attention to the need to make a calculation of that kind. (113.13)

Grenfell Tower Inquiry, Grenfell Tower Inquiry: Phase 2 Report · 4 Sep 2024 Source PDF →

Published evidence summary

Publicly available evidence relating to this recommendation:

- The government accepted this recommendation in February 2025, stating it will be addressed through the ongoing Approved Document B review led by the Building Safety Regulator (Government Response to Grenfell Tower Inquiry Phase 2 Report, MHCLG, February 2025).
- The government's annual report stated fire spread guidance development is occurring through the Approved Document B review, with industry engagement expected to conclude in 2026 (Annual Report on Progress, MHCLG, February 2026).

Response — verbatim from government

UK Government — initial response

The government accepts this recommendation. We will address this recommendation through the ongoing Approved Document B review, led by the Building Safety Regulator. The review and industry engagement will explore ways through which Approved Document B can be updated to provide further guidance on external fire spread, while sufficiently supporting designers in considering fire spread via the external wall.

UK Government · 16 Jan 2025 Written response →

UK Government — follow-up

The government accepts this recommendation. We will address this recommendation through the ongoing Approved Document B review, led by the Building Safety Regulator. The review and industry engagement will explore ways through which Approved Document B can be updated to provide further guidance on external fire spread, while sufficiently supporting designers in considering fire spread via the external wall.

UK Government · 26 Feb 2025 Written response →

Evidence trail — what's actually happened since

  • 1 Feb 2026 Fire spread guidance development occurring through the ongoing Approved Document B review, led by the Building Safety Regulator. Industry engagement exploring external wall fire spread guidance enhancements. (Covers Recommendations 5, 6, 7, 8, 9, 11, 12.) Source →

Each entry above links to a primary source — gov.uk written statement, consultation response document, or inspection report. The Index does not characterise government intent; it tracks what has been published.

How this page is built

Source and Response are verbatim from primary documents. The Evidence trail records published activity since — written statements, consultation outcomes, inspection findings, parliamentary references. The Index does not paraphrase or characterise intent; it tracks what has been published. Where the evidence is the absence of action (a missed deadline, a slipped timetable), that absence is documented from primary sources rather than inferred.

This recommendation's data is verified periodically against primary sources. The Index is monitored for staleness weekly.