Network Rail
Private Sector• Ballast surface improvement works were completed at the crossing point on 20 July 2016. • Edges of any trip hazards have been clearly marked to highlight them to the public.
View full response
There is a timber ballast retainer on the western (estuary) approach to the level crossing which forms a step up to track level including the rubber deck panels installed on the track itself: This step is very prominent and obvious to users but time to time the ballast can wear down and so it is built up when required to minimise the stepping required. If Mr Younghusband entered the track at the level crossing it may be possible that he tripped on a metal fitting known as a deflector or chain guard which is attached to the edge of the decking panel facing the track: It is not clear if this is what his family referred to as 'standing proud of the track bed'_ but these fittings are not in the way of anyone crossing the track over the decking as intended. The last routine inspection of the level crossing prior to Mr Younghusbands death took place on 16 September 2015. The LCM noted that the track ballast was low to the level crossing so he built it up again: A more recent inspection took place on 4th March 2016 followed by another site check 21 June 2016 revealed that the ballast had moved again sO in late June the LCM discussed with maintenance colleagues the of more substantial 'ballast boxes' s0 as to contain movement more effectively and minimise the stepping involved. am happy to confirm that ballast surface improvement works were completed at the crossing point on 20 July 2016_ Further edges of any trip hazards have been clearly marked in order to highlight them to the public. hope that this response provides you with adequate assurance that the issues you have identified have been properly considered and addressed If you would like any further information or assistance please do not hesitate to contact me_