On the basis of a report by the Comptroller and Auditor General, we took evidence...

Conclusion
On the basis of a report by the Comptroller and Auditor General, we took evidence from the Department for Transport (the Department), Transport for London (TfL) and Crossrail Ltd on progress with the Crossrail programme.1
Government Response Not Addressed
HM Government Not Addressed
Introduction from the Committee Crossrail is a complex major programme to run new, direct rail services between Reading and Heathrow Airport at the western ends of the railway, to Shenfield in Essex and Abbey Wood in south-east London at the eastern ends. It is the world’s first truly digital railway of its size and scale that will have no peers in the world. Construction work on the programme started in 2009 and tunnelling began in 2012. The majority of major construction work is complete and Crossrail Ltd is now transferring assets, such as stations, to Rail for London Infrastructure (RfLi) and London Underground who, along with Network Rail, will maintain and operate different parts of the railway. When complete, the railway will be around 73 miles (118 kilometres) long, stopping at 41 stations, including 10 new stations and 26 miles (42 kilometres) of new tunnels. Once Crossrail is open, it will become part of Transport for London’s (TfL’s) underground and overground rail network and be known as the Elizabeth line. The Department for Transport (the Department) and Transport for London (TfL) are jointly sponsoring the programme. Crossrail Ltd is an arm’s-length body specifically created to deliver the programme and is wholly-owned by TfL. This is the fourth time the Committee has reported on the Crossrail programme. The last two reports followed significant cost and schedule increases in 2018. When we last reported in July 2019, programme funding had increased by £2.8 billion to £17.6 billion, and Crossrail Ltd expected the central section of the railway to open between October 2020 and March 2021. Since then, Crossrail Ltd’s estimate of the cost to complete the Elizabeth line has increased to £18.9 billion, 28% more than the £14.8 billion budget set in 2010. It expects to open the central section between February and June 2022, with full east-west services beginning either December 2022 or May 2023 to align with National Rail timetable changes. Based on a report by the National Audit Office, the Committee took evidence on 19 July 2021 from the Department for Transport. The Committee published its report on 29 October 2021. This is the government’s response to the Committee’s report.