SHEE-39 Historic

Develop simple methods for bridging shafts in passenger compartments

Sheen Inquiry · Sheen Inquiry — Final Report · Issued 24 July 1987

Source — verbatim from the inquiry

Inquiry recommendation

While suggestions have been made as to the desirability of finding some means of bridging these shafts, it is the view of the Department of Transport that this is not really practicable. the Court is not convinced by this. It considers that simple methods of bridging should be developed. For example, split deckhead panels hinged in way of the sides of a longitudinal passage could be arranged so that with the ship on her beam ends one of these panels could be brought down and made to bridge the gap. It would be self-supporting if it extended fore and aft beyond the sides of the transverse alley way. There may well be better methods, but some such simple device should be developed and made a requirement.

Sheen Inquiry, Sheen Inquiry — Final Report · 24 Jul 1987 Source PDF →

Response — verbatim from government

No formal government response recorded

The Index has not yet recorded a verbatim government response to this recommendation.

Evidence trail — what's actually happened since

No published activity has been recorded against this recommendation yet.

Each entry above links to a primary source — gov.uk written statement, consultation response document, or inspection report. The Index does not characterise government intent; it tracks what has been published.

How this page is built

Source and Response are verbatim from primary documents. The Evidence trail records published activity since — written statements, consultation outcomes, inspection findings, parliamentary references. The Index does not paraphrase or characterise intent; it tracks what has been published. Where the evidence is the absence of action (a missed deadline, a slipped timetable), that absence is documented from primary sources rather than inferred.

This recommendation's data is verified periodically against primary sources. The Index is monitored for staleness weekly.