Require Port Authorities to provide rolling weigh-bridges for freight vehicles
Sheen Inquiry · Sheen Inquiry — Final Report · Issued 24 July 1987
Source — verbatim from the inquiry
●Inquiry recommendation
In view of the uncertainty as to the actual weights of many freight vehicles every effort should be made to persuade, or even require, Port Authorities to provide rolling weigh-bridges, possibly of the loadcell type, where all freight vehicles coming into a port will be automatically weighed and issued with a weight certificate, to be attached to the vehicle. If such weigh bridges were fitted in way of each ramp it would be possible to pass this information electronically to the loadicator, thus updating the calculated condition of the ship if the loading officer punched in vehicle locations. The Court concludes that the Department should encourage Operators to investigate immediately the technical and practical aspects of the proposal. As the calculation of fluid KG (or GM) of a Ro-Ro vessel prior to departure should be obligatory such a system would be of real assistance in carrying this out.
Sheen Inquiry, Sheen Inquiry — Final Report · 24 Jul 1987 Source PDF →
Response — verbatim from government
●No formal government response recorded
The Index has not yet recorded a verbatim government response to this recommendation.
Evidence trail — what's actually happened since
No published activity has been recorded against this recommendation yet.
Each entry above links to a primary source — gov.uk written statement, consultation response document, or inspection report. The Index does not characterise government intent; it tracks what has been published.
How this page is built
Source and Response are verbatim from primary documents. The Evidence trail records published activity since — written statements, consultation outcomes, inspection findings, parliamentary references. The Index does not paraphrase or characterise intent; it tracks what has been published. Where the evidence is the absence of action (a missed deadline, a slipped timetable), that absence is documented from primary sources rather than inferred.
This recommendation's data is verified periodically against primary sources. The Index is monitored for staleness weekly.