Public inquiry · Parliamentary scrutiny

Parliamentary activity

Grenfell Tower Inquiry. Read indexed debates, questions, statements and early day motions, with links to the original parliamentary records.

202 indexed mentions for this inquiry Earliest recorded mention: 21 June 2017

Parliamentary mentions

202 matching mentions · newest first

Procurement Act 2023 investigations

Written Ministerial Statement House of Commons
Pat McFadden · Labour Answering body: Cabinet Office
Parliamentary excerpt

We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuing full accountability, including through the criminal justice process. Further to the statement made by the Parliamentary Secretary, Minis...

Recorded statement

Answering body: Cabinet Office

We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.

When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuing full accountability, including through the criminal justice process. Further to the statement made by the Parliamentary Secretary, Minister Gould on 26 February 2025, formal notices were issued to the seven suppliers named in that statement commencing debarment investigations under new powers in section 60 of the Procurement Act 2023.

Since that notification, my officials have been working to progress these investigations which has included seeking views from relevant stakeholders. The Crown Prosecution Service and the Metropolitan Police Service have made me aware that they have significant concerns that the debarment investigations could lead to unintentional prejudice to both the criminal investigation and to any future criminal proceedings and the Government has accepted their representations that the criminal investigation must take priority.

At the request of the CPS and MPS, I have therefore decided to pause these 7 debarment investigations until criminal investigations and any prosecutions are concluded. I recognise that this decision will feel like yet another delay in the community’s long wait for justice and I have not taken this decision lightly. I understand how important the criminal investigation is to the bereaved families, survivors and the wider community, which is why I am taking this action to protect the integrity of any subsequent criminal proceedings in pursuit of delivering justice. The government fully supports the MPS in its investigation.

The debarment investigations are being paused without any conclusion having been reached. The pause does not in any way prevent contracting authorities from making their own decisions in respect of the eligibility of these suppliers to bid in their procurements and be awarded public contracts, provided they do so in accordance with the Act. The government remains committed to holding organisations to account and I am considering what other steps can be taken to ensure meaningful action to address failings related to the Grenfell Tower fire. We will continue to engage with the MPS and CPS to ensure any future action does not impede the work of the police.

If the criminal process results in convictions, where appropriate, I will re-commence or launch new investigations which may enable stronger action in relation to procurement than could be taken at the present time. The government will continue to address all of the Inquiry’s recommendations and the issues the tragedy exposed.

Original parliamentary record

Procurement Act 2023 investigations

Written Ministerial Statement House of Lords
Baroness Anderson of Stoke-on-Trent · Labour Answering body: Cabinet Office
Parliamentary excerpt

My Right Honourable friend, the Chancellor of the Duchy of Lancaster, the Rt Hon. Pat McFadden MP, has today made the following statement:We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuin...

Recorded statement

Answering body: Cabinet Office

My Right Honourable friend, the Chancellor of the Duchy of Lancaster, the Rt Hon. Pat McFadden MP, has today made the following statement:

We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.

When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuing full accountability, including through the criminal justice process. Further to the statement made by the Parliamentary Secretary, Minister Gould on 26 February 2025, formal notices were issued to the seven suppliers named in that statement commencing debarment investigations under new powers in section 60 of the Procurement Act 2023.

Since that notification, my officials have been working to progress these investigations which has included seeking views from relevant stakeholders. The Crown Prosecution Service and the Metropolitan Police Service have made me aware that they have significant concerns that the debarment investigations could lead to unintentional prejudice to both the criminal investigation and to any future criminal proceedings and the Government has accepted their representations that the criminal investigation must take priority.

At the request of the CPS and MPS, I have therefore decided to pause these 7 debarment investigations until criminal investigations and any prosecutions are concluded. I recognise that this decision will feel like yet another delay in the community’s long wait for justice and I have not taken this decision lightly. I understand how important the criminal investigation is to the bereaved families, survivors and the wider community, which is why I am taking this action to protect the integrity of any subsequent criminal proceedings in pursuit of delivering justice. The government fully supports the MPS in its investigation.

The debarment investigations are being paused without any conclusion having been reached. The pause does not in any way prevent contracting authorities from making their own decisions in respect of the eligibility of these suppliers to bid in their procurements and be awarded public contracts, provided they do so in accordance with the Act. The government remains committed to holding organisations to account and I am considering what other steps can be taken to ensure meaningful action to address failings related to the Grenfell Tower fire. We will continue to engage with the MPS and CPS to ensure any future action does not impede the work of the police.

If the criminal process results in convictions, where appropriate, I will re-commence or launch new investigations which may enable stronger action in relation to procurement than could be taken at the present time. The government will continue to address all of the Inquiry’s recommendations and the issues the tragedy exposed.

Original parliamentary record

Residential Personal Emergency Evacuation Plans (Residential PEEPs)

Written Ministerial Statement House of Lords
Lord Khan of Burnley · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Parliamentary Under Secretary of State for Building Safety, Fire and Local Growth (Alex Norris MP) has today made the following statement: The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans. The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-a...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Parliamentary Under Secretary of State for Building Safety, Fire and Local Growth (Alex Norris MP) has today made the following statement:

The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans.

The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-awaited step forward in improving the fire safety and evacuation of vulnerable residents who were so badly let down on the night of the tragedy. It applies to residents living in England in high-rise residential buildings (at least 7 storeys or 18 metres high), and 11-18 metre high buildings with a simultaneous evacuation strategy.

Through these Regulations, residents with physical and mental disabilities and impairments will be entitled to:

a person-centred fire risk assessment to consider their specific individual risks and ability to evacuate in the event of a fire;

the measures that could be reasonably and proportionately introduced to mitigate against their risks and aid their evacuation;

a written statement recording what they should do in a fire and;

provision of information to their local fire and rescue service (where the resident consents to the information being shared) so they know where the most vulnerable residents live and can support their evacuation or rescue in the event of a fire.

The regulations also mandate production of whole-building evacuation plans, shared with local fire and rescue services.

The laying of the Regulations addresses recommendations 33.22c, 33.22e, 33.22f (now nos. 59, 60 and 61) from Phase 1 of the Grenfell Tower Inquiry.

The government has committed funding this year to begin this important work by supporting social housing providers to deliver Residential PEEPs for their renters. Future years’ funding will be confirmed through the Spending Review and business planning processes.

In addition, government is today publishing a factsheet and toolkit to support building owners/managers as they develop Residential PEEPs. This toolkit contains real-life and proven initiatives to support vulnerable residents which have already been successfully deployed at scale.

The Regulations will come into force on 6 April 2026.

The government is committed to continued and full engagement with stakeholders as the policy is operationalised to ensure that it addresses the needs of users and reflects their lived experience. Specifically, we will:

Continue to engage key stakeholders on draft statutory guidance to support building owners/managers in fulfilling the requirements of the regulations. The guidance will be published in the autumn.

Set up a stakeholder advisory panel with representatives of disability stakeholders and building owners/managers, to identify and review new initiatives for inclusion in the toolkit.

Continue to listen to stakeholders as Residential PEEPs beds in, as part of monitoring the impact and effectiveness of the policy.

Original parliamentary record

Residential Personal Emergency Evacuation Plans (Residential PEEPs)

Written Ministerial Statement House of Commons
Alex Norris · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans. The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-awaited step forward in improving the fire safety and evacuation of vulnerable residents who were so badly let down on the night of the tragedy. It applies to reside...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans.

The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-awaited step forward in improving the fire safety and evacuation of vulnerable residents who were so badly let down on the night of the tragedy. It applies to residents living in England in high-rise residential buildings (at least 7 storeys or 18 metres high), and 11-18 metre high buildings with a simultaneous evacuation strategy.

Through these Regulations, residents with physical and mental disabilities and impairments will be entitled to:

a person-centred fire risk assessment to consider their specific individual risks and ability to evacuate in the event of a fire;

the measures that could be reasonably and proportionately introduced to mitigate against their risks and aid their evacuation;

a written statement recording what they should do in a fire and;

provision of information to their local fire and rescue service (where the resident consents to the information being shared) so they know where the most vulnerable residents live and can support their evacuation or rescue in the event of a fire.

The regulations also mandate production of whole-building evacuation plans, shared with local fire and rescue services.

The laying of the Regulations addresses recommendations 33.22c, 33.22e, 33.22f (now nos. 59, 60 and 61) from Phase 1 of the Grenfell Tower Inquiry.

The government has committed funding this year to begin this important work by supporting social housing providers to deliver Residential PEEPs for their renters. Future years’ funding will be confirmed through the Spending Review and business planning processes.

In addition, government is today publishing a factsheet and toolkit to support building owners/managers as they develop Residential PEEPs. This toolkit contains real-life and proven initiatives to support vulnerable residents which have already been successfully deployed at scale.

The Regulations will come into force on 6 April 2026.

The government is committed to continued and full engagement with stakeholders as the policy is operationalised to ensure that it addresses the needs of users and reflects their lived experience. Specifically, we will:

Continue to engage key stakeholders on draft statutory guidance to support building owners/managers in fulfilling the requirements of the regulations. The guidance will be published in the autumn.

Set up a stakeholder advisory panel with representatives of disability stakeholders and building owners/managers, to identify and review new initiatives for inclusion in the toolkit.

Continue to listen to stakeholders as Residential PEEPs beds in, as part of monitoring the impact and effectiveness of the policy.

Original parliamentary record

Building Safety Regulator: Operating Costs

Written Question House of Lords
Lord Booth · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask His Majesty's Government, further to the Written Answer by Baroness Anderson of Stoke-on-Trent on 10 April (HL6032), what estimate they have made of the annual cost of the Building Standards Regulatory Body.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

Currently building standards are regulated by the Building Safety Regulator. The annual net cost of Building Safety Regulator is expected to be £43m for 2025/26.

Government has accepted the recommendation made in the Grenfell Tower Inquiry’s Phase 2 report to create a ‘single construction regulator’ for the building system. Proposals for design of the future regulator will be published and consulted on later this year.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
Vikki Slade · Liberal Democrat Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, what assessment she has made of the potential merits of pausing the proposed move from the British fire door safety testing standard to the European Standard until the review of that standard has been completed.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The withdrawal of National Classes fire testing standards (BS 476) from Approved Document B in favour of the European Standard (BS EN 13501) aimed to enhance fire protection by simplifying compliance routes within the guidance. This change makes it easier and clearer to ensure products meet required standards and enables simpler performance comparison.

The suitability of BS 476 and the transition to the EN standard was scrutinised during the Grenfell Tower Inquiry. The EN suite of standards, unlike the BS 476 series, is constantly reviewed, periodically updated, and does not rely on withdrawn standards. The EN suite of standards is therefore seen as more suitable in the long term. The consultation response published alongside the Written Statement on 2 September 2024 shows a majority of respondents were in support of moving to the European Standard.

We recognised the potential economic impact of this transition, particularly for sectors such as bespoke timber fire doors, cavity barriers, and smoke vents, through the consultation response impact analysis. In response, a five-year transition period was introduced for fire resistance classifications, running from 2 September 2024 to 2 September 2029. This extended period was developed in consultation with industry to allow sufficient time for retesting and certification under the new standard.

While concerns have been raised about the timing of the transition, we remain committed to the planned timeline. The Building Safety Regulator (BSR) will continue to monitor the impact of the change and support industry through the transition. BSR will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standards of building under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
Vikki Slade · Liberal Democrat Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, what the evidential basis is for removing the national BS 476-22 classification for fire door resistance from Approved Document B.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The withdrawal of National Classes fire testing standards (BS 476) from Approved Document B in favour of the European Standard (BS EN 13501) aimed to enhance fire protection by simplifying compliance routes within the guidance. This change makes it easier and clearer to ensure products meet required standards and enables simpler performance comparison.

The suitability of BS 476 and the transition to the EN standard was scrutinised during the Grenfell Tower Inquiry. The EN suite of standards, unlike the BS 476 series, is constantly reviewed, periodically updated, and does not rely on withdrawn standards. The EN suite of standards is therefore seen as more suitable in the long term. The consultation response published alongside the Written Statement on 2 September 2024 shows a majority of respondents were in support of moving to the European Standard.

We recognised the potential economic impact of this transition, particularly for sectors such as bespoke timber fire doors, cavity barriers, and smoke vents, through the consultation response impact analysis. In response, a five-year transition period was introduced for fire resistance classifications, running from 2 September 2024 to 2 September 2029. This extended period was developed in consultation with industry to allow sufficient time for retesting and certification under the new standard.

While concerns have been raised about the timing of the transition, we remain committed to the planned timeline. The Building Safety Regulator (BSR) will continue to monitor the impact of the change and support industry through the transition. BSR will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standards of building under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
David Simmonds · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, with reference to the Written Statement of 2 September 2024 on Building Safety, HCWS62, what the evidential basis is for the proposition that the European standard (BS EN 13501) is more rigorous and robust than the British fire door testing standard (BS 476-22).

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The withdrawal of National Classes fire testing standards (BS 476) from Approved Document B in favour of the European Standard (BS EN 13501) aimed to enhance fire protection by simplifying compliance routes within the guidance. This change makes it easier and clearer to ensure products meet required standards and enabling simpler performance comparison.

The suitability of BS 476 and the transition to the EN standard was also scrutinised during the Grenfell Tower Inquiry. The EN suite of standards is constantly reviewed, periodically updated, and does not rely on withdrawn standards and is therefore seen as more suitable in the long term. The consultation response published alongside the Written Statement on 2 September 2024 shows a majority of respondents were in support of moving to the European Standard.

The Building Safety Regulator will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of buildings under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
David Simmonds · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, what assessment she has made of the potential impact of the proposed transition period for moving from the BS 476-22 national fire door safety testing standard to the EN1634-1 standard on (a) the productivity of and (b) costs to timber fire door manufacturers.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

On 2 September 2024, the Government announced the withdrawal of National Classes fire testing standards from Approved Document B, ending the dual classification system in favour of the European Standard (BS EN 13501). This change aimed to enhance fire protection by simplifying compliance routes within Approved Document B (ADB) and followed scrutiny during the Grenfell Tower Inquiry where the suitability of BS 476 was questioned.

The Government recognises the potential economic impact that could result from this change. The overall impact and associated benefits were carefully evaluated to inform the policy decision and are set out in the Impact Assessment that accompanied the policy announcement.

Market analysis and sector engagement showed limited impact on developers for the reaction to fire classification. Changes took effect on 2nd March 2025, with a six-month transition period provided for fire reaction.

We identified a larger impact on sectors involved in bespoke wooden fire doors, cavity barriers, smoke vents, and roofs due to re-testing requirements for the fire resistance classification. Concerns were also raised about testing site capacity. An extended transition period of 5 years was developed through discussions with the sector allowing manufacturers time to retest their products ahead of compliance with BS EN 13501 coming into force on 2nd September 2029.

We and the Building Safety Regulator will continue to support industry to develop new standards and testing capacity to minimise disruption to supply chains through the transitional period.

The Building Safety Regulator will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of buildings under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
David Simmonds · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, whether her Department has made an estimate of the testing site capacity required to carry-out fire door tests for the new European Standard (EN1634-1) classification within the proposed transition period.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

On 2 September 2024, the Government announced the withdrawal of National Classes fire testing standards from Approved Document B, ending the dual classification system in favour of the European Standard (BS EN 13501). This change aimed to enhance fire protection by simplifying compliance routes within Approved Document B (ADB) and followed scrutiny during the Grenfell Tower Inquiry where the suitability of BS 476 was questioned.

The Government recognises the potential economic impact that could result from this change. The overall impact and associated benefits were carefully evaluated to inform the policy decision and are set out in the Impact Assessment that accompanied the policy announcement.

Market analysis and sector engagement showed limited impact on developers for the reaction to fire classification. Changes took effect on 2nd March 2025, with a six-month transition period provided for fire reaction.

We identified a larger impact on sectors involved in bespoke wooden fire doors, cavity barriers, smoke vents, and roofs due to re-testing requirements for the fire resistance classification. Concerns were also raised about testing site capacity. An extended transition period of 5 years was developed through discussions with the sector allowing manufacturers time to retest their products ahead of compliance with BS EN 13501 coming into force on 2nd September 2029.

We and the Building Safety Regulator will continue to support industry to develop new standards and testing capacity to minimise disruption to supply chains through the transitional period.

The Building Safety Regulator will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of buildings under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
David Simmonds · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, whether her Department plans to pause the proposed move from the British fire door safety testing standard (BS 476-22) to the European Standard (EN 1634-1) until the current review of the European Standard has been completed.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

On 2 September 2024, the Government announced the withdrawal of National Classes fire testing standards from Approved Document B, ending the dual classification system in favour of the European Standard (BS EN 13501). This change aimed to enhance fire protection by simplifying compliance routes within Approved Document B (ADB) and followed scrutiny during the Grenfell Tower Inquiry where the suitability of BS 476 was questioned.

The Government recognises the potential economic impact that could result from this change. The overall impact and associated benefits were carefully evaluated to inform the policy decision and are set out in the Impact Assessment that accompanied the policy announcement.

Market analysis and sector engagement showed limited impact on developers for the reaction to fire classification. Changes took effect on 2nd March 2025, with a six-month transition period provided for fire reaction.

We identified a larger impact on sectors involved in bespoke wooden fire doors, cavity barriers, smoke vents, and roofs due to re-testing requirements for the fire resistance classification. Concerns were also raised about testing site capacity. An extended transition period of 5 years was developed through discussions with the sector allowing manufacturers time to retest their products ahead of compliance with BS EN 13501 coming into force on 2nd September 2029.

We and the Building Safety Regulator will continue to support industry to develop new standards and testing capacity to minimise disruption to supply chains through the transitional period.

The Building Safety Regulator will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of buildings under review in England.

Original parliamentary record

Doors: Fire Prevention

Written Question House of Commons
David Simmonds · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, what the evidential basis is for proposals to remove the national BS 476-22 classification for fire door resistance from Approved Document B.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

On 2 September 2024, the Government announced the withdrawal of National Classes fire testing standards from Approved Document B, ending the dual classification system in favour of the European Standard (BS EN 13501). This change aimed to enhance fire protection by simplifying compliance routes within Approved Document B (ADB) and followed scrutiny during the Grenfell Tower Inquiry where the suitability of BS 476 was questioned.

The Government recognises the potential economic impact that could result from this change. The overall impact and associated benefits were carefully evaluated to inform the policy decision and are set out in the Impact Assessment that accompanied the policy announcement.

Market analysis and sector engagement showed limited impact on developers for the reaction to fire classification. Changes took effect on 2nd March 2025, with a six-month transition period provided for fire reaction.

We identified a larger impact on sectors involved in bespoke wooden fire doors, cavity barriers, smoke vents, and roofs due to re-testing requirements for the fire resistance classification. Concerns were also raised about testing site capacity. An extended transition period of 5 years was developed through discussions with the sector allowing manufacturers time to retest their products ahead of compliance with BS EN 13501 coming into force on 2nd September 2029.

We and the Building Safety Regulator will continue to support industry to develop new standards and testing capacity to minimise disruption to supply chains through the transitional period.

The Building Safety Regulator will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of buildings under review in England.

Original parliamentary record

Housing: Standards

Written Question House of Commons
Suella Braverman · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, whether her Department has made an assessment of the number of complaints on the quality of construction from new home owners to developers.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The Building Regulations set out high-level functional requirements that most building work – including all new build housing – must meet. The regulations are supported by statutory guidance in the form of Approved Documents (ADs) which set out in more detail how to meet the functional requirements.

It is the responsibility of the building designer to comply with the requirements of the Building Regulations. The relevant building control authority will determine whether building work meets those requirements.

The Building Safety Act and the Government’s response to the Grenfell Tower Inquiry set out how we will strengthen building control procedures, including establishing an independent panel to review the way in which building control is delivered in England. In October 2023, new procedures came into force which provide strengthened regulatory oversight of Building Regulations before, during, and on completion of higher-risk building work. This will ensure safer, better-quality buildings, without systemic defects.

To further reinforce standards, we remain committed to introducing a statutory New Homes Ombudsman scheme that developers will have to join, with an accompanying Code of Practice about the standards of conduct and standards of quality of work expected of members.

Original parliamentary record

Housing: Construction

Written Question House of Commons
Suella Braverman · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, whether her Department has made an assessment of the quality of newly constructed newbuilds.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The Building Regulations set out high-level functional requirements that most building work – including all new build housing – must meet. The regulations are supported by statutory guidance in the form of Approved Documents (ADs) which set out in more detail how to meet the functional requirements.

It is the responsibility of the building designer to comply with the requirements of the Building Regulations. The relevant building control authority will determine whether building work meets those requirements.

The Building Safety Act and the Government’s response to the Grenfell Tower Inquiry set out how we will strengthen building control procedures, including establishing an independent panel to review the way in which building control is delivered in England. In October 2023, new procedures came into force which provide strengthened regulatory oversight of Building Regulations before, during, and on completion of higher-risk building work. This will ensure safer, better-quality buildings, without systemic defects.

To further reinforce standards, we remain committed to introducing a statutory New Homes Ombudsman scheme that developers will have to join, with an accompanying Code of Practice about the standards of conduct and standards of quality of work expected of members.

Original parliamentary record

Fire and Rescue Services: Standards

Written Question House of Commons
Tom Rutland · Labour Answering body: Home Office
Parliamentary excerpt

To ask the Secretary of State for the Home Department, what steps her Department is taking to establish a national structure to set national standards across the UK Fire Service.

Government answer

Answering body: Home Office

The Government funds the independent Fire Standards Board (FSB) to develop and maintain a comprehensive set of professional standards for fire and rescue services in England. The FSB has published 19 national standards for fire and rescue services: these cover a range of topics relating to operational management, leadership and ethics.

The Government has accepted, in principle, the Grenfell Tower Inquiry’s recommendation to establish a national college of fire and rescue. The Inquiry report suggested a range of potential functions for a college to fulfil, including the development of policies and procedures to ensure both the effectiveness of fire and rescue services and the safety of firefighters and the public. The Government response to the Inquiry’s report notes that a necessary first step in the process will be to consult on the functions a college should have and how it could best be structured and delivered. We expect to launch this consultation later in the year.

Any future college function relating to national standards would build on the work already undertaken by the FSB.

Original parliamentary record

Fire and Rescue Services: Finance

Written Question House of Commons
Dr Roz Savage · Liberal Democrat Answering body: Home Office
Parliamentary excerpt

To ask the Secretary of State for the Home Department, whether she has plans to allocate additional funding to fire and rescue services to improve their wildfire and flood response rates.

Government answer

Answering body: Home Office

Government funding for fire and rescue services is provided by the Ministry of Housing, Communities and Local Government (MHCLG) through the Local Government Finance Settlement in the form of revenue support grant (RSG) and retained business rates.

As a recommendation in phase 2 of the Grenfell Tower Inquiry, the Prime Minister has announced a Machinery of Government change, which will see all responsibility for fire and rescue transfer to MHCLG from 1st April.

Overall, fire and rescue authorities will receive around £2.87 billion in 2024/25. Additionally, Government supports fire and rescue authorities in responding to flood incidents by providing national resilience High Volume Pump (HVP) capability comprising 45 HVPs. These are available to be used by fire & rescue services across the country during major flood incidents.

The Government maintains regular engagement with the National Fire Chiefs Council to monitor and review sector led improvements to wildfire response and mitigation. In addition, the Government will continue to work closely with stakeholders across the sector to ensure fire and rescue services have the resources they need to protect communities.

Original parliamentary record

Fire and Rescue Services: Capital Investment

Written Question House of Commons
Dr Roz Savage · Liberal Democrat Answering body: Home Office
Parliamentary excerpt

To ask the Secretary of State for the Home Department, whether her Department has plans to introduce dedicated capital investment funding for fire and rescue services to help improve (a) infrastructure, (b) fleet renewal and (c) training facilities.

Government answer

Answering body: Home Office

Government funding for fire and rescue services is provided by the Ministry of Housing, Communities and Local Government (MHCLG) through the Local Government Finance Settlement in the form of revenue support grant (RSG) and retained business rates.

As a recommendation in phase 2 of the Grenfell Tower Inquiry, the Prime Minister has announced a Machinery of Government change, which will see all responsibility for fire and rescue transfer to MHCLG from 1st April.

Original parliamentary record

Public Inquiries

Written Question House of Commons
Kevin Hollinrake · Conservative Answering body: Cabinet Office
Parliamentary excerpt

To ask the Minister for the Cabinet Office, with reference to para 144 of the UK Government Response to the Grenfell Tower Inquiry Phase 2 Report, CP1248, published in February 2025, what his planned timetable is for the publicly accessible record, and whether it will be hosted on gov.uk.

Government answer

Answering body: Cabinet Office

As confirmed in the government’s response to the Grenfell Tower Inquiry’s recommendation 25, the government will establish a record on GOV.UK of all recommendations made by public inquiries since 2024, and will consider making this an enduring legal requirement. We will update parliament about this in due course.

Original parliamentary record

Tenant Management Organisations: Freedom of Information

Written Question House of Commons
Kevin Hollinrake · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, with reference to para 129 of the UK Government Response to the Grenfell Tower Inquiry Phase 2 Report, CP1248, published in February 2025, whether the extension of the Freedom of Information Act to Tenant Management Organisations (a) is limited to matters relating to social housing and (b) covers all information held by the organisation; and what her planned timetable is for secondary legislation on the issue.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The government is committed to increasing transparency in the social rented sector, including by enabling residents of Tenant Management Organisations (TMOs) to request access to information about the management of their homes in the same way as other social tenants.

We will work closely with TMOs, local authorities and residents of homes managed by TMOs to consider how best to implement the requirements. Our priority will be to ensure tenants can access as much information as possible on their housing services. We will set out next steps in due course.

Original parliamentary record

Grenfell Tower Inquiry

Written Question House of Commons
Kevin Hollinrake · Conservative Answering body: Cabinet Office
Parliamentary excerpt

To ask the Minister for the Cabinet Office, with reference to the Grenfell Tower Inquiry Phase 2 Report: Government response, published on 26 February 2025, what her planned timetable is for the publicly available record of public inquiry recommendations.

Government answer

Answering body: Cabinet Office

As confirmed in the government’s response to the Grenfell Tower Inquiry’s recommendation 25, the government will establish a record on GOV.UK of all recommendations made by public inquiries since 2024, and will consider making this an enduring legal requirement. We will update parliament about this in due course.

Original parliamentary record

Grenfell Tower Inquiry

Written Question House of Commons
Kevin Hollinrake · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, with reference to the Grenfell Tower Inquiry Phase 2 Report: Government response, published on 26 February 2025, whether she plans to implement recommendations accepted in principle in full.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The government has accepted all the findings of the Grenfell Inquiry Phase 2 report, and we will take forward all of the recommendations. We are committed to fixing all of the problems highlighted by the recommendations, including those we have accepted in principle. We will make sure that we achieve the best outcomes for the public where the implementation of a recommendation requires further consideration, such as through public consultation.

Where the delivery of recommendations or wider commitments we have made in the response document require legislation, we will deliver these measures as soon as parliamentary time allows.

Original parliamentary record

Buildings: Safety

Written Question House of Commons
Kevin Hollinrake · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, with reference to the Grenfell Tower Inquiry Phase 2 Report: Government response, published on 26 February 2025, what her planned timetable is for (a) primary and (b) secondary legislation on (i) fire and (ii) building safety.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

The government has accepted all the findings of the Grenfell Inquiry Phase 2 report, and we will take forward all of the recommendations. We are committed to fixing all of the problems highlighted by the recommendations, including those we have accepted in principle. We will make sure that we achieve the best outcomes for the public where the implementation of a recommendation requires further consideration, such as through public consultation.

Where the delivery of recommendations or wider commitments we have made in the response document require legislation, we will deliver these measures as soon as parliamentary time allows.

Original parliamentary record

Death

Written Question House of Commons
Mrs Elsie Blundell · Labour Answering body: Ministry of Justice
Parliamentary excerpt

To ask the Secretary of State for Justice, whether she has considered establishing an independent national oversight mechanism for deaths involving (a) state and (b) law enforcement bodies.

Government answer

Answering body: Ministry of Justice

The Government is committed to improving transparency and accountability in the state’s response to learning from investigations involving state-related deaths and more widely. To this end, we are actively considering how we can most effectively address concerns about the lack of oversight and monitoring of recommendations and findings from public inquiries, inquests and other investigation processes.

For example, in the context of the recent response to the Grenfell Tower Inquiry Phase 2 report (Grenfell Tower Inquiry Phase 2 Report: Government response (HTML) - GOV.UK), we have undertaken to establish a publicly accessible record of all recommendations made by public inquiries since 2024; we will ensure that this becomes standard practice for all future public inquiry reports; and will consider putting the requirement to maintain such a record on a statutory footing.

In addition, the Ministry of Justice is undertaking a programme of work in light of the Justice Committee’s recent recommendations for the coroner service, including those aimed at better learning from death investigation and other fact-finding processes. This will include further work to improve accessibility to information from coroners’ Prevention of Future Death reports; and to ensure, particularly across government, that lessons from these reports are learned; that learning is disseminated as quickly and widely as possible; and that it is effectively monitored and evaluated. We are also working with the Chief Coroner to identify ways to further improve the transparency and availability of the published reports and accountability for responses to them.

Original parliamentary record

Public Bodies: Disclosure of Information

Written Question House of Commons
Margaret Mullane · Labour Answering body: Cabinet Office
Parliamentary excerpt

To ask the Minister for the Cabinet Office, if he will take steps to ensure that the new legal duty of candour established in response to Phase 2 of the Grenfell Tower Inquiry will be applicable to past incidents.

Government answer

Answering body: Cabinet Office

The Government has committed to implement a ‘Hillsborough Law’ which will place a legal duty of candour on public servants and authorities. The details of this Bill will be announced in due course.

Original parliamentary record

High Rise Flats: Personal Emergency Evacuation Plans

Written Question House of Commons
Marsha De Cordova · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

To ask the Secretary of State for Housing, Communities and Local Government, with reference to her Oral Statement of 26 February 2025 on Grenfell Tower Inquiry: Phase 2 Report, Official Report, whether she plans to take steps to enforce personal emergency evacuation plans for disabled residents living in high-rise (a) social housing and (b) privately rented accommodation.

Government answer

Answering body: Ministry of Housing, Communities and Local Government

Residential personal emergency evacuation plans (PEEPs) for which my Rt Hon Friend the Home Secretary currently retains responsibility until the Machinery of Government change comes into effect on 1 April will be introduced through legislation yet to be laid before Parliament. We expect that enforcing authorities under the Fire Safety Order, including Fire and Rescue Authorities, who have a duty to enforce Responsible Persons’ compliance with their duties will also enforce duties in relation to Residential PEEPs.

Under the Building Safety Act, Accountable Persons are required to assess and manage the building safety risks in their building. In doing this they are required to consider the impacts on residents, carry out engagement with residents, and set out in the Residents’ Engagement Strategy and Safety Case report the arrangements for how residents will respond to emergency situations, which can be expected to include the arrangements for putting in place and managing Residential PEEPs once required.