Grenfell Update

Written Ministerial Statement House of Commons
Robert Jenrick · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

The Grenfell Tower fire in 2017 was a national tragedy. 72 people died in the greatest loss of life in a residential fire since the Second World War; many more mourn the loss of their families, friends, community, and homes.Grenfell Tower Inquiry published its Phase 1 report on 30 October 2019. The Report’s findings addressed the events of that night - the fire, how it started and spread, and the emergency response to it. Today I am updating the House on the progress and choices that the Gove...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

The Grenfell Tower fire in 2017 was a national tragedy. 72 people died in the greatest loss of life in a residential fire since the Second World War; many more mourn the loss of their families, friends, community, and homes.

Grenfell Tower Inquiry published its Phase 1 report on 30 October 2019. The Report’s findings addressed the events of that night - the fire, how it started and spread, and the emergency response to it. Today I am updating the House on the progress and choices that the Government has made in implementing and acting on these recommendations. We owe it to the bereaved, the survivors, the community, and indeed all people living in blocks of flats around the country to demonstrate that we are making progress and their homes are being made safer.

The Government is delivering a comprehensive programme of reform on building and fire safety to ensure real and long-lasting, change. In the past year we have acted on the recommendations of Sir Martin and the Inquiry, in addition to our ongoing work in response to recommendations made by Dame Judith Hackitt in the Independent Review. We are addressing historic defects and delivering new legislation. This will bring about thorough regulatory reform; and ensure that people feel empowered and listened to and, more importantly, that they are safe and feel safe in their homes.

We recognised the importance of urgent action to remove unsafe Aluminium Composite Material (ACM) cladding from high-rise residential buildings, and to date 77 per cent of identified high-rise residential and publicly owned buildings have already been or are in the process of being fully remediated. We expect this figure to rise significantly by 31 December as the remaining residential buildings have a plan in place or have expressed their intention to remediate. As well as providing support, we will hold the owners of these buildings to account and keep residents safe in their homes.

We have worked with the Royal Borough of Kensington and Chelsea and local health and education partners to help the community in its recovery: rehousing residents of the Tower and of Grenfell Walk; providing funding to support refurbishment of the Lancaster West Estate; and addressing local concerns about the impact of the fire on health and the local environment.

We want the views of Grenfell communities to be heard across government, which is why the Prime Minister appointed Rt Hon Nick Hurd, former Minister for Grenfell Victims, as his Independent Adviser to represent the views of Grenfell communities at the heart of government. We know that the bereaved and the survivors of the Grenfell Tower fire await the forthcoming Social Housing White Paper, and we anticipate publishing this in the coming month.

My officials are working with the Grenfell community and the people affected by the fire, including on the delivery of a fitting and lasting memorial to the 72 people who very sadly lost their lives. As well as continuing to provide regular updates to the community about the site and regarding the legislative programme, we will also ensure we provide further regular updates on progress against the Inquiry’s recommendations.

Recommendations from the Grenfell Tower Inquiry Phase One Report

The report made 46 detailed recommendations to improve fire safety, directed at a range of organisations including: the London Fire Brigade (LFB) and Fire and Rescue Services more broadly, other emergency services, building owners, and Government. The Government is already taking forward a number of these recommendations, including: fundamental legislative change; working with Fire and Rescue Services to support them in making the necessary improvements; starting specific projects on evacuation; working with local leaders and national bodies to ensure that action is being taken across the country supported by new funding; and identifying and remediating buildings with historic risks from unsafe cladding.

Building a safer future

Since December 2019, the Home Office has led on developing and introducing the Fire Safety Bill. That Bill will clarify the scope of the Fire Safety Order (FSO) in multi-occupied residential buildings. In particular, it will place beyond doubt that in multi-occupied residential blocks the FSO applies to the structure, external wall systems and flat entrance doors, ensuring that Fire and Rescue Authorities can confidently take enforcement action where building owners or managers are not compliant.

The Fire Safety Bill paves the way for secondary legislation which we propose to make after the commencement of the Fire Safety Bill next year. The Fire Safety Consultation held this year set out Government proposals to strengthen fire safety in regulated buildings in England to ensure that people are safe from fire regardless of where they live, stay or work. These proposals are a practical and effective approach to address the risks the Inquiry identified in Phase 1. They will provide residents with greater assurance and deliver fire safety improvements in their buildings and hold Responsible Persons, including building owners and managers, to account. At the same time, the Government will be introducing the Building Safety Bill in 2021, paving the way for a strengthened building safety regime for buildings, with an even stronger regime for high rise buildings.

Looking to the future, at the heart of the new building safety regime are two new regulators. The first, the Building Safety Regulator, will implement the more stringent regulatory regime for high risk residential buildings. It will also oversee the safety and performance of other buildings and support work to improve the competence of professionals across the industry. The Regulator will be delivered by the Health and Safety Executive and began to operate in shadow form earlier this year.

We are also committed to further strengthening the regulation of construction products. Our draft Building Safety Bill includes provisions for a more robust regulatory framework that covers a wider range of products. It will strengthen the powers available to regulators, enforce the rules and lay the groundwork to establish of a national regulator which will spearhead the new approach.

The shadow Building Safety Regulator, within the HSE, is already advising the Government on the new regime. Over the coming months, it will develop guidance to ensure that all regulators involved understand how this will operate, and what they need to do to prepare for it.

Together, the measures in the draft Building Safety Bill, Fire Safety Bill, and Fire Safety Order consultation will improve safety standards for residents in all blocks of flats. Stricter regulations for high-rise buildings will make sure those living in them can feel safe and be safe in their homes – as is their right. Indeed, everything my officials do across the Building Safety Programme in the Ministry for Housing Communities and Local Government (MHCLG) and the Fire and Resilience Directorate in the Home Office is driven by a shared determination to prevent the recurrence of a tragedy like Grenfell.

Fire and Rescue Services

The Phase 1 report made it very clear that Fire and Rescue Services should make significant improvements to their training; policies and practices; and their equipment and technology. We are seeking real changes demonstrated through an investment in the right types of training, leadership and equipment.

That is why the Home Secretary wrote to LFB, requiring regular reporting on its progress on implementing the recommendations. Although there is still more to do, we are encouraged that LFB continues to focus on implementing all the recommendations directed to them as well as those targeting services more broadly. The LFB has revised its policies, and through a programme of training is embedding changes in the approach to high-rise firefighting. The integration of different and new technologies such as the trialling of drones to improve situational awareness and support incident commanders, is encouraging. The use of smoke hoods and smoke curtains to assist with evacuations, trialled in large scale operational exercises, appears to be a positive step. The Home Office continues to receive regular reports which have shown steady and concerted progress, even against a backdrop of the pandemic.

The Home Secretary has also commissioned Her Majesty’s Inspectorate of Constabulary and Fire and Rescue Services (HMICFRS) to review the governance and progress of LFB’s action plan to implement the recommendations from the Grenfell Tower Inquiry Phase 1 report. We anticipate the outcome of this initial review in January 2021.

The National Fire Chiefs Council (NFCC) is reflecting the Inquiry’s recommendations in its ongoing review of National Operational Guidance and the development of national standards through the Fire Standards Board, which this Government established. The Minister of State for Building Safety and Communities last month hosted a roundtable for all fire chiefs and chairs, to ensure that local services were equally committed to making rapid and meaningful progress in order to protect communities.

To ensure that the lessons from Grenfell are learned and change is implemented at pace we have made available £10 million in additional funding in 2020/21 to drive change nationally and in local services. A further £20 million has been provided to support fire protection activity across England.

As with London, HMICFRS will provide independent assurance on the effectiveness of services in responding to the recommendations as part of its second cycle of inspection, which the Home Secretary has agreed will commence in the new year.

Fire Protection

The Independent Review into Building Regulations and Fire Safety found the system ‘broken’. This broken system is being further revealed through the work of the Grenfell Tower Inquiry. The Phase 1 report found that a number of key fire protection measures failed to work as they should have at Grenfell. The Inquiry identified failings in the way in which LFB fulfilled its obligations under s.7(2)(d) of the Fire and Rescue Services Act 2004. This requirement is in place to ensure that it had the information needed for extinguishing fire and protecting life at the Tower.

Post Grenfell, we have seen other examples, which have further highlighted the importance of strengthening the overall protection capability and capacity of fire and rescue services. The work of HMICFRS, The Independent Review and the Grenfell Tower Inquiry evidence the need for more to be done to ensure that people are safe and secure in their homes and that FRSs need additional support to deliver an improved protection function to help achieve this goal. It is important that people can feel safe in their homes and that is why we have committed to ensuring that all high-rise residential buildings are inspected or reviewed by the end of 2021.

Our first priority for the £20 million protection funding has been to ensure that fire and rescue services are able to review or inspect every high-rise residential building in England by the end of 2021. This is a major programme of work, overseen by the Fire Protection Board, which will set the foundation for the building safety regulator. The funding has also created a new leadership function in NFCC; and provides funding for Fire and Rescue Services to have the capability and capacity to respond to risks in other potentially higher risk buildings, including residential buildings under 18 metres, care homes and hospitals.

Both MHCLG and the Home Office have worked with services and the NFCC, through the Fire Protection Board, to ensure appropriate interim measures remain in place to protect residents in buildings with dangerous cladding, such as ACM. The revised NFCC Simultaneous Evacuation Guidance, published on 1 October 2020, provides clearer advice which supports the Fire and Rescue Services and responsible persons to fully evacuate as soon as a fire is detected. The guidance advises responsible persons to explore cost benefit options with leaseholders and residents. It also encourages the installation of Common Fire alarms systems which means reducing the dependency on waking watch wherever possible. The guidance also reiterates that interim measures should only ever be short term and are not a substitute for remediation.

In addition, the research to support the development of national guidelines for carrying out partial or total evacuations of high-rise residential buildings and building design requirements is progressing. Independent experts will support the research that will underpin this work, and review the means of escape provisions in blocks of flats, including use of the “stay put” strategy and evacuation.

Emergency services

The Joint Emergency Services Interoperability Principles (JESIP) Joint Doctrine provides responders, at the scene and elsewhere, with a common way of working when responding to multi- agency incidents. Sir Martin recommended a number of amendments to the JESIP Joint Doctrine, including around communicating the declaration of a major incident.

The Emergency Services lead Chief Officers from JESIP have committed to addressing, in full, these recommendations in the review of the JESIP Joint Doctrine currently underway. This work is forecast to be completed in spring 2021.

Early actions and remediating historic risks:

Following the fire, the Government removed unsafe cladding products from the market and began dealing with historic defects. We banned combustible materials for use on new high-rise residential buildings and continue to work closely with local authorities, industry and regulators to identify existing buildings with dangerous cladding. Since then, we have continued to engage robustly with building owners, regulators and industry, to ensure the most dangerous forms of cladding are removed and replaced as soon as possible.

Building owners are responsible for building safety. But the Government recognises that funding is often a key barrier to remediation. That’s why we’re providing £1.6 billion to speed up the removal of unsafe cladding.

Despite COVID restrictions, we made it clear that these circumstances could not be allowed to impede progress on ACM remediation. Working closely with industry, we made good progress despite the many challenges we faced. We have set out a clear expectation that all building owners, across all sectors, must start ACM remediation works on site by the end of 2020.

There is still some way to go, but it is important to recognise that homes are being made safer. To date, 351 buildings (77 per cent of all identified high-rise residential and publicly owned buildings, including hotels and student accommodation), have already been or are in the process of being fully remediated. 148 social sector residential buildings – 95 per cent of that sector – have done the same. All remaining residential buildings now have a plan in place or have reported an intent to remediate.

Both myself and the Minister of State for Building Safety and Communities have personally met local leaders and the Fire Service to support them in taking action where progress is slow. Progress is reported through monthly data releases, and we have made clear that we will not rule out further measures in our mission to hold the owners of these buildings to account and keep residents safe in their homes.

Conclusion

In the year since the Phase 1 report was published, the Government has delivered demonstrable progress on all fronts and remained resolute in its commitment to deliver the recommendations. In relation to London we have used our powers to ensure that real change is happening. Through the funding we have provided the NFCC we have bolstered the national leadership that will help all services to make strategic and meaningful change – both in culture and leadership and in practical operational delivery. We have worked with industry, building owners, and regulators to ensure the most dangerous forms of cladding are removed and replaced as soon as possible. This work is not complete – we will continue to improve our services and the safety of buildings to ensure that the conditions that led to the tragedy at Grenfell Tower will no longer exist. The proposed legislative reforms will ensure there is absolute clarity on the regulatory framework, providing strong and comprehensive building safety so that residents can know their safety is assured.

Original parliamentary record

Building Safety update

Written Ministerial Statement House of Commons
Robert Jenrick · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

I would like to update Parliament on the Government’s progress in overhauling the building and fire safety system, as part of our unwavering commitment to ensuring that people, and the buildings they live in, are safe.Building safetyWe must never forget the seventy two people who lost their lives as a result of the Grenfell Tower tragedy. Countless lives were torn apart by that tragedy and we owe it to the deceased, the bereaved, the survivors, and the residents of all high-rise buildings to ...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

I would like to update Parliament on the Government’s progress in overhauling the building and fire safety system, as part of our unwavering commitment to ensuring that people, and the buildings they live in, are safe.

Building safety

We must never forget the seventy two people who lost their lives as a result of the Grenfell Tower tragedy. Countless lives were torn apart by that tragedy and we owe it to the deceased, the bereaved, the survivors, and the residents of all high-rise buildings to ensure that we do all we can to prevent a repeat of events like that fateful night occurring again.

We promised to overhaul the system and to establish a national building safety regulator at its heart. Today I am pleased to be making a significant step towards that fundamental reform by publishing the draft Building Safety Bill for pre-legislative scrutiny, before the final Bill is brought forward to Parliament.

The Bill will establish the regulator in the Health and Safety Executive (HSE) and give it significant powers to improve safety and performance across the built environment, especially in higher-risk buildings.

These reforms will improve safety and performance standards across all buildings. However, certain buildings warrant even closer oversight because the potential for significant consequences should a fire spread or the structure fail. It is right that we have a more stringent regime where the risk is deemed greatest, to protect the greatest number of people. Initially the scope of the more stringent regime will apply to multi-occupied residential buildings of 18 metres or more in height or more than six storeys, whichever is reached first. We have designed the new regime so its scope can be changed if the evidence base or operational experience suggest it should.

The Bill will provide a stronger framework to make sure those responsible for managing building safety risks in higher-risk buildings are held to account, with stronger enforcement powers and sanctions where those rules are not followed. It will also ensure that the residents of high-rise buildings have a stronger voice, alongside giving them better access to safety information about their building, clarifying their rights and providing recourse to raise safety concerns directly to the regulator.

The draft Bill applies to England only with the exception of the policies to require developers to belong to a New Homes Ombudsman scheme, strengthen the oversight of the construction products regulatory regime, and allow the Architects Registration Board (ARB) to monitor the competence of architects. Further detailed analysis of the territorial extent is provided in the Explanatory Notes.

Building safety financing

The Government is clear that it is unacceptable for leaseholders to have to worry about the cost of fixing historic safety defects in their buildings that they didn’t cause.

The draft Bill proposes a new ‘building safety charge’, which will give leaseholders greater transparency around costs incurred in maintaining a safe building. We want these to be fair and proportionate, which is why I have deliberately included numerous powers in the Bill that will enable us to limit the building safety costs that can be re-charged to leaseholders.

This is a topic that we are particularly committed to developing further throughout the process of scrutiny and as the Bill is finalised for introduction. I have asked Michael Wade, senior adviser to the Cabinet Office, to accelerate this work with leaseholders and the financial sector. We must remove barriers to fixing historic defects and identify financing solutions that protect leaseholders from unaffordable costs; but we must also ensure that the bill does not fall on tax payers. We will update on any further measures required before the final Bill is introduced to Parliament.

Establishing the Building Safety Regulator

As I announced in January, the HSE is establishing the regulator in shadow form, and I am today announcing that I have set aside £16.4 million in this financial year for HSE to recruit the people and develop the capabilities that will enable the regulator to hit the ground running once its powers come into effect.

HSE has a strong track record of improving safety and fostering a safety-first culture within the construction and major hazards industries, and will draw on years of experience to deliver results quickly and effectively. As shadow regulator, HSE is playing an increasingly important role in the Government’s Building Safety Programme: it is supporting work on how to identify higher-risk buildings; supporting work by the National Fire Chiefs Council to assess the fire risk in every high-rise residential building by end 2021; and supporting work with early adopters in the construction industry, social landlords and local government to trial the new regime, and to promote culture change across the industry. I am today announcing that HSE will also take over as chair of the Joint Regulators’ Group, which advises the Government on ways to strengthen the regulatory regime; and will take over the Independent Expert Advisory Panel, which advises the Government on fire safety in high-rise residential buildings.

Over coming months, the shadow regulator will engage with and advise residents, building owners, the construction industry and other regulators on how the new system will operate, what it will mean for them, and what they should do now to make their buildings safe and prepare for the new regime. In the Autumn, we will kick off work to appoint the first national Chief Inspector of Buildings, who will lead the new regulator.

We, and the public, expect industry to manage building safety risks now and prepare to fulfil their duties when this new regime comes into effect. The public expects and demands industry to implement these reforms with conviction and speed. The new Building Safety Regulator stands ready to work hand in hand with industry to bring about a culture change that prioritises residents and their safety.

Fire safety reforms

The Home Office is also today publishing a Fire Safety Consultation, which sets out proposals to: strengthen the Regulatory Reform (Fire Safety) Order 2005 – the Fire Safety Order – and improve compliance for all regulated buildings; implement the Grenfell Tower Inquiry Phase 1 report recommendations for multi-occupied residential buildings which require a change in law; and, seeks views on the effectiveness of the arrangements for consultation and information sharing between building control bodies and fire and rescue authorities in relation to building work. This is alongside a commitment to overhaul the Fire Safety Order’s supporting guidance.

Proposals for multi-occupied residential buildings, mostly high-rise buildings, include prescribing in law the frequency of checks of fire doors; that Responsible Persons (RPs) carry out inspections of other key fire-fighting equipment, not just lifts designed to be used by firefighters; and that RPs provide information to residents including in relation to fire safety (including evacuation and other specific information) in an accessible format.

Our proposals go beyond the Grenfell Tower Inquiry’s recommendations in several areas. In others, our proposals prioritise residents’ safety in a way that is practical, proportionate and effective to the risks the Inquiry has identified. The Government wants to listen to the views of those who have experience of these matters, including those who have been personally affected by the Grenfell Tower tragedy. The proposals set out in the Home Office consultation will further deliver the Government’s objective to improve building and fire safety in all regulated premises where people live, stay or work.

Construction products

The Bill also enables us to progress our commitment to radically strengthen oversight of the regulatory regime for construction products. The bill will make sure a wider range of construction products are subject to strengthened safety regulations. It will also strengthen the powers available to the Government, paving the way to create a new national regulatory function that will have oversight of the construction products regulation. The Government is developing options for how this new national regulatory function could be implemented.

Other housing measures

The draft Bill also contains measures to protect the rights of all new build homebuyers by requiring developers to belong to the New Homes Ombudsman. It also includes new measures that will make access to redress swifter and more effective for all social housing residents.

Pre-legislative scrutiny

These are extensive reforms that it is incumbent on us all to get right. The Building Safety Bill is a large and complex piece of legislation, reflecting the scale of the reforms needed. In this spirit, I am publishing the Bill in draft form to ensure it receives the due and proper consideration it deserves through pre-legislative scrutiny from Parliament, from industry, from regulatory bodies, and from residents. I want to thank those that have helped shape the legislation so far, including those who contributed to the ‘Building a Safer Future’ consultation and who have engaged in various forums with my department. I now encourage colleagues from across both Houses to engage wholeheartedly in strengthening these proposals so that together we can further improve the legislation and deliver greater safety for residents.

I will deposit copies of the draft Building Safety Bill, Delegated Powers Memorandum and Impact Assessment in the libraries of both Houses. A copy of the full Fire Safety Consultation and its Impact Assessment will also be deposited in the libraries of both Houses.

Original parliamentary record

Grenfell Update

Written Ministerial Statement House of Commons
Robert Jenrick · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

On 30 October 2019 Phase 1 of the Grenfell Tower Inquiry, which focused on how the fire started and spread and the emergency response, concluded with the publication of the Phase 1 report. In January 2020 the Government reaffirmed the acceptance, first given on the day of publication, to accept in principle, all the recommendations that Sir Martin Moore-Bick made for central government in that report.Six months on from the publication of the Government’s response to the Phase 1 report, I woul...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

On 30 October 2019 Phase 1 of the Grenfell Tower Inquiry, which focused on how the fire started and spread and the emergency response, concluded with the publication of the Phase 1 report. In January 2020 the Government reaffirmed the acceptance, first given on the day of publication, to accept in principle, all the recommendations that Sir Martin Moore-Bick made for central government in that report.

Six months on from the publication of the Government’s response to the Phase 1 report, I would like to update Parliament on the Government’s progress at turning our commitments into real and lasting change to building and fire safety.

The Grenfell fire was an unimaginable tragedy that must never be allowed to happen again. Even in these unprecedented times, the Government’s commitment to implementing the Inquiry’s recommendations, as a priority, remains unchanged. As does the Government’s commitment to ensuring those most affected, the bereaved and survivors – who have displayed such remarkable courage, resilience and dignity – continue to be engaged in discussions about policy development.

Ban on the use of combustible materials

The Inquiry’s report was clear that the use of Aluminium Composite Material (ACM) rainscreen cladding and combustible insulation on the exterior of the Tower was the defining factor in the rapid spread of the fire. The Government introduced regulations in December 2018 that banned the use of combustible materials in and on the external walls of specific types of new high-rise buildings. A public consultation was held between January and May 2020, to further explore and refine the scope of that ban – including a proposal to ban the use of ACM with unmodified polyethylene core and similar materials on all buildings in England. We are analysing feedback and will be publishing a response in due course.

Remediation

Since the Grenfell Tower fire, the Ministry of Housing, Communities and Local Government (MHCLG) and the Home Office (HO) have identified over 450 buildings with unsafe ACM cladding, and we have worked with local authorities and fire and rescue authorities to ensure that appropriate interim safety measures are in place, while these buildings undergo remediation.

In March this year the Government announced that it will provide £1 billion to fund the removal and replacement of unsafe non-ACM cladding systems. This is in addition to the £600 million which Government has made available for remediation of the highest risk ACM cladding. The prospectus for this fund was launched last month and sets out the buildings and non-ACM cladding systems that are eligible for funding and registration is now open for potential applicants, in advance of the full application process opening by the end of July 2020. More information on the Fund Prospectus can be found here: https://www.gov.uk/guidance/remediation-of-non-acm-buildings#prospectus---outlining-eligibility-for-the-fund.

This fund will meet the cost of remediating unsafe non-ACM cladding systems where building owners (or other entities legally responsible for making buildings safe) are unable to do so. Government are also providing additional, specialist project management capability to building owners or managing agents to speed up the development and implementation of building plans.

The Fire Protection Board

The Government has also established a Fire Protection Board, chaired by the National Fire Chiefs Council (NFCC), to provide greater assurance to central government of Fire and Rescue Service protection activity. The Board is leading a Building Risk Review Programme, supported by government funding to ensure that all high-rise residential buildings of 18m or above are inspected or reviewed by the end of 2021. We are also using a proportion of the additional £20m secured for fire and rescue services in the recent Budget to further support an uplift in protection capability.

Stay Put

At the end of last year, a joint HO and MHCLG steering group was set up to support a technical review of stay put. There are three strands to this work: an evidence review, assessing academic evidence on methods of evacuation; operational research to test evacuation strategies; and building design research. The first stage of this work has been commissioned and is underway whilst preliminary work is being carried out on the other strands.

Building safety

At the heart of the Government’s radical reforms to building safety is the new Building Safety Regulator, which we are establishing within the Health and Safety Executive. The Government set out plans in our response to the ‘Building a Safer Future’ consultation for the biggest change in building safety for a generation.

The new regulator will be responsible for implementing and enforcing a more stringent regulatory regime for higher risk buildings, as well as providing wider and stronger oversight of safety and performance across all buildings and increasing the competence of those working on building safety. This work complements the establishment of a new construction products regulatory role to strengthen national oversight and effectively enforce the new regulatory regime.

The Government will soon be publishing the draft Building Safety Bill for scrutiny before it is introduced in Parliament. This Bill will put in place this new and enhanced regulatory regimes for building safety and construction products, and ensure residents have a stronger voice.

In April, the Government published a workplan detailing the next steps for the wider review of Approved Document B, following the technical review that was started in December 2018. Research will be carried out in areas such as means of escape, compartmentation and toxicity. This work will build on the changes we have published in an update to Approved Document B last month, so that sprinklers and wayfinding signage will be provided in all new blocks of flats above 11 metres. The Government is also working with the NFCC on further tests of evacuation with a view to including guidance on provision of these systems in a later update to Approved Document B.

Fire Safety Bill

The Inquiry’s Phase 1 report also called for new duties on building owners and managers to share technical information with fire and rescue services and undertake regular inspections of flat entrance doors. It is our intention to take forward these recommendations for existing buildings under the Regulatory Reform (Fire Safety) Order 2005 underpinned by the changes being introduced through the Fire Safety Bill.

The Fire Safety Bill, which was introduced in March and received cross-party support, clarifies that the scope of the Fire Safety Order covers external walls (including cladding and balconies) and flat entrance doors in multi-occupied residential buildings. It provides a firm foundation upon which to bring forward secondary legislation to implement the recommendations that require further changes to the law. The Bill is a significant further step to ensure better identification and management of fire safety risks in such buildings.

It is important that the Government’s response to the Inquiry’s recommendations has the support of those with experience in these matters, and those most affected by them. To ensure their views inform our response, a public consultation will be issued soon setting out the Government’s proposed approach to the remaining recommendations that call for legislative change.

Fire and Rescue Services

Many of the recommendations within the Inquiry’s Phase 1 report were directed at non-Government organisations that are equally committed to the reforms. The report was clear that the London Fire Brigade (LFB) must learn and change to restore public confidence. Our request for regular progress reports from the LFB setting out how they are translating the recommendations into action are a key part of retaining focus and momentum on the need for change.

There remains much to do, but the HO is already seeing a commitment to revised policy and procedures backed up by the use of better equipment and technology to support high-rise fire fighting and fire fighting in London more broadly. The pandemic has created many challenges, but it has not affected the LFB’s commitment to implementing the Inquiry’s Phase 1 recommendations.

It is important that the lessons from Grenfell are learned beyond London. This is why the NFCC is working to ensure that the Phase 1 recommendations are implemented across all fire and rescue services. The HO is working closely with the NFCC on an improvement plan to help it drive real change across the sector.

In the three years since the Grenfell Tower fire, the Government has remained steadfast in its commitment to driving forward both cultural and legislative change so that no such tragedy can ever be allowed to happen again. Through implementation of the reforms highlighted in this statement, and wider work of Government and our stakeholders, we will move from the conditions that allowed a tragedy like the fire at Grenfell Tower to occur almost three years ago, to a system which ensures developers and building owners demonstrate greater responsibility for the safety of residents and which allows local authorities and fire and rescue authorities to enforce this. The Government is firmly committed to ensuring all residents are safe in their homes, now and in the future.