Grenfell Tower inquiry Phase 2 Government Progress Report

Written Ministerial Statement House of Lords
Baroness Blake of Leeds · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

The Grenfell Tower fire was a preventable tragedy that claimed 72 lives and exposed deep-rooted weaknesses in the systems designed to keep people safe. It remains a profound failure of oversight and accountability which should never have happened and the bereaved, survivors and local community remain at the heart of our response.This government accepted the Inquiry’s findings and is today publishing the September 2026 Grenfell Tower Inquiry Government Progress Report to update on work underwa...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

The Grenfell Tower fire was a preventable tragedy that claimed 72 lives and exposed deep-rooted weaknesses in the systems designed to keep people safe. It remains a profound failure of oversight and accountability which should never have happened and the bereaved, survivors and local community remain at the heart of our response.

This government accepted the Inquiry’s findings and is today publishing the September 2026 Grenfell Tower Inquiry Government Progress Report to update on work underway to implement the recommendations. Since May 2026, we have completed a further 9 recommendations, bringing the total of closed recommendations to 30 since February 2025. We remain on track to deliver all recommendations by the end of 2029.

Alongside the September progress report, we are publishing the Interim Chief Construction Adviser’s final report.

Together, the progress report and the Interim Chief Construction Adviser’s final report demonstrate continued progress in implementing the Grenfell Tower Inquiry’s recommendations and reforming the wider building safety system. They represent important steps towards sustained system-wide change by reducing fragmentation, strengthening accountability and ensuring that those responsible for building and fire safety have the support and oversight needed to keep people safe in their homes.

The government recognises that lasting change requires sustained transparency and oversight. We have delivered the Inquiry’s recommendation on transparency through our new dashboards which publicly track progress to deliver accepted recommendations across inquiries, alongside our regular progress reports on Grenfell implementation. Parliament also has an important role to play in overseeing how government implements recommendations and I await the outcome of PACAC's work in early 2027.

Original parliamentary record

Grenfell Tower Inquiry Phase 2 Report Update

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:The Grenfell Tower tragedy exposed deep-rooted weaknesses in the systems designed to keep people safe. The preventable loss of 72 lives remains a profound failure of oversight and accountability which should never have occurred. The bereaved, survivors and local community continue to remind us of the human cost of those failures and of the importance of last...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:

The Grenfell Tower tragedy exposed deep-rooted weaknesses in the systems designed to keep people safe. The preventable loss of 72 lives remains a profound failure of oversight and accountability which should never have occurred. The bereaved, survivors and local community continue to remind us of the human cost of those failures and of the importance of lasting reform.

This government accepted the Inquiry’s findings and is today publishing the May 2026 Grenfell Tower Inquiry Progress Report, setting out the action taken and the further work underway to deliver a more robust, coherent and accountable building safety system. Since February 2026, we have completed a further nine recommendations, bringing the total of closed recommendations to 21 since February 2025. We remain on track to deliver all recommendations by the end of 2029.

Alongside the May progress update, we are publishing;

A call for evidence on the building professions, trades and occupations

The College of Fire and Rescue Consultation

The Building Control Independent Panel report and government response

The Public Engagement Policy

An Office for Product Safety and Standards (OPSS) research paper

The publications alongside this progress report illustrate the continued progress being made towards implementation of the Inquiry’s recommendations and wider reforms of social housing and the construction sector. While not all these documents in themselves close a recommendation, they represent important steps in the work needed to do so, and form the foundations to support sustained, system-wide change. They seek to address fragmentation and ensure that those responsible for building and fire safety have the support they need to keep the public safe in their homes.

The government will also bring forward a Remediation Bill, which will drive forward the remediation of unsafe cladding by giving regulators the powers they need to compel the worst blockers to take action, and make those responsible pay towards the cost of fixing the problem they caused.

Call for Evidence on the Building Professions, Trades and Occupations

Following on from publication of the Single Construction Regulator prospectus in December 2025, we have today launched a call for evidence on the built environment professions, trades and occupations. This goes beyond the specific recommendations in the Grenfell Tower Inquiry for fire engineers, fire risk assessors, principal contractors and architects to tackle the underlying findings of the Inquiry. This concluded that the skills, knowledge and experience of all those engaged in the construction industry are critical to making sure our buildings and environments are safe, high quality and high performing.

This call for evidence seeks information about current barriers, opportunities and interdependencies shaping how people work and behave during all stages of the building process. The outcomes of this exercise will help to set the shape and scope of the new overarching strategy for the professions, trades and occupations which will be published in 2027. This will set out a long-term plan for regulatory and non-regulatory reform across government and the sector, in addition to the delivery of the specific recommendations around professions.

The call for evidence will run for 12 weeks until 12 August 2026.

Building Control Independent Panel Report and Government Response

The government has today published the final report of the Building Control Independent Panel, alongside our response. The Panel was established, under the chairship of Dame Judith Hackitt, following a recommendation of the Grenfell Tower Inquiry Phase 2 to consider whether building control functions should be performed by those who have a commercial interest in the process; and whether all building control functions should be performed by a national authority.

We welcome the Panel’s clear assessment of longstanding challenges in the system, despite the professionalism and commitment of many of those working within it. The report sets out principles for reform, alongside recommendations for action in the near term and options for longer-term reform.

The government agrees with the Panel’s assessment and accepts the direction of travel it has set out. Our response makes clear that building control must be properly supported as part of a well-functioning wider building safety system, building on reforms already delivered since the Grenfell Tower tragedy.

We will now take forward detailed work on the Panel’s recommendations at pace, including how reform can be taken forward in a way that strengthens public safety, supports the profession and maintains confidence across the sector. We will set out further detail as this work develops.

College of Fire and Rescue Consultation

We are today publishing a public consultation on the establishment of a new College of Fire and Rescue. This consultation seeks views on the role, design and delivery of a new centre of excellence to support the capability, professionalism and resilience of the fire and rescue sector.

The consultation marks an important step in delivering the recommendations of the Grenfell Tower Inquiry. The Inquiry identified serious and systemic weaknesses across the fire and rescue sector, including inconsistent professional standards, variation in training and leadership, and fragmented responsibilities. As the cornerstone of our reform programme, the college will address these challenges and build on the recommendations from the phase 1 report by collecting and curating operational learning and providing a trusted national voice on risk and fire behaviour. The college will therefore play a critical role in raising professional standards and improving outcomes for the fire and rescue workforce.

The consultation sets out proposals for the college’s strategic purpose and the functions it could fulfil, including, but not limited to, leadership and command, recruitment and training, and culture and integrity. It also seeks views on how the college could operate in practice.

This consultation will run for eight weeks, closing on the 15th July, and we strongly encourage responses from the public, the fire and rescue sector, other blue light services and any other respondents with an interest in this work. The consultation will be available on gov.uk and will be laid in both Houses.

Public Engagement Policy

The Grenfell Tower Inquiry details significant widespread failings that led to the Grenfell Tower Tragedy. Of these failings, and the many individuals and organisations named, seven firms were most significantly criticised for their actions. Sir Michael Moore-Bick found that some of these organisations acted with “systematic dishonesty” and “engaged in deliberate, sustained strategies to mislead the market.” The Inquiry found that materials were used on Grenfell Tower that firms knew were not fit for purpose, and that safety was deprioritised behind ease and economic gain.

In response to these findings, the Ministry of Housing, Communities and Local Government has implemented a policy to advise ministers and senior officials not to share a public platform with any of these firms. The principles of this approach have since been shared across government.

Original parliamentary record

Improving Building Safety Systems in Higher-Risk Buildings and Beyond

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:An effective and efficient building control system underpins the fundamental safety of homes and communities across the country, built on the expertise of skilled professionals. Today I announce further steps the Department is taking to make sure this system is working effectively and supporting our ambitious remediation and housebuilding targets.This will r...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:

An effective and efficient building control system underpins the fundamental safety of homes and communities across the country, built on the expertise of skilled professionals. Today I announce further steps the Department is taking to make sure this system is working effectively and supporting our ambitious remediation and housebuilding targets.

This will restore confidence in the work done to ensure safety in the building sector and boost the housing supply and the improved operation of the Building Safety Regulator’s Gateway regime.

Today, the Ministry for Housing, Communities and Local Government (MHCLG) is launching a consultation on improving proportionality and safety outcomes in the higher-risk building (HRB) control regime. This consultation is seeking views on how building work in existing higher-risk buildings is categorised, to make sure the application requirements reflect the scale and complexity of the work. We are committed to making sure the higher-risk regime is applied in a proportionate way without compromising on safety. It must strike the right balance between robust oversight of safety critical works and enabling safer building works to proceed efficiently and without undue delays.

Alongside this, MHCLG is announcing a £70m Building Professional Workforce Programme to address shortages of capacity and capability in two safety-critical areas of the built environment: £55m for building control and £15m for the fire engineering profession. These professions play a key role in making sure building work is delivered in accordance with the Building Regulations and that engineering solutions protect people and mitigate harm to the built environment in the event of fire.

Our funding will enable the recruitment and training of up to 700 new building inspectors to increase overall capacity, the training of more building inspectors to Class 3 to enable them to work on HRBs, and the expansion of masters level education for fire engineers. This takes forward the recommendations of the Grenfell Tower Inquiry, in line with our recently published next steps on fire engineering profession reform.

These announcements form part of a wider programme to keep people safe in the buildings where they live, work, and visit. As part of this, a consultation was launched today for fire risk assessors. A separate statement has been laid providing further detail on these proposals.

Our priority remains, as it must, in ensuring the collective safety of residents in buildings across the country, while speeding up progress on crucial building work, such as cladding remediation and delivering the new homes this country urgently needs.

The consultation on proposed changes to HRB categorisation can be found here: https://www.gov.uk/government/consultations/proportionality-in-building-control-categorisation-of-higher-risk-building-work

We will announce further details on availability of the Building Profession Workforce Programme funding in due course.

Original parliamentary record

Fire Safety

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:Today, the Ministry for Housing, Communities and Local Government launched a public consultation on proposals to establish a fire risk assessor (FRA) profession with consistently high levels of competency, where trust is rebuilt, and where a strong, diverse pipeline of talent ensures improved standards of fire safety.ContextFire risk assessments are a fundam...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:

Today, the Ministry for Housing, Communities and Local Government launched a public consultation on proposals to establish a fire risk assessor (FRA) profession with consistently high levels of competency, where trust is rebuilt, and where a strong, diverse pipeline of talent ensures improved standards of fire safety.

Context

Fire risk assessments are a fundamental part of the fire safety regime established under the Regulatory Reform (Fire Safety) Order 2005. This legislation requires Responsible Persons (RPs) to make a suitable and sufficient assessment to help make sure hazards are identified and the right fire precautions are delivered to keep people safe in the buildings where they live, work, and visit.

RPs can currently undertake this assessment themselves, or appoint someone, commonly known as an FRA, to assist them. Competent and professional FRAs therefore play a critical role in keeping people safe.

Despite this vital life-safety role, FRAs are not currently recognised as a regulated profession. There is no single professional body, no agreed definition of the role, no defined career pathway, and no specified training or qualifications.

While many FRAs are highly competent, we want to see an FRA profession with consistently high and demonstrable standards of competency across the board. Further, we want these proposals to rebuild trust in the FRA profession so that those who rely on their expertise, whether occupying, buying or selling, can feel confident in the fire safety of their homes or other premises.

The Grenfell Tower Inquiry (‘the Inquiry’) Phase 2 report identified serious shortcomings in the fire risk assessments produced by the FRA for Grenfell Tower, including failures to identify critical fire safety hazards and to verify that previously identified risks had been addressed. In response to Recommendation 26 in the Inquiry’s Phase 2 report, government committed to introduce mandatory certification for FRAs.

Consultation

The consultation we have launched today is an important step in delivering Recommendation 26 of the Inquiry’s Phase 2 report and fulfilling our commitment to introduce mandatory certification for FRAs.

We have engaged stakeholders across government, the devolved governments, and industry to secure their initial contributions to our plans and help shape the future of a profession that can consistently deliver its vital fire safety role.

The consultation can be found here: https://www.gov.uk/government/consultations/fire-risk-assessors-profession and will remain open for 12 weeks until 18 June 2026. We encourage as many responses as possible, to make sure future measures strengthen confidence in the FRA regime and so that those undertaking this critical work are appropriately competent, supported, and accountable. Following the consultation, government will carefully consider the responses received and set out next steps in due course.

This work forms part of a wider programme to implement Inquiry recommendations and improve fire and building safety, including proposals for the establishment of the Single Construction Regulator, recent publications on the fire engineering profession and ongoing work to develop a new strategy for the built environment professions.

Further, a consultation was launched today on improving proportionality and safety outcomes in the higher-risk building (HRB) control regime which can be found here: https://consult.communities.gov.uk/higher-risk-buildings/redefining-category-a-building-work-consultation

This is launched alongside the announcement of a £70m Building Professional Workforce Programme to address shortages of capacity and capability in two safety-critical professions: building control and fire engineering. The funding for fire engineering will contribute to our response to the Inquiry recommendations on increasing education for fire engineers.

A separate statement has been laid providing further detail on these announcements.

Original parliamentary record

Grenfell Tower Inquiry Recommendations – Progress

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:The Grenfell Tower fire in 2017 was a national tragedy that highlighted profound failures across systems, safeguards and oversight and led to the avoidable deaths of 72 innocent people.Eight years on, the bereaved, survivors, and immediate community continue to campaign for justice, truth and accountability. We are committed to delivering the substantial ref...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:

The Grenfell Tower fire in 2017 was a national tragedy that highlighted profound failures across systems, safeguards and oversight and led to the avoidable deaths of 72 innocent people.

Eight years on, the bereaved, survivors, and immediate community continue to campaign for justice, truth and accountability. We are committed to delivering the substantial reforms needed to make sure that such a tragedy never happens again.

In February, the Government accepted all the Inquiry’s findings and is taking action on all 58 Phase 2 recommendations to build a more robust and trusted regulatory system and deliver safe, quality homes for everyone.

Today, my department has published our third Progress Report. Alongside this update, we have published a prospectus and consultation on creating a Single Construction Regulator; the Fire Engineers Authoritative Statement and Next Steps Document; and results of the Building Safety Regulator’s initial review of the definition of higher-risk buildings and plans for an ongoing review.

These are significant steps to deliver the reforms we committed to in the Government’s response to the Grenfell Inquiry to tackle fragmentation and complexity in the regulatory system and to ensure those responsible for building and fire safety are competent.

Grenfell Tower Inquiry Government Progress Report

This progress clearly demonstrates the Government’s determination to act decisively to deliver meaningful reform of the built environment. Since the progress report in September, we have completed a further five recommendations related to the construction industry, fire and rescue services and protecting vulnerable people.

Single Construction Regulator Prospectus: Consultation Document

The first recommendation from the Inquiry’s Phase 2 report was for Government to introduce a single construction regulator to tackle complexity and fragmentation in how the industry is regulated. In our response to the Inquiry, we committed to consulting on our next steps this year. Today we have published the Single Construction Regulator Prospectus: Consultation Document. This is a significant milestone in delivering this recommendation.

The prospectus lays out Government’s vision for a better regulatory system. We will tackle fragmentation by integrating the regulation of buildings, construction products, and professionals so they work as an effective system. At the heart of the system will be a single construction regulator who will consolidate the delivery of regulatory functions. The prospectus also sets out next steps for this Government’s wider programme of regulatory reform, including reforms to the Construction Products regime, to be set out in a White Paper by spring 2026, and a new overarching strategy for the built environment professions that goes beyond the areas highlighted by the Inquiry, to be published in spring 2027. The purpose of this reform is a more effective regulatory system, which means better outcomes for residents and building users; clarity and certainty for industry and investors; and a fairer system, that benefits those who prioritise safety and quality and sets clear accountabilities for all actors with a stake in the built environment.

Progress towards the Single Construction Regulator has begun through significant reforms to the Building Safety Regulator (BSR). In June, MHCLG announced a new phase for the BSR, including strengthened leadership and steps to address operational challenges. Work is now underway to establish the BSR as a new arm’s length body sponsored by MHCLG. The new body and dedicated leadership will provide a singular focus for this complex area of regulation, clearer lines of accountability to Ministers and Parliament, and greater operational flexibility while retaining its regulatory independence. Further reform, including integrating additional responsibilities, will be managed through a carefully phased approach, to ensure the current regulatory regime is not destabilised and to set the future regulator up for success.

The prospectus and consultation can be found on gov.uk at https://www.gov.uk/government/consultations/single-construction-regulator-prospectus. The consultation will run until 20 March 2026, inviting views on the proposals. We encourage as many responses as possible, to shape the future direction of the regulator and wider building system and make sure these reforms lead to real change for residents and building users.

Fire Engineers Authoritative Statement and Next Steps Document

The Fire Engineers Advisory Panel, established in April, brings together leading experts to strengthen the Government’s response to the Inquiry’s recommendations concerning fire engineers. In September, we committed to publishing an authoritative statement (recommendation 17) on the knowledge and skills to be expected of a competent fire engineer.

Today we have published the Fire Engineers Authoritative Statement, alongside a Next Steps document. This paper will set out MHCLG’s approach to recommendations 15, 16 and 18. Together, these publications provide clarity for the sector and signal the start of wider reforms to make sure the fire engineering profession is fit for the future.

Higher-Risk Buildings review publication

Today we have published the results of the Buildings Safety Regulator’s initial review of the definition of higher-risk buildings as well as the Regulator’s plans for an ongoing review.

The initial review found that the current definition appropriately reflects the available evidence on risks to individuals from the spread of fire and structural failure. Although no changes are to be made to regime scope at the present time, the ongoing review will ensure the data and evidence is regularly assessed to determine whether the categories of building subject to the higher-risk regime should be amended in any way. The presence of vulnerable individuals within designated building types will remain central to any assessment of risk.

Approved Document B Consultation

We will shortly launch a public consultation on proposed updates to Approved Document B, the statutory fire safety guidance within the Building Regulations. The consultation will seek views on targeted clarifications and technical changes, including new provisions for evacuation lifts in residential buildings above 18 metres, alongside measures to improve clarity and strengthen confidence in the guidance. These updates will be an important step in supporting inclusive design, safe evacuation strategies, and maintaining robust fire safety standards across the built environment.

Original parliamentary record

Update on the Building Safety Regulator

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:In June 2025, my department announced changes to the Building Safety Regulator (BSR). Today I am laying before the House draft regulations which will move the functions of the Building Safety Regulator out of the Health and Safety Executive (HSE), and to an Executive Non-Departmental Public Body sponsored by the Ministry of Housing, Communities and Local Gov...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Minister for Building Safety, Fire and Democracy (Samantha Dixon MBE MP) has today made the following statement:

In June 2025, my department announced changes to the Building Safety Regulator (BSR). Today I am laying before the House draft regulations which will move the functions of the Building Safety Regulator out of the Health and Safety Executive (HSE), and to an Executive Non-Departmental Public Body sponsored by the Ministry of Housing, Communities and Local Government.

This change will position the BSR for the coming years. It will strengthen lines of accountability and give a dedicated focus to BSR operations, and is an important first step towards establishing a single construction regulator, the lead recommendation of the Grenfell Tower Inquiry Phase 2 report.

I am grateful to HSE for the leadership and experience it has brought to the establishment and early operations of the BSR, and for its ongoing support as this change is made.

Original parliamentary record

Procurement Act 2023 investigations

Written Ministerial Statement House of Lords
Baroness Anderson of Stoke-on-Trent · Labour Answering body: Cabinet Office
Parliamentary excerpt

My Right Honourable friend, the Chancellor of the Duchy of Lancaster, the Rt Hon. Pat McFadden MP, has today made the following statement:We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuin...

Recorded statement

Answering body: Cabinet Office

My Right Honourable friend, the Chancellor of the Duchy of Lancaster, the Rt Hon. Pat McFadden MP, has today made the following statement:

We will never forget the 72 lives lost following the Grenfell Tower tragedy eight years ago. The government is grateful to Sir Martin Moore-Bick and the Grenfell Tower Inquiry team for laying bare the truths in their reports.

When the Grenfell Tower Inquiry published its final report, the Prime Minister made clear the whole government’s commitment to pursuing full accountability, including through the criminal justice process. Further to the statement made by the Parliamentary Secretary, Minister Gould on 26 February 2025, formal notices were issued to the seven suppliers named in that statement commencing debarment investigations under new powers in section 60 of the Procurement Act 2023.

Since that notification, my officials have been working to progress these investigations which has included seeking views from relevant stakeholders. The Crown Prosecution Service and the Metropolitan Police Service have made me aware that they have significant concerns that the debarment investigations could lead to unintentional prejudice to both the criminal investigation and to any future criminal proceedings and the Government has accepted their representations that the criminal investigation must take priority.

At the request of the CPS and MPS, I have therefore decided to pause these 7 debarment investigations until criminal investigations and any prosecutions are concluded. I recognise that this decision will feel like yet another delay in the community’s long wait for justice and I have not taken this decision lightly. I understand how important the criminal investigation is to the bereaved families, survivors and the wider community, which is why I am taking this action to protect the integrity of any subsequent criminal proceedings in pursuit of delivering justice. The government fully supports the MPS in its investigation.

The debarment investigations are being paused without any conclusion having been reached. The pause does not in any way prevent contracting authorities from making their own decisions in respect of the eligibility of these suppliers to bid in their procurements and be awarded public contracts, provided they do so in accordance with the Act. The government remains committed to holding organisations to account and I am considering what other steps can be taken to ensure meaningful action to address failings related to the Grenfell Tower fire. We will continue to engage with the MPS and CPS to ensure any future action does not impede the work of the police.

If the criminal process results in convictions, where appropriate, I will re-commence or launch new investigations which may enable stronger action in relation to procurement than could be taken at the present time. The government will continue to address all of the Inquiry’s recommendations and the issues the tragedy exposed.

Original parliamentary record

Residential Personal Emergency Evacuation Plans (Residential PEEPs)

Written Ministerial Statement House of Lords
Lord Khan of Burnley · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Honourable Friend the Parliamentary Under Secretary of State for Building Safety, Fire and Local Growth (Alex Norris MP) has today made the following statement: The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans. The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-a...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Honourable Friend the Parliamentary Under Secretary of State for Building Safety, Fire and Local Growth (Alex Norris MP) has today made the following statement:

The government is today laying regulations to address the last three outstanding Grenfell Tower Inquiry Phase 1 recommendations, on Personal Emergency Evacuation Plans, or PEEPs, and building-level evacuation plans.

The Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 mandate Residential PEEPs and mark a long-awaited step forward in improving the fire safety and evacuation of vulnerable residents who were so badly let down on the night of the tragedy. It applies to residents living in England in high-rise residential buildings (at least 7 storeys or 18 metres high), and 11-18 metre high buildings with a simultaneous evacuation strategy.

Through these Regulations, residents with physical and mental disabilities and impairments will be entitled to:

a person-centred fire risk assessment to consider their specific individual risks and ability to evacuate in the event of a fire;

the measures that could be reasonably and proportionately introduced to mitigate against their risks and aid their evacuation;

a written statement recording what they should do in a fire and;

provision of information to their local fire and rescue service (where the resident consents to the information being shared) so they know where the most vulnerable residents live and can support their evacuation or rescue in the event of a fire.

The regulations also mandate production of whole-building evacuation plans, shared with local fire and rescue services.

The laying of the Regulations addresses recommendations 33.22c, 33.22e, 33.22f (now nos. 59, 60 and 61) from Phase 1 of the Grenfell Tower Inquiry.

The government has committed funding this year to begin this important work by supporting social housing providers to deliver Residential PEEPs for their renters. Future years’ funding will be confirmed through the Spending Review and business planning processes.

In addition, government is today publishing a factsheet and toolkit to support building owners/managers as they develop Residential PEEPs. This toolkit contains real-life and proven initiatives to support vulnerable residents which have already been successfully deployed at scale.

The Regulations will come into force on 6 April 2026.

The government is committed to continued and full engagement with stakeholders as the policy is operationalised to ensure that it addresses the needs of users and reflects their lived experience. Specifically, we will:

Continue to engage key stakeholders on draft statutory guidance to support building owners/managers in fulfilling the requirements of the regulations. The guidance will be published in the autumn.

Set up a stakeholder advisory panel with representatives of disability stakeholders and building owners/managers, to identify and review new initiatives for inclusion in the toolkit.

Continue to listen to stakeholders as Residential PEEPs beds in, as part of monitoring the impact and effectiveness of the policy.

Original parliamentary record

Grenfell Tower

Written Ministerial Statement House of Lords
Lord Khan of Burnley · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Right Honourable Friend the Deputy Prime Minister and Secretary of State for Housing, Communities and Local Government (Angela Rayner MP) has today made the following statement:I want to provide the House with an update on the Government’s work with the Grenfell community and on my decision about the future of Grenfell Tower.Supporting the communityLearning the lessons from the Grenfell tragedy and ensuring lasting change are key priorities for the government. In his statement to this Hous...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Right Honourable Friend the Deputy Prime Minister and Secretary of State for Housing, Communities and Local Government (Angela Rayner MP) has today made the following statement:

I want to provide the House with an update on the Government’s work with the Grenfell community and on my decision about the future of Grenfell Tower.

Supporting the community

Learning the lessons from the Grenfell tragedy and ensuring lasting change are key priorities for the government. In his statement to this House in September, the Prime Minister committed to supporting the community now and always, and to building a legacy of change in their name.

I am committed to supporting bereaved families, survivors and immediate community, and working to ensure that we never see a repeat of the tragedy. Since my appointment, I have valued hearing directly from the community about the issues that matter to them.

Grenfell Tower

I am responsible for Grenfell Tower and for making a decision about its future. I understand that this is a deeply personal matter for those affected, and I am keeping their voice firmly at the heart of this decision making.

I would like to update the House that over the last week I have met bereaved families and survivors, and residents in the immediate community to explain my decision that Grenfell Tower will be carefully taken down.

Listening to the community

I have reached this decision after listening carefully to the community, and I am grateful to everyone who has shared their personal stories and views, especially bereaved and survivors.

In November last year, I explained to families that I would listen to their views and make sure their voices were heard, as well as to consider expert information before making a decision on the future of the Tower in February.

From November I offered bereaved and survivors the opportunity to meet in-person in North Kensington and Whitehall, or online, at different times and individually when families felt more comfortable with this. I have also spent time with representative groups, residents’ associations, schools and faith leaders. I am grateful to everyone who shared their view – whether directly with me, with the Minister or officials – and especially to the bereaved and survivors.

The Tower was the home of the 72 innocent people who lost their lives, and of survivors whose lives were forever changed. It is clear from conversations it remains a sacred site. It is also clear that there is not a consensus about what should happen to it.

For some, Grenfell Tower is a symbol of all that they lost. The presence of the Tower helps to ensure the tragedy is never forgotten and can act as a reminder of the need for justice and accountability. Being able to see the Tower every day helps some people continue to feel close to those they lost. For others it is a painful reminder of what happened and is having a daily impact on some members of the community. Some have suggested that some floors of the Tower should be retained for the memorial, others have said that this would be too painful.

Expert advice

I also considered independent expert advice. Engineering advice says that the Tower is significantly damaged. It remains stable because of the measures put in place to protect it but even with installation of additional props, the condition of the building will continue to worsen over time. Engineers also advise it is not practicable to retain many of the floors of the building in place as part of a memorial that must last in perpetuity.

Taking the engineering advice into account I have concluded that it would not be fair to keep some floors of the building that are significant to some families, whilst not being able to do so for others and knowing that, for some, this would be upsetting.

How the Tower will be taken down

The government is committed to taking the next steps respectfully and carefully. There will be continued support for, and engagement with, the community throughout the process.

In the coming months, the government will confirm the specialist contractor that will develop a detailed plan for taking the Tower down. The work will be led by technical experts with specific health and safety responsibilities and will include a methodology that includes environmental, health and safety measures and a detailed programme of work. The views the community have shared already will inform the plans. The department will continue to work with them, for example on arrangements to pay their respects.

There will be no changes to the Tower before the eighth anniversary.  It will likely take around two years to sensitively take down the Tower through a process of careful, progressive deconstruction that happens behind the wrapping.

We continue to support the independent Grenfell Tower Memorial Commission as the community choose a design team to work with them on designing a memorial.

I will ensure that parts of the Tower or materials from the site can be carefully removed and returned for inclusion as part of the memorial, if the community wishes.

The department has regularly consulted the Metropolitan Police, HM Coroner and the Grenfell Tower Inquiry to ensure decisions about the site do not interfere with their important work in pursuit of justice and accountability. The Police and HM Coroner have again recently confirmed they have everything they need.

Continued commitment for the community

My commitment to the community continues. I will ensure bereaved families, survivors and residents continue to have opportunities to speak with me and the Building Safety Minister on issues that matter to them most.

Original parliamentary record

Emergency Evacuation Information Sharing Plus (EEIS+) consultation response and Residential PEEPs policy

Written Ministerial Statement House of Lords
Lord Hanson of Flint · Labour Answering body: Home Office
Parliamentary excerpt

My rt hon Friend the Minister of State for Policing, Fire and Crime Prevention (Dame Diana Johnson) has today made the following Written Ministerial Statement:I am today publishing the Government’s response to the Emergency Evacuation Information Sharing Plus (EEIS+) consultation, which provides further detail of our new Residential PEEPs policy. This policy, which was previously announced in a written ministerial statement on 2 September 2024 (HCWS62), introduces new measures to improve the ...

Recorded statement

Answering body: Home Office

My rt hon Friend the Minister of State for Policing, Fire and Crime Prevention (Dame Diana Johnson) has today made the following Written Ministerial Statement:

I am today publishing the Government’s response to the Emergency Evacuation Information Sharing Plus (EEIS+) consultation, which provides further detail of our new Residential PEEPs policy.

This policy, which was previously announced in a written ministerial statement on 2 September 2024 (HCWS62), introduces new measures to improve the fire safety for vulnerable residents in high-rise and higher-risk residential blocks of flats, and represents a milestone in addressing the recommendations of the Grenfell Tower Inquiry, a key priority for this Government.

Following publication of this Government response, subject to parliamentary approval, we will move to lay Regulations to implement the new policy.

A copy of the Government response will be placed in the Libraries of both Houses and it will also be published on GOV.UK.

Original parliamentary record

Publication of the Grenfell Tower Inquiry Phase 2 Report

Written Ministerial Statement House of Lords
Baroness Smith of Basildon · Labour Answering body: Leader of the House of Lords
Parliamentary excerpt

My Rt Hon Friend the Prime Minister has made the following statement:The Chair of the Grenfell Tower Inquiry, Sir Martin Moore-Bick has today published the Inquiry’s Phase 2 Report.The report examines how it came to be that the Grenfell Tower was in the condition whereby a fire could spread so quickly and fatally, as tragically happened on 14 June 2017. A copy has been laid before each House of Parliament and I will make a statement to the House following Prime Minister’s Questions.The report...

Recorded statement

Answering body: Leader of the House of Lords

My Rt Hon Friend the Prime Minister has made the following statement:

The Chair of the Grenfell Tower Inquiry, Sir Martin Moore-Bick has today published the Inquiry’s Phase 2 Report.

The report examines how it came to be that the Grenfell Tower was in the condition whereby a fire could spread so quickly and fatally, as tragically happened on 14 June 2017. A copy has been laid before each House of Parliament and I will make a statement to the House following Prime Minister’s Questions.

The report finds substantial and widespread failings. The Government will carefully consider the report and its recommendations, to ensure that such a tragedy cannot occur again. I hope that those outside government will do the same. Given the detailed and extensive nature of the report, a further and more in-depth debate will be held at a later date.

My thoughts today are wholly with those bereaved by, and survivors of, the Grenfell Tower tragedy and the residents in the immediate community. This day is for them. I hope that Sir Martin’s report can provide the truth they have sought for so long, and that it is step towards the accountability and justice they deserve.

I would like to thank Sir Martin, his panel of Thouria Istephan and Ali Akbor, and the Inquiry team for their thorough work on producing this report and for their years of work on this Inquiry.

Original parliamentary record

Building Safety

Written Ministerial Statement House of Lords
Baroness Taylor of Stevenage · Labour Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Hon Friend the Parliamentary Under Secretary of State for Building Safety and Homelessnes (Rushanara Ali MP) has today made the following statement: Today, I can update Parliament on fire safety and evacuation proposals; on the recognition of CE (‘Conformité Européenne’) marking for construction products; and on updates to the statutory guidance to the building regulations to remove references to outdated National Classes fire testing standards and make provision for sprinklers in new care...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Hon Friend the Parliamentary Under Secretary of State for Building Safety and Homelessnes (Rushanara Ali MP) has today made the following statement:

Today, I can update Parliament on fire safety and evacuation proposals; on the recognition of CE (‘Conformité Européenne’) marking for construction products; and on updates to the statutory guidance to the building regulations to remove references to outdated National Classes fire testing standards and make provision for sprinklers in new care homes.

Fire safety and evacuation

The Home Office will bring forward proposals in the Autumn to improve the fire safety and evacuation of disabled/vulnerable residents in high-rise and higher-risk residential buildings in England in response to the Grenfell Tower Inquiry’s Phase 1 recommendations that relate to Personal Emergency Evacuation Plans, or PEEPs. These proposals will be called ‘Residential PEEPs’.

Through them, residents with disabilities and impairments will be entitled to a person-centred risk assessment to identify appropriate equipment and adjustments to aid their fire safety / evacuation, as well as a ‘Residential PEEPs statement’ that records what vulnerable residents should do in the event of a fire.

The Government has committed funding next year to begin this important work by supporting social housing providers to deliver Residential PEEPs for their renters. Future years’ funding will be confirmed at the upcoming Spending Review.

The Government has made progress on delivering recommendation 33.22[d] of the Grenfell Tower Inquiry’s Phase 1 report, on Evacuation Alert Systems (‘sounders’) for new builds, through amendment to statutory guidance to the building regulations in relation to high-rise residential building design (requiring sounders to be fitted in new buildings over 18 metres in height).

We will consider further the second part of the recommendation, relating to existing buildings, in light of further evidence or recommendations in the Phase 2 report. This will, like the work on fire safety improvements nationally, be part of the important task of reducing the likelihood and impact of future fires.

CE marking

Construction products are a pivotal part of the housing and infrastructure supply chain and make up 13% of the United Kingdom’s (UK) entire manufacturing base by turnover. Ensuring continuing supply of products is critical to delivering house building targets and wider infrastructure ambitions. These products must be safe. Evidence to the Grenfell Tower Inquiry revealed the scale of concern about construction products – products which are vital to all our buildings and infrastructure – and the system that oversees them remains inadequate.

A subset of construction products fall within scope of the current construction products regulations. These existing regulations set out rules for placing construction products on the market, providing a common technical language to assess the performance of products. Products within scope of these regulations must undergo an assessment of conformity with the relevant standard or technical assessment. Such products must also be affixed with a UKCA (UK Conformity Assessed) or a CE (Conformité Européenne) mark. Current Government guidance sets out that recognition of CE marking will end in June 2025.

I can announce today that the Government will extend the period of recognition of CE marking for construction products. The CE mark will continue to be available when placing construction products on the market across the UK.

We have listened to the findings from the Independent Review of the Construction Products Testing Regime. This was clear that there is currently insufficient testing and certification capacity in the UK alone to provide the volume of conformity assessment that would be required were CE recognition to end. We are also clear that ending recognition of CE marking without reforming the domestic regime would create trade barriers and negatively affect the supply of products that meet recognised standards.

I am also determined to address the inadequacies across the wider construction products regime. Residents and communities need to be confident that their homes will be safe and well-built now and in the future. To ensure this, the Government will want to take into account any recommendations from the forthcoming Grenfell Inquiry report to inform proposals for reform. Therefore, I am making this extension, and the longer-term future of CE/UKCA marking, conditional on this Government committing to system wide reform of the construction products regulatory regime.

The Government recognises the role of UK Conformity Assessment Bodies in ensuring compliance of goods on the market. As part of the reforms the Government will work with UK Conformity Assessment Bodies, the UK Accreditation Service, and the wider industry to strengthen the conformity assessment market.

Lastly, I recognise the need for industry to have sufficient certainty to support supply chains. I can confirm that any subsequent changes to the recognition of CE marking would be subject to a minimum 2-year transitional period.

National Classes and Sprinklers in care homes

I am also announcing, today, publication of two updates to the statutory guidance that accompanies Building Regulations. First, we are introducing a provision for sprinklers to be installed in new care homes; and second, we are completing the withdrawal of the outdated National Classes fire testing standards, ending a long period of dual specification in favour of the more robust European standard. This implements the recommendation, made in the Hackitt Report, for a clearer, transparent and effective testing regime. Alongside guidance for second staircases in tall residential buildings that are more than 18m in height, which was published on 29 March 2024, these measures conclude the new policy responses to the Sprinklers in care homes, removal of national classes, and staircases in residential buildings consultation, which ran from 23 December 2022 to 17 March 2023.

Withdrawing the National Classes fire testing standards from ‘Approved Document B’ will end the dual classification system that has operated since the early 2000s in favour of the more rigorous, internationally recognised European standard (BS EN 13501). The current testing standard tests for both reaction to fire and fire resistance. I am aware that there are a small number of manufacturers who have only ever tested to National Class standards who will need time to re-test their products. We are providing industry with a transition period of five years for fire resistance and 6 months for reaction to fire. This is a generous yet critical approach and has been put in place to facilitate a smooth transition to the European standard that is not disruptive to supply chains.

A compassionate society protects its most vulnerable. Today, I am also publishing an update to ‘Approved Document B’ that makes provision for sprinklers in all new care homes. Sprinklers enhance fire protection where residents may be reliant on others for help and assistance, especially if a building evacuation is needed. Many care home providers already include sprinklers in new designs. For those that do not yet provide for sprinklers, again, I recognise that businesses and investors seek certainty. So, care homeowners and developers will benefit from a six-month transition period until the guidance comes into effect and will then have a further six months to enable work on current development projects that are underway, or about to start, to continue.

Original parliamentary record

Publishing the Government’s Official Response to the Fire Reform White Paper and Consultation

Written Ministerial Statement House of Lords
Lord Sharpe of Epsom · Conservative Answering body: Home Office
Parliamentary excerpt

My rt hon Friend the Minister of State for Crime, Policing and Fire (Chris Philp) has today made the following Written Ministerial Statement:I am pleased to announce to the House that the Government is today publishing our official response to the fire reform White Paper and consultation. Last year we published our White Paper, “Reforming Our Fire and Rescue Service” (CP 670), to gauge the public and sector’s views on how we wished to drive reform within fire and rescue services. Our proposal...

Recorded statement

Answering body: Home Office

My rt hon Friend the Minister of State for Crime, Policing and Fire (Chris Philp) has today made the following Written Ministerial Statement:

I am pleased to announce to the House that the Government is today publishing our official response to the fire reform White Paper and consultation.

Last year we published our White Paper, “Reforming Our Fire and Rescue Service” (CP 670), to gauge the public and sector’s views on how we wished to drive reform within fire and rescue services. Our proposals were built on the lessons learned from the COVID-19 pandemic as well as the recommendations from HMICFRS’ independent inspections, challenging national report findings and the Grenfell Tower Inquiry.

In the period since the White Paper was published, further challenges in the fire sector have been the focus of public and parliamentary debate. I refer, in particular, to the independent review of culture in the London Fire Brigade and the HMICFRS national spotlight report into values and culture. These reports highlighted misconduct in multiple fire and rescue services and uncovered totally unacceptable behaviours. Our White Paper response sets out our ambition to improve integrity across the sector.

The feedback on our proposals has allowed us to refine our next steps and announce today our package of reform, which will focus on the areas that have the biggest impact for the public and for fire professionals: developing a profession to be proud of and ensuring that fire services do more to put the public first. These include:

Introducing a professional College of Fire & Rescue to raise standards and strengthen leadership.

Developing provision for fire chiefs to have operational independence.

Tasking the National Joint Council to review the pay negotiation mechanism.

Taking action to improve integrity and culture in fire and rescue services through improved training, more open recruitment practices and working towards a statutory code of ethics for fire and rescue employees.

Our fire and rescue professionals deserve our support as they not only respond to a changing world but also seek to develop and strengthen their own capabilities. This consultation response sets out how we can work together with partners across the fire sector to deliver this.

I would like to put on record my thanks to everyone who has engaged with us on our White Paper and consultation. Whether you have helped us shape our proposals or provided feedback on how they can work, your help has ensured we can drive forward much needed and long overdue reform for our fire and rescue services and ensure the best possible service for the public.

The Government’s response has been laid before Parliament as a Command Paper (CP 993) and will be available at: https://www.gov.uk/government/consultations/reforming-our-fire-and-rescue-service

Original parliamentary record

Fire Reform White Paper and improving Fire Safety for the public

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Home Office
Parliamentary excerpt

I am pleased to make a number of announcements to the House today that set out both the Government’s fire reform agenda and the introduction of a package of fire safety measures that will protect the public for years to come. Taken together, this is about: Driving forward reform of the Fire and Rescue Service by launching the Fire Reform White Paper and consultation (CP 670).Implementing a package of measures to improve fire safety.Improving transparency and engaging the public. Fire Reform W...

Recorded statement

Answering body: Home Office

I am pleased to make a number of announcements to the House today that set out both the Government’s fire reform agenda and the introduction of a package of fire safety measures that will protect the public for years to come. Taken together, this is about:

Driving forward reform of the Fire and Rescue Service by launching the Fire Reform White Paper and consultation (CP 670).

Implementing a package of measures to improve fire safety.

Improving transparency and engaging the public.

Fire Reform White Paper and Consultation

The Fire Reform White Paper and consultation seeks to introduce system-wide reform to strengthen fire and rescue services across England. The proposals are set out under three key themes: people; professionalism; and governance. The consultation is launching today to seek views and will be open for 10 weeks.

https://www.gov.uk/government/consultations/reforming-our-fire-and-rescue-service

Review of the National Joint Council

As set out in the White Paper the government will launch a review of the National Joint Council for Local Authority Fire and Rescue Services. The review, which will commence later this year, will consider whether the pay negotiation mechanism in England is fit for purpose.

The Fire Safety Act 2021

The Fire Safety Act 2021 was commenced in full on 16 May 2022. This will clarify that structure, external walls and flat entrance doors of blocks of flats are within scope of the Regulatory Reform (Fire Safety) Order 2005 (the Fire Safety Order) and ensure that they are included in that building’s fire risk assessment.

https://www.gov.uk/government/publications/fire-safety-act-2021

Fire Risk Assessment Prioritisation Tool

To support commencement of the Fire Safety Act 2021, the Home Office is publishing supporting guidance issued under article 50 of the Fire Safety Order and launching an online prioritisation tool. The new Fire Risk Assessment Prioritisation Tool has been developed to help Responsible Persons identify the priority for updating fire risk assessments.

Fire Risk Assessment Prioritisation Tool

Fire Safety (Regulations) 2022

The Fire Safety (England) Regulations 2022 will require Responsible Persons to send information on high-rise residential buildings which will help fire and rescue services better plan for and respond to a fire. They will also improve fire safety in high-rise buildings by setting a baseline on safety checks on lifts for firefighters and other key pieces of firefighting equipment and, in mid-rise buildings, on doors. They will also make residents in all multi-occupied residential buildings feel safer by providing them with fire safety instructions and information on the importance of fire doors.

https://www.gov.uk/government/publications/fire-safety-england-regulations-2022

Personal Emergency Evacuation Plans (PEEPs) consultation response, and new consultation

We are publishing the responses to our PEEPs consultation which we ran from 8 June to 19 July 2021.

We have taken account of the substantial difficulties of mandating PEEPs in high rise residential buildings and have developed new proposals that we are confident deliver proportionality, practicality and improve safety for those vulnerable people living in the highest risk buildings. We will now consult and seek views on these proposals.

https://www.gov.uk/government/consultations/personal-emergency-evacuation-plans

https://www.gov.uk/government/consultations/emergency-evacuation-information-sharing

Fourth thematic update on Grenfell Tower Inquiry Phase 1 recommendations

We are publishing our latest update on progress against Grenfell Tower Inquiry Phase 1 recommendations. This shows progress made by Government departments, and relevant public authorities, including the London Fire Brigade, and National Fire Chiefs Council. The tracker provides a digestible, transparent way for the public to hold those responsible for delivering recommendations to account.

https://www.gov.uk/government/publications/quarterly-thematic-update-on-progress-against-the-grenfell-tower-inquiry-phase-1-recommendations

Fires in high-rise residential buildings in England are rare, and thankfully deaths from fires in high-rise residential buildings are extremely rare. The Government, however, is committed to learning the lessons of the tragedy at Grenfell Tower.

Original parliamentary record

Personal Emergency Evacuation Plans in High-rise Residential Buildings Consultation

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Home Office
Parliamentary excerpt

Today, the Government publishes a new consultation on Personal Emergency Evacuation Plans in High-rise Residential Buildings which will be open from 8 June to 19 July 2021.This new consultation contains proposals to implement the Grenfell Tower Inquiry Phase 1 Report recommendations on Personal Emergency Evacuation Plans in high-rise residential buildings. These recommendations require a change in law to place new requirements on owners or managers of multi-occupied high-rise residential buil...

Recorded statement

Answering body: Home Office

Today, the Government publishes a new consultation on Personal Emergency Evacuation Plans in High-rise Residential Buildings which will be open from 8 June to 19 July 2021.

This new consultation contains proposals to implement the Grenfell Tower Inquiry Phase 1 Report recommendations on Personal Emergency Evacuation Plans in high-rise residential buildings. These recommendations require a change in law to place new requirements on owners or managers of multi-occupied high-rise residential buildings.

This consultation supports delivery of two of the Grenfell Tower Inquiry Phase 1 recommendations and is part of the government’s package of reforms to improve building and fire safety in all regulated premises where people live, stay or work.

We are consulting on the following proposals:

Proposal 1: We propose to require the Responsible Person to prepare a Personal Emergency Evacuation Plan for every resident who self-identifies to them as unable to self-evacuate (subject to the resident’s voluntary self-identification) and to do so in consultation with them.

Proposal 2: We propose to provide a template to assist the Responsible Person and the residents in completing the plan, and to support consistency at a national level.

Proposal 3: We propose to require the Responsible Person to complete and keep up to date information about residents in their building who would have difficulty self-evacuating in the event of a fire (and who have voluntarily self-identified as such), and to place it in an information box on the premises to assist effective evacuation during a rescue by the fire service.

Proposal 4: We propose, in order to assist the Responsible Person and support consistency at a national level, to provide a template, most likely in a one-page format, to capture the key information to be provided in the information box.

Further details can be found in the consultation and its supportive documents available at: www.gov.uk/government/consultations/personal-emergency-evacuation-plans. A copy of the consultation will also be placed in the Libraries of both Houses.

Original parliamentary record

Publication of the Government Response to the Fire Safety Consultation

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Home Office
Parliamentary excerpt

Today, the Government publishes its response to the Fire Safety Consultation held from 20 July -12 October 2020. This public consultation was a vital step in a process to ensure that the Regulatory Reform (Fire Safety) Order 2005 (the ‘Fire Safety Order’) continues to be fit for purpose as part of the Government’s consideration of the reform of the wider building safety landscape. The consultation sought views on a number of proposals to: Strengthen the FSO and improve compliance in all regul...

Recorded statement

Answering body: Home Office

Today, the Government publishes its response to the Fire Safety Consultation held from 20 July -12 October 2020.

This public consultation was a vital step in a process to ensure that the Regulatory Reform (Fire Safety) Order 2005 (the ‘Fire Safety Order’) continues to be fit for purpose as part of the Government’s consideration of the reform of the wider building safety landscape. The consultation sought views on a number of proposals to:

Strengthen the FSO and improve compliance in all regulated premises (section 1).

Implement the Grenfell Tower Inquiry Phase 1 Report recommendations that require a change in the law (section 2).

Improve the effectiveness of consultation between building control bodies and fire and rescue authorities on planning for building work and the arrangements for the handover of fire safety information (section 3).

We received feedback from over 250 stakeholders with an interest in building and fire safety, including residents, responsible persons and enforcing authorities, which we have used to inform our response. The Government has listened, and now we are taking action.

We will be bringing forward a number of changes to the Fire Safety Order, legislating where necessary primarily via the Building Safety Bill, as well as through building regulations fire safety guidance, to strengthen fire safety in all regulated buildings. We will:

Improve the quality of fire risk assessments by requiring that a Responsible Person (RP) must not appoint a person to assist them with undertaking a fire risk assessment unless they are competent and a requirement on all RPs to record their completed fire risk assessments and prescribed information. The name and/or organisation of any person engaged by the RP to undertake all or part of the fire risk assessment will also need to be recorded to assist enforcing authorities undertaking enforcement action to establish compliance.

Improve the identification of RPs by requiring them to record (and update as necessary) who they are, and the extent of their responsibility under the Fire Safety Order, and to include a UK based address. This will sit alongside a further proposal to require all RPs to take reasonable steps to identify themselves to each other where they share or have duties in respect of the same premises. A new requirement will also be introduced to ensure that information is transferred effectively between outgoing RPs and their replacements.

Amend existing provision relating to statutory guidance for RPs to include provision that failure to follow such guidance may be considered in court proceedings for breaches of the Order as evidence of such a breach, and conversely proof of following guidance may be considered as evidence of compliance.

Increase the level of fines from Level 3 (£1,000) to Level 5 (unlimited) for offences in relation to the impersonation of an inspector, failure to comply with specific requirements imposed by an inspector, and failure to comply with requirements relating to the installation of luminous tube signs.

Amend the guidance in Approved Document B of the Building Regulations to require all new buildings above 11 metres to provide a readily locatable, accessible and secure Premises Information Box, to tie in with the height threshold for new buildings to require sprinklers and signage.

The Fire Safety Consultation consulted on a range of areas to strengthen fire safety. Where further work is required to develop policy, we will continue to consider the findings of the consultation and engage with the sector and stakeholders to inform ongoing policy development in these areas.

The Fire Safety Consultation also included proposals to implement recommendations from the Grenfell Tower Inquiry Phase 1 Report requiring changes to the law. We will consider these proposals further in light of the consultation responses and – subject to the Fire Safety Bill gaining Royal Assent – intend to lay Regulations before the second anniversary of the Grenfell Tower Inquiry Phase One Report which will deliver on the Inquiry’s recommendations. These will include measures around checking fire doors and lifts.

Three of these proposals related to Personal Emergency Evacuation Plans (PEEPs). The Government’s commitment to implementing the Inquiry’s recommendations remains undimmed, as does our commitment to ensure those most affected by the tragic events at Grenfell Tower – the bereaved and survivors – continue to have a voice in their implementation. It is important that we get this right and ensure the voice of residents and those likely to be affected by the proposals are heard. That is why we have decided to undertake a further consultation this spring to seek additional views on the complex issue of personal emergency evacuation plans in relation to the proposals to implement the relevant Grenfell recommendations. Further details about this will be available soon on the Government’s website.

Finally, proposals to improve the engagement between Building Control Bodies and Fire Authorities in reviewing plans for building work and for the handover of fire safety information to the Responsible Person on completion will be implemented through changes to legislation and guidance.

We are determined to ensure that the public feel safe and are safe from fire in all regulated premises regardless of where they live, stay or work. These changes, alongside the Fire Safety Bill, Building Safety Bill and planned overhaul of the statutory guidance provided under the Fire Safety Order are important steps needed to strengthen the whole regulatory system for building and fire safety. Taken together they will help to ensure there is greater accountability and responsibility for fire and structural safety issues throughout the lifecycle of all buildings regulated by the Fire Safety Order.

Further detail of the changes we are making can be found in the consultation response. The consultation response will be available at: https://www.gov.uk/government/consultations/fire-safety. A copy will also be placed in the Libraries of both Houses.

Original parliamentary record

Concluding Part One of the Police and Crime Commissioner Review

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Home Office
Parliamentary excerpt

My rt hon Friend the Secretary of State for the Home Department (Priti Patel) has today made the following Written Ministerial Statement:I am pleased to set out to the House findings from the first part of our two-part Review into the role of Police and Crime Commissioners (PCCs). The Government’s manifesto committed to strengthening the accountability of PCCs and expanding their role. The public want to see a reduction in crime and PCCs are elected to deliver on the people’s priorities. Eigh...

Recorded statement

Answering body: Home Office

My rt hon Friend the Secretary of State for the Home Department (Priti Patel) has today made the following Written Ministerial Statement:

I am pleased to set out to the House findings from the first part of our two-part Review into the role of Police and Crime Commissioners (PCCs).

The Government’s manifesto committed to strengthening the accountability of PCCs and expanding their role. The public want to see a reduction in crime and PCCs are elected to deliver on the people’s priorities. Eight years on from their introduction, it is the right time to step back and consider how we can better ensure that the public can hold PCCs to account for the performance of their force.

In delivering the recommendations from Part One of the Review, we will make it easier for the public to make an informed decision about the record of their PCC at the ballot box by strengthening accountability and improving transparency. The recommendations set out below apply to PCCs and mayors with PCC functions.

Part One of our internal Review began in late July and collated views and evidence from stakeholders across policing, fire and local government as well as voluntary and community organisations. Through polling and focus groups the Review also took account of public views and opinions. We focussed on changes required to sharpen the model which, where possible, can be delivered ahead of the 2021 PCC elections.

On policing, the Home Office will bring forward a range of measures which will: strengthen PCC accountability; improve their transparency to the public; clarify the relationship between PCCs and Chief Constables; bring more consistency to the PCC role; raise professional standards; and improve the checks and balances currently in place.

The Review concluded there was more to be done to explain the role of PCCs and make their record on crime more transparent to the voting public, thus enhancing their accountability. To help achieve this:

The Home Office will amend the Specified Information Order to require PCCs to provide a narrative on their force’s performance against the Government’s crime measures, and Her Majesty’s Inspectorate of Constabulary and Fire and Rescue Services (HMICFRS) force performance reports. The Specified Information Order currently places a duty on PCCs to publish certain information within specified timeframes, to ensure the public have the information they need to hold their Commissioner to account at the ballot box.

In line with the Government’s manifesto position in favour of First Past the Post, which provides for strong and clear local accountability, and reflects that transferable voting systems were rejected by the British people in the 2011 nationwide referendum, the Home Office will work with the Cabinet Office and the Ministry of Housing, Communities and Local Government to change the voting system for all Combined Authority Mayors, the Mayor of London and PCCs to First Past the Post. This change will require primary legislation, which we will bring forward when Parliamentary time allows.

We concluded there are clear steps we can take to sharpen local accountability and ensure the framework guiding the relationship with Chief Constables is clarified:

The Home Office will work with the College of Policing, Association of Police and Crime Commissioners and National Police Chiefs’ Council to build on the Accountability Guidance already in place, including in relation to the performance management of Chief Constables, to help to promote and embed a positive relationship between Chief Constables and PCCs.

The Home Office will consult on potential changes to the Policing Protocol Order 2011 to provide a ‘brighter-line’ on the boundaries of operational independence and reflect changes in the relationship between the parties to the Protocol which have taken place over time. The Protocol sets out how the policing governance relationships should work, including that of the Home Secretary, and clarifies the roles and responsibilities of PCCs, Chief Constables and Police and Crime Panels.

The Home Office will also legislate to amend Section 38 of the Police Reform and Social Responsibility Act 2011, to make the Chief Constable dismissal process more rigorous and transparent, by requiring a PCC to give the Chief Constable written notice (including grounds), as the first stage of the dismissal process; allowing for the Chief to provide HMCIC a response to those grounds; and introducing some form of time limit or review interval on a Chief Constable’s suspension from office. The Home Office will also work with the College of Policing, NPCC and APCC to develop a framework for the use of independent mediation in appropriate circumstances.

We will also seek to address the HMICFRS recommendations included in its ‘Leading Lights’ (September 2019) report, looking into the role of the College of Policing in the senior recruitment process. We will work with stakeholders to address the issues raised through this review in relation to fixed term appointments.

To improve scrutiny, the Home Office will work with the Local Government Association (LGA) to develop a good governance training package for Police and Crime Panels.

Part Two of the Review will also allow us to consider the role of the Independent Office of Police Complaints (IOPC) with respect to their handling of complaints made about the conduct of PCCs and their deputies.

The Review concluded more should be done to ensure that all PCCs adopt best practice and, given our later recommendations on fire, there is now a need to improve the resilience of the Office of the PCC:

We recommend that the APCC works with the College of Policing to build on the policing Knowledge Hub to develop a ‘what works’ compendium for PCCs.

The Home Office and APCC will jointly develop a comprehensive set of non-statutory guidance on the core elements of the PCC role. In conjunction, the APCC should deliver a formal programme of induction for new and returning PCCs post-elections in May 2021.

To enhance resilience and capacity of PCCs, given our intention to expand the role into fire, the Home Office will bring forward legislation to mandate that each PCC must appoint a Deputy (of the same political party where the PCC represents a political party). In the interim, we will issue guidance to PCCs’ offices requesting that a formal succession plan is put into place to deal with vacancy and incapacitation, involving the Police and Crime Panel in those discussions as necessary. This will not apply to mayors with PCC functions, where legislation already mandates that a Deputy Mayor must be in place.

To ensure PCCs have the levers they need to tackle crime, in Part Two of the Review, the Home Office will consult on giving a General Power of Competence (as afforded to Local Authorities) to all PCCs, to potentially help PCCs with the role they play in the wider crime and criminal justice landscape, and will consider partnership arrangements more fully.

On fire, the Government is clear that further reform of fire and rescue is required in order to respond to the recommendations from Phase 1 of the Grenfell Tower Inquiry, the Kerslake Review and to build on the findings from Sir Thomas Winsor’s State of Fire and Rescue Report. Our reform agenda will focus on three key areas: people; professionalism; and governance. Taken together, improvements in these areas will help deliver higher standards and greater consistency across fire and rescue services.

The Review kick-started our work on fire service governance and the findings signalled strong support for a directly elected individual taking on fire functions to help simplify and strengthen the governance of fire and rescue services across England. The Home Office will be launching a consultative White Paper on fire reform later this year. The White Paper will be used to set out our reform agenda in further detail and explore the Review proposals on fire governance which include:

Consulting on whether to mandate the transfer of fire and rescue functions to the Police, Fire and Crime Commissioner model across England where boundaries are coterminous, unless there is an option to transfer fire governance directly to an elected Mayor.

Consulting on how to address coterminosity challenges, including in the South West.

Legislating to create operational independence for Chief Fire Officers and to clearly separate and delineate strategic and operational planning for fire and rescue.

Considering options to clarify the legal entities within the PFCC model.

With regard to mayoral devolution, this Review has cemented our view that the join up of public safety functions under a combined authority mayor has the potential to offer wider levers to prevent crime. We will take steps to remove barriers to more mayors taking on these functions and will work with MHCLG to develop the forthcoming Devolution and Local Recovery White Paper with that longer-term trajectory in mind.

Part Two of the Review will begin after the 2021 elections and will allow us to consider further ways to strengthen and expand efforts to help cut crime. It will focus on longer-term reforms and the potential for wider efficiencies to be made, with a view to implementation ahead of the 2024 elections. Terms of reference for Part Two of the Review will be published in this House at the appropriate time.

I would like to put on record my thanks to our Advisory Group which supported the first part of this Review, comprising senior external stakeholders with expertise in the policing and fire sectors.

Original parliamentary record

Grenfell Update

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:The Grenfell Tower fire in 2017 was a national tragedy. 72 people died in the greatest loss of life in a residential fire since the Second World War; many more mourn the loss of their families, friends, community, and homes.Grenfell Tower Inquiry published its Phase 1 report on 30 October 2019. The Report’s findings...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:

The Grenfell Tower fire in 2017 was a national tragedy. 72 people died in the greatest loss of life in a residential fire since the Second World War; many more mourn the loss of their families, friends, community, and homes.

Grenfell Tower Inquiry published its Phase 1 report on 30 October 2019. The Report’s findings addressed the events of that night - the fire, how it started and spread, and the emergency response to it. Today I am updating the House on the progress and choices that the Government has made in implementing and acting on these recommendations. We owe it to the bereaved, the survivors, the community, and indeed all people living in blocks of flats around the country to demonstrate that we are making progress and their homes are being made safer.

The Government is delivering a comprehensive programme of reform on building and fire safety to ensure real and long-lasting, change. In the past year we have acted on the recommendations of Sir Martin and the Inquiry, in addition to our ongoing work in response to recommendations made by Dame Judith Hackitt in the Independent Review. We are addressing historic defects and delivering new legislation. This will bring about thorough regulatory reform; and ensure that people feel empowered and listened to and, more importantly, that they are safe and feel safe in their homes.

We recognised the importance of urgent action to remove unsafe Aluminium Composite Material (ACM) cladding from high-rise residential buildings, and to date 77 per cent of identified high-rise residential and publicly owned buildings have already been or are in the process of being fully remediated. We expect this figure to rise significantly by 31 December as the remaining residential buildings have a plan in place or have expressed their intention to remediate. As well as providing support, we will hold the owners of these buildings to account and keep residents safe in their homes.

We have worked with the Royal Borough of Kensington and Chelsea and local health and education partners to help the community in its recovery: rehousing residents of the Tower and of Grenfell Walk; providing funding to support refurbishment of the Lancaster West Estate; and addressing local concerns about the impact of the fire on health and the local environment.

We want the views of Grenfell communities to be heard across government, which is why the Prime Minister appointed Rt Hon Nick Hurd, former Minister for Grenfell Victims, as his Independent Adviser to represent the views of Grenfell communities at the heart of government. We know that the bereaved and the survivors of the Grenfell Tower fire await the forthcoming Social Housing White Paper, and we anticipate publishing this in the coming month.

My officials are working with the Grenfell community and the people affected by the fire, including on the delivery of a fitting and lasting memorial to the 72 people who very sadly lost their lives. As well as continuing to provide regular updates to the community about the site and regarding the legislative programme, we will also ensure we provide further regular updates on progress against the Inquiry’s recommendations.

Recommendations from the Grenfell Tower Inquiry Phase One Report

The report made 46 detailed recommendations to improve fire safety, directed at a range of organisations including: the London Fire Brigade (LFB) and Fire and Rescue Services more broadly, other emergency services, building owners, and Government. The Government is already taking forward a number of these recommendations, including: fundamental legislative change; working with Fire and Rescue Services to support them in making the necessary improvements; starting specific projects on evacuation; working with local leaders and national bodies to ensure that action is being taken across the country supported by new funding; and identifying and remediating buildings with historic risks from unsafe cladding.

Building a safer future

Since December 2019, the Home Office has led on developing and introducing the Fire Safety Bill. That Bill will clarify the scope of the Fire Safety Order (FSO) in multi-occupied residential buildings. In particular, it will place beyond doubt that in multi-occupied residential blocks the FSO applies to the structure, external wall systems and flat entrance doors, ensuring that Fire and Rescue Authorities can confidently take enforcement action where building owners or managers are not compliant.

The Fire Safety Bill paves the way for secondary legislation which we propose to make after the commencement of the Fire Safety Bill next year. The Fire Safety Consultation held this year set out Government proposals to strengthen fire safety in regulated buildings in England to ensure that people are safe from fire regardless of where they live, stay or work. These proposals are a practical and effective approach to address the risks the Inquiry identified in Phase 1. They will provide residents with greater assurance and deliver fire safety improvements in their buildings and hold Responsible Persons, including building owners and managers, to account. At the same time, the Government will be introducing the Building Safety Bill in 2021, paving the way for a strengthened building safety regime for buildings, with an even stronger regime for high rise buildings.

Looking to the future, at the heart of the new building safety regime are two new regulators. The first, the Building Safety Regulator, will implement the more stringent regulatory regime for high risk residential buildings. It will also oversee the safety and performance of other buildings and support work to improve the competence of professionals across the industry. The Regulator will be delivered by the Health and Safety Executive and began to operate in shadow form earlier this year.

We are also committed to further strengthening the regulation of construction products. Our draft Building Safety Bill includes provisions for a more robust regulatory framework that covers a wider range of products. It will strengthen the powers available to regulators, enforce the rules and lay the groundwork to establish of a national regulator which will spearhead the new approach.

The shadow Building Safety Regulator, within the HSE, is already advising the Government on the new regime. Over the coming months, it will develop guidance to ensure that all regulators involved understand how this will operate, and what they need to do to prepare for it.

Together, the measures in the draft Building Safety Bill, Fire Safety Bill, and Fire Safety Order consultation will improve safety standards for residents in all blocks of flats. Stricter regulations for high-rise buildings will make sure those living in them can feel safe and be safe in their homes – as is their right. Indeed, everything my officials do across the Building Safety Programme in the Ministry for Housing Communities and Local Government (MHCLG) and the Fire and Resilience Directorate in the Home Office is driven by a shared determination to prevent the recurrence of a tragedy like Grenfell.

Fire and Rescue Services

The Phase 1 report made it very clear that Fire and Rescue Services should make significant improvements to their training; policies and practices; and their equipment and technology. We are seeking real changes demonstrated through an investment in the right types of training, leadership and equipment.

That is why the Home Secretary wrote to LFB, requiring regular reporting on its progress on implementing the recommendations. Although there is still more to do, we are encouraged that LFB continues to focus on implementing all the recommendations directed to them as well as those targeting services more broadly. The LFB has revised its policies, and through a programme of training is embedding changes in the approach to high-rise firefighting. The integration of different and new technologies such as the trialling of drones to improve situational awareness and support incident commanders, is encouraging. The use of smoke hoods and smoke curtains to assist with evacuations, trialled in large scale operational exercises, appears to be a positive step. The Home Office continues to receive regular reports which have shown steady and concerted progress, even against a backdrop of the pandemic.

The Home Secretary has also commissioned Her Majesty’s Inspectorate of Constabulary and Fire and Rescue Services (HMICFRS) to review the governance and progress of LFB’s action plan to implement the recommendations from the Grenfell Tower Inquiry Phase 1 report. We anticipate the outcome of this initial review in January 2021.

The National Fire Chiefs Council (NFCC) is reflecting the Inquiry’s recommendations in its ongoing review of National Operational Guidance and the development of national standards through the Fire Standards Board, which this Government established. The Minister of State for Building Safety and Communities last month hosted a roundtable for all fire chiefs and chairs, to ensure that local services were equally committed to making rapid and meaningful progress in order to protect communities.

To ensure that the lessons from Grenfell are learned and change is implemented at pace we have made available £10 million in additional funding in 2020/21 to drive change nationally and in local services. A further £20 million has been provided to support fire protection activity across England.

As with London, HMICFRS will provide independent assurance on the effectiveness of services in responding to the recommendations as part of its second cycle of inspection, which the Home Secretary has agreed will commence in the new year.

Fire Protection

The Independent Review into Building Regulations and Fire Safety found the system ‘broken’. This broken system is being further revealed through the work of the Grenfell Tower Inquiry. The Phase 1 report found that a number of key fire protection measures failed to work as they should have at Grenfell. The Inquiry identified failings in the way in which LFB fulfilled its obligations under s.7(2)(d) of the Fire and Rescue Services Act 2004. This requirement is in place to ensure that it had the information needed for extinguishing fire and protecting life at the Tower.

Post Grenfell, we have seen other examples, which have further highlighted the importance of strengthening the overall protection capability and capacity of fire and rescue services. The work of HMICFRS, The Independent Review and the Grenfell Tower Inquiry evidence the need for more to be done to ensure that people are safe and secure in their homes and that FRSs need additional support to deliver an improved protection function to help achieve this goal. It is important that people can feel safe in their homes and that is why we have committed to ensuring that all high-rise residential buildings are inspected or reviewed by the end of 2021.

Our first priority for the £20 million protection funding has been to ensure that fire and rescue services are able to review or inspect every high-rise residential building in England by the end of 2021. This is a major programme of work, overseen by the Fire Protection Board, which will set the foundation for the building safety regulator. The funding has also created a new leadership function in NFCC; and provides funding for Fire and Rescue Services to have the capability and capacity to respond to risks in other potentially higher risk buildings, including residential buildings under 18 metres, care homes and hospitals.

Both MHCLG and the Home Office have worked with services and the NFCC, through the Fire Protection Board, to ensure appropriate interim measures remain in place to protect residents in buildings with dangerous cladding, such as ACM. The revised NFCC Simultaneous Evacuation Guidance, published on 1 October 2020, provides clearer advice which supports the Fire and Rescue Services and responsible persons to fully evacuate as soon as a fire is detected. The guidance advises responsible persons to explore cost benefit options with leaseholders and residents. It also encourages the installation of Common Fire alarms systems which means reducing the dependency on waking watch wherever possible. The guidance also reiterates that interim measures should only ever be short term and are not a substitute for remediation.

In addition, the research to support the development of national guidelines for carrying out partial or total evacuations of high-rise residential buildings and building design requirements is progressing. Independent experts will support the research that will underpin this work, and review the means of escape provisions in blocks of flats, including use of the “stay put” strategy and evacuation.

Emergency services

The Joint Emergency Services Interoperability Principles (JESIP) Joint Doctrine provides responders, at the scene and elsewhere, with a common way of working when responding to multi- agency incidents. Sir Martin recommended a number of amendments to the JESIP Joint Doctrine, including around communicating the declaration of a major incident.

The Emergency Services lead Chief Officers from JESIP have committed to addressing, in full, these recommendations in the review of the JESIP Joint Doctrine currently underway. This work is forecast to be completed in spring 2021.

Early actions and remediating historic risks:

Following the fire, the Government removed unsafe cladding products from the market and began dealing with historic defects. We banned combustible materials for use on new high-rise residential buildings and continue to work closely with local authorities, industry and regulators to identify existing buildings with dangerous cladding. Since then, we have continued to engage robustly with building owners, regulators and industry, to ensure the most dangerous forms of cladding are removed and replaced as soon as possible.

Building owners are responsible for building safety. But the Government recognises that funding is often a key barrier to remediation. That’s why we’re providing £1.6 billion to speed up the removal of unsafe cladding.

Despite COVID restrictions, we made it clear that these circumstances could not be allowed to impede progress on ACM remediation. Working closely with industry, we made good progress despite the many challenges we faced. We have set out a clear expectation that all building owners, across all sectors, must start ACM remediation works on site by the end of 2020.

There is still some way to go, but it is important to recognise that homes are being made safer. To date, 351 buildings (77 per cent of all identified high-rise residential and publicly owned buildings, including hotels and student accommodation), have already been or are in the process of being fully remediated. 148 social sector residential buildings – 95 per cent of that sector – have done the same. All remaining residential buildings now have a plan in place or have reported an intent to remediate.

Both myself and the Minister of State for Building Safety and Communities have personally met local leaders and the Fire Service to support them in taking action where progress is slow. Progress is reported through monthly data releases, and we have made clear that we will not rule out further measures in our mission to hold the owners of these buildings to account and keep residents safe in their homes.

Conclusion

In the year since the Phase 1 report was published, the Government has delivered demonstrable progress on all fronts and remained resolute in its commitment to deliver the recommendations. In relation to London we have used our powers to ensure that real change is happening. Through the funding we have provided the NFCC we have bolstered the national leadership that will help all services to make strategic and meaningful change – both in culture and leadership and in practical operational delivery. We have worked with industry, building owners, and regulators to ensure the most dangerous forms of cladding are removed and replaced as soon as possible. This work is not complete – we will continue to improve our services and the safety of buildings to ensure that the conditions that led to the tragedy at Grenfell Tower will no longer exist. The proposed legislative reforms will ensure there is absolute clarity on the regulatory framework, providing strong and comprehensive building safety so that residents can know their safety is assured.

Original parliamentary record

Appointment of Additional Grenfell Tower Inquiry Panel Member

Written Ministerial Statement House of Lords
Baroness Evans of Bowes Park · Conservative Answering body: Leader of the House of Lords
Parliamentary excerpt

My Rt Hon Friend the Prime Minister has made the following statement: The fire in Grenfell Tower on 14 June 2017 was an unimaginable tragedy that should never have happened. The Government set up the Grenfell Tower Inquiry to get to the truth about what happened and to deliver justice for victims, survivors, bereaved families and the wider community. Ensuring that such a terrible tragedy can never happen again remains a priority for this Government. In February this year, I announced my inten...

Recorded statement

Answering body: Leader of the House of Lords

My Rt Hon Friend the Prime Minister has made the following statement:

The fire in Grenfell Tower on 14 June 2017 was an unimaginable tragedy that should never have happened.

The Government set up the Grenfell Tower Inquiry to get to the truth about what happened and to deliver justice for victims, survivors, bereaved families and the wider community.

Ensuring that such a terrible tragedy can never happen again remains a priority for this Government.

In February this year, I announced my intention to appoint an additional panel member to the Grenfell Tower Inquiry. Section 7(1)(b) of the Inquiries Act 2005 allows me to appoint panel members to the Inquiry panel at any time during the Inquiry. In appointing a panel member, section 8(1)(a) and (b) of the Inquiries Act 2005 require me to ensure that the Inquiry panel (considered as a whole) has the necessary expertise to undertake the Inquiry, and to consider the need for balance (considered against the background of the terms of reference) in the composition of the panel.

Phase 2 of the Inquiry is the largest phase in terms of the number and range of issues to be considered, and given the diversity of issues, and the expertise already available to the Inquiry, I am pleased to appoint Ali Akbor OBE as the Inquiry’s third panel member.

Ali is currently the CEO of Unity Homes and Enterprise, a leading housing association supporting sustainable and diverse neighbourhoods in West Yorkshire. Prior to his role at Unity, Ali was finance director for the Community and Social Services Directorate at the City of Salford. In December 2019, he was awarded an OBE for services to the community in Leeds. His knowledge of, and professional expertise in social housing, local government and community engagement are highly relevant skills and experience which will add great value to the Inquiry panel.

I am confident that Ali’s appointment will ensure that the Inquiry panel has the diversity of skills and expertise necessary for the scope and complexity of issues to be addressed by Phase 2 of its work.

I wrote to the Chair of the Inquiry, Sir Martin Moore-Bick, on 12 October informing him of my decision and to seek his consent to the appointment in accordance with section 7(2)(b) of the Inquiries Act 2005. Sir Martin replied on 13 October consenting to the appointment.

Ali will read into the work of the Inquiry while he formally steps back from his role at Unity and will join the Inquiry panel on 2 November for the start of module 2 of its work. It is intended that Ali will sit for the duration of the Inquiry and, alongside his two fellow panel members, will be jointly responsible for the whole of the Inquiry's Phase 2 work.

Our exchange of letters can be found on gov.uk.

Original parliamentary record

Launching a review of the Police and Crime Commissioner model

Written Ministerial Statement House of Lords
Baroness Williams of Trafford · Conservative Answering body: Home Office
Parliamentary excerpt

My hon Friend the Minister of State for Crime, Policing and the Fire Service (Kit Malthouse) has today made the following Written Ministerial Statement:I wish to set out to the House details of a review into the role of Police and Crime Commissioners. The Government’s manifesto committed to strengthening the accountability of PCCs and expanding their role. Police and Crime Commissioners were introduced in 2012 to give the public a direct say over policing in their area. Since coming into post...

Recorded statement

Answering body: Home Office

My hon Friend the Minister of State for Crime, Policing and the Fire Service (Kit Malthouse) has today made the following Written Ministerial Statement:

I wish to set out to the House details of a review into the role of Police and Crime Commissioners.

The Government’s manifesto committed to strengthening the accountability of PCCs and expanding their role. Police and Crime Commissioners were introduced in 2012 to give the public a direct say over policing in their area. Since coming into post, they have brought real local accountability to policing and are working to give local communities a stronger voice.

After eight years it is right that we step back and consider how we can continue to evolve the PCC model. It is important that PCCs are strong, visible leaders in the fight against crime and have the legitimacy and tools to hold their police forces to account effectively.

To deliver this commitment, I am today announcing a two-part internal review into the role of PCCs.

Part one will commence in late July and report to the Home Secretary and myself by October 2020. It will be focussed on changes required to strengthen the model which, where possible, can be delivered ahead of the 2021 PCC elections. In particular, it will: consider how to strengthen the accountability, resilience, legitimacy and scrutiny mechanisms of the existing model to drive up standards; identify and share best practice across the sector; and examine the effectiveness of the relationship between PCCs and Chief Constables and the checks and balances currently in place.

We will also use part one of the review to help us map out our longer-term ambition for the expansion of the PCC role. In relation to fire, the Government is clear that further reform of fire and rescue services is required in order to respond to the recommendations from Phase 1 of the Grenfell Tower Inquiry and to build on the findings from Sir Tom Winsor’s State of Fire and Rescue Report, both of which demonstrate the clear challenges and improvements required in professionalism, people and governance. The review will consider further options and opportunities to strengthen fire governance and accountability, drawing on the lessons from the first cycle of fire governance transfers to PCCs.

The review will also be fully aligned with the Government’s commitment to expand the benefits of devolution across England through the Local Recovery and Devolution White Paper. Mayors of Combined Authorities should be powerful local figures with the ability to drive public safety, as well as economic growth and local recovery. We plan to develop the role of PCCs with that longer-term trajectory in mind, building on the models in London and Greater Manchester.

I would like to be clear that neither Part one or Part two of the review will consider a wholly new governance model for policing or examine the 43 police force model.

An Advisory Group will support part one of the review, comprising senior external stakeholders with expertise in the policing and fire sectors. It will also be important that the public’s views on those who represent them in policing are heard and the review team will seek to engage a sample of citizens and local and national victims’ groups as appropriate.

Part two of the review will commence after the 2021 elections and will allow us to consider further ways to strengthen and expand the role of PCCs, including the role PCCs play in tackling re-offending to help reduce crime. It will focus on longer-term reforms and the potential for wider efficiencies to be made within the system with a view to implementation ahead of the 2024 elections.

I will place a copy of the Terms of Reference for part one of the review in the Libraries of both Houses.

Original parliamentary record

Building Safety update

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:I would like to update Parliament on the Government’s progress in overhauling the building and fire safety system, as part of our unwavering commitment to ensuring that people, and the buildings they live in, are safe.Building safetyWe must never forget the seventy two people who lost their lives as a result of the ...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:

I would like to update Parliament on the Government’s progress in overhauling the building and fire safety system, as part of our unwavering commitment to ensuring that people, and the buildings they live in, are safe.

Building safety

We must never forget the seventy two people who lost their lives as a result of the Grenfell Tower tragedy. Countless lives were torn apart by that tragedy and we owe it to the deceased, the bereaved, the survivors, and the residents of all high-rise buildings to ensure that we do all we can to prevent a repeat of events like that fateful night occurring again.

We promised to overhaul the system and to establish a national building safety regulator at its heart. Today I am pleased to be making a significant step towards that fundamental reform by publishing the draft Building Safety Bill for pre-legislative scrutiny, before the final Bill is brought forward to Parliament.

The Bill will establish the regulator in the Health and Safety Executive (HSE) and give it significant powers to improve safety and performance across the built environment, especially in higher-risk buildings.

These reforms will improve safety and performance standards across all buildings. However, certain buildings warrant even closer oversight because the potential for significant consequences should a fire spread or the structure fail. It is right that we have a more stringent regime where the risk is deemed greatest, to protect the greatest number of people. Initially the scope of the more stringent regime will apply to multi-occupied residential buildings of 18 metres or more in height or more than six storeys, whichever is reached first. We have designed the new regime so its scope can be changed if the evidence base or operational experience suggest it should.

The Bill will provide a stronger framework to make sure those responsible for managing building safety risks in higher-risk buildings are held to account, with stronger enforcement powers and sanctions where those rules are not followed. It will also ensure that the residents of high-rise buildings have a stronger voice, alongside giving them better access to safety information about their building, clarifying their rights and providing recourse to raise safety concerns directly to the regulator.

The draft Bill applies to England only with the exception of the policies to require developers to belong to a New Homes Ombudsman scheme, strengthen the oversight of the construction products regulatory regime, and allow the Architects Registration Board (ARB) to monitor the competence of architects. Further detailed analysis of the territorial extent is provided in the Explanatory Notes.

Building safety financing

The Government is clear that it is unacceptable for leaseholders to have to worry about the cost of fixing historic safety defects in their buildings that they didn’t cause.

The draft Bill proposes a new ‘building safety charge’, which will give leaseholders greater transparency around costs incurred in maintaining a safe building. We want these to be fair and proportionate, which is why I have deliberately included numerous powers in the Bill that will enable us to limit the building safety costs that can be re-charged to leaseholders.

This is a topic that we are particularly committed to developing further throughout the process of scrutiny and as the Bill is finalised for introduction. I have asked Michael Wade, senior adviser to the Cabinet Office, to accelerate this work with leaseholders and the financial sector. We must remove barriers to fixing historic defects and identify financing solutions that protect leaseholders from unaffordable costs; but we must also ensure that the bill does not fall on tax payers. We will update on any further measures required before the final Bill is introduced to Parliament.

Establishing the Building Safety Regulator

As I announced in January, the HSE is establishing the regulator in shadow form, and I am today announcing that I have set aside £16.4 million in this financial year for HSE to recruit the people and develop the capabilities that will enable the regulator to hit the ground running once its powers come into effect.

HSE has a strong track record of improving safety and fostering a safety-first culture within the construction and major hazards industries, and will draw on years of experience to deliver results quickly and effectively. As shadow regulator, HSE is playing an increasingly important role in the Government’s Building Safety Programme: it is supporting work on how to identify higher-risk buildings; supporting work by the National Fire Chiefs Council to assess the fire risk in every high-rise residential building by end 2021; and supporting work with early adopters in the construction industry, social landlords and local government to trial the new regime, and to promote culture change across the industry. I am today announcing that HSE will also take over as chair of the Joint Regulators’ Group, which advises the Government on ways to strengthen the regulatory regime; and will take over the Independent Expert Advisory Panel, which advises the Government on fire safety in high-rise residential buildings.

Over coming months, the shadow regulator will engage with and advise residents, building owners, the construction industry and other regulators on how the new system will operate, what it will mean for them, and what they should do now to make their buildings safe and prepare for the new regime. In the Autumn, we will kick off work to appoint the first national Chief Inspector of Buildings, who will lead the new regulator.

We, and the public, expect industry to manage building safety risks now and prepare to fulfil their duties when this new regime comes into effect. The public expects and demands industry to implement these reforms with conviction and speed. The new Building Safety Regulator stands ready to work hand in hand with industry to bring about a culture change that prioritises residents and their safety.

Fire safety reforms

The Home Office is also today publishing a Fire Safety Consultation, which sets out proposals to: strengthen the Regulatory Reform (Fire Safety) Order 2005 – the Fire Safety Order – and improve compliance for all regulated buildings; implement the Grenfell Tower Inquiry Phase 1 report recommendations for multi-occupied residential buildings which require a change in law; and, seeks views on the effectiveness of the arrangements for consultation and information sharing between building control bodies and fire and rescue authorities in relation to building work. This is alongside a commitment to overhaul the Fire Safety Order’s supporting guidance.

Proposals for multi-occupied residential buildings, mostly high-rise buildings, include prescribing in law the frequency of checks of fire doors; that Responsible Persons (RPs) carry out inspections of other key fire-fighting equipment, not just lifts designed to be used by firefighters; and that RPs provide information to residents including in relation to fire safety (including evacuation and other specific information) in an accessible format.

Our proposals go beyond the Grenfell Tower Inquiry’s recommendations in several areas. In others, our proposals prioritise residents’ safety in a way that is practical, proportionate and effective to the risks the Inquiry has identified. The Government wants to listen to the views of those who have experience of these matters, including those who have been personally affected by the Grenfell Tower tragedy. The proposals set out in the Home Office consultation will further deliver the Government’s objective to improve building and fire safety in all regulated premises where people live, stay or work.

Construction products

The Bill also enables us to progress our commitment to radically strengthen oversight of the regulatory regime for construction products. The bill will make sure a wider range of construction products are subject to strengthened safety regulations. It will also strengthen the powers available to the Government, paving the way to create a new national regulatory function that will have oversight of the construction products regulation. The Government is developing options for how this new national regulatory function could be implemented.

Other housing measures

The draft Bill also contains measures to protect the rights of all new build homebuyers by requiring developers to belong to the New Homes Ombudsman. It also includes new measures that will make access to redress swifter and more effective for all social housing residents.

Pre-legislative scrutiny

These are extensive reforms that it is incumbent on us all to get right. The Building Safety Bill is a large and complex piece of legislation, reflecting the scale of the reforms needed. In this spirit, I am publishing the Bill in draft form to ensure it receives the due and proper consideration it deserves through pre-legislative scrutiny from Parliament, from industry, from regulatory bodies, and from residents. I want to thank those that have helped shape the legislation so far, including those who contributed to the ‘Building a Safer Future’ consultation and who have engaged in various forums with my department. I now encourage colleagues from across both Houses to engage wholeheartedly in strengthening these proposals so that together we can further improve the legislation and deliver greater safety for residents.

I will deposit copies of the draft Building Safety Bill, Delegated Powers Memorandum and Impact Assessment in the libraries of both Houses. A copy of the full Fire Safety Consultation and its Impact Assessment will also be deposited in the libraries of both Houses.

Original parliamentary record

Grenfell Update

Written Ministerial Statement House of Lords
Lord Greenhalgh · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:On 30 October 2019 Phase 1 of the Grenfell Tower Inquiry, which focused on how the fire started and spread and the emergency response, concluded with the publication of the Phase 1 report. In January 2020 the Government reaffirmed the acceptance, first given on the day of publication, to accept in principle, all the...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Rt Hon. Friend, the Secretary of State for the Ministry of Housing, Communities and Local Government (Robert Jenrick) has today made the following Written Ministerial Statement:

On 30 October 2019 Phase 1 of the Grenfell Tower Inquiry, which focused on how the fire started and spread and the emergency response, concluded with the publication of the Phase 1 report. In January 2020 the Government reaffirmed the acceptance, first given on the day of publication, to accept in principle, all the recommendations that Sir Martin Moore-Bick made for central government in that report.

Six months on from the publication of the Government’s response to the Phase 1 report, I would like to update Parliament on the Government’s progress at turning our commitments into real and lasting change to building and fire safety.

The Grenfell fire was an unimaginable tragedy that must never be allowed to happen again. Even in these unprecedented times, the Government’s commitment to implementing the Inquiry’s recommendations, as a priority, remains unchanged. As does the Government’s commitment to ensuring those most affected, the bereaved and survivors – who have displayed such remarkable courage, resilience and dignity – continue to be engaged in discussions about policy development.

Ban on the use of combustible materials

The Inquiry’s report was clear that the use of Aluminium Composite Material (ACM) rainscreen cladding and combustible insulation on the exterior of the Tower was the defining factor in the rapid spread of the fire. The Government introduced regulations in December 2018 that banned the use of combustible materials in and on the external walls of specific types of new high-rise buildings. A public consultation was held between January and May 2020, to further explore and refine the scope of that ban – including a proposal to ban the use of ACM with unmodified polyethylene core and similar materials on all buildings in England. We are analysing feedback and will be publishing a response in due course.

Remediation

Since the Grenfell Tower fire, the Ministry of Housing, Communities and Local Government (MHCLG) and the Home Office (HO) have identified over 450 buildings with unsafe ACM cladding, and we have worked with local authorities and fire and rescue authorities to ensure that appropriate interim safety measures are in place, while these buildings undergo remediation.

In March this year the Government announced that it will provide £1 billion to fund the removal and replacement of unsafe non-ACM cladding systems. This is in addition to the £600 million which Government has made available for remediation of the highest risk ACM cladding. The prospectus for this fund was launched last month and sets out the buildings and non-ACM cladding systems that are eligible for funding and registration is now open for potential applicants, in advance of the full application process opening by the end of July 2020. More information on the Fund Prospectus can be found here: https://www.gov.uk/guidance/remediation-of-non-acm-buildings#prospectus---outlining-eligibility-for-the-fund.

This fund will meet the cost of remediating unsafe non-ACM cladding systems where building owners (or other entities legally responsible for making buildings safe) are unable to do so. Government are also providing additional, specialist project management capability to building owners or managing agents to speed up the development and implementation of building plans.

The Fire Protection Board

The Government has also established a Fire Protection Board, chaired by the National Fire Chiefs Council (NFCC), to provide greater assurance to central government of Fire and Rescue Service protection activity. The Board is leading a Building Risk Review Programme, supported by government funding to ensure that all high-rise residential buildings of 18m or above are inspected or reviewed by the end of 2021. We are also using a proportion of the additional £20m secured for fire and rescue services in the recent Budget to further support an uplift in protection capability.

Stay Put

At the end of last year, a joint HO and MHCLG steering group was set up to support a technical review of stay put. There are three strands to this work: an evidence review, assessing academic evidence on methods of evacuation; operational research to test evacuation strategies; and building design research. The first stage of this work has been commissioned and is underway whilst preliminary work is being carried out on the other strands.

Building safety

At the heart of the Government’s radical reforms to building safety is the new Building Safety Regulator, which we are establishing within the Health and Safety Executive. The Government set out plans in our response to the ‘Building a Safer Future’ consultation for the biggest change in building safety for a generation.

The new regulator will be responsible for implementing and enforcing a more stringent regulatory regime for higher risk buildings, as well as providing wider and stronger oversight of safety and performance across all buildings and increasing the competence of those working on building safety. This work complements the establishment of a new construction products regulatory role to strengthen national oversight and effectively enforce the new regulatory regime.

The Government will soon be publishing the draft Building Safety Bill for scrutiny before it is introduced in Parliament. This Bill will put in place this new and enhanced regulatory regimes for building safety and construction products, and ensure residents have a stronger voice.

In April, the Government published a workplan detailing the next steps for the wider review of Approved Document B, following the technical review that was started in December 2018. Research will be carried out in areas such as means of escape, compartmentation and toxicity. This work will build on the changes we have published in an update to Approved Document B last month, so that sprinklers and wayfinding signage will be provided in all new blocks of flats above 11 metres. The Government is also working with the NFCC on further tests of evacuation with a view to including guidance on provision of these systems in a later update to Approved Document B.

Fire Safety Bill

The Inquiry’s Phase 1 report also called for new duties on building owners and managers to share technical information with fire and rescue services and undertake regular inspections of flat entrance doors. It is our intention to take forward these recommendations for existing buildings under the Regulatory Reform (Fire Safety) Order 2005 underpinned by the changes being introduced through the Fire Safety Bill.

The Fire Safety Bill, which was introduced in March and received cross-party support, clarifies that the scope of the Fire Safety Order covers external walls (including cladding and balconies) and flat entrance doors in multi-occupied residential buildings. It provides a firm foundation upon which to bring forward secondary legislation to implement the recommendations that require further changes to the law. The Bill is a significant further step to ensure better identification and management of fire safety risks in such buildings.

It is important that the Government’s response to the Inquiry’s recommendations has the support of those with experience in these matters, and those most affected by them. To ensure their views inform our response, a public consultation will be issued soon setting out the Government’s proposed approach to the remaining recommendations that call for legislative change.

Fire and Rescue Services

Many of the recommendations within the Inquiry’s Phase 1 report were directed at non-Government organisations that are equally committed to the reforms. The report was clear that the London Fire Brigade (LFB) must learn and change to restore public confidence. Our request for regular progress reports from the LFB setting out how they are translating the recommendations into action are a key part of retaining focus and momentum on the need for change.

There remains much to do, but the HO is already seeing a commitment to revised policy and procedures backed up by the use of better equipment and technology to support high-rise fire fighting and fire fighting in London more broadly. The pandemic has created many challenges, but it has not affected the LFB’s commitment to implementing the Inquiry’s Phase 1 recommendations.

It is important that the lessons from Grenfell are learned beyond London. This is why the NFCC is working to ensure that the Phase 1 recommendations are implemented across all fire and rescue services. The HO is working closely with the NFCC on an improvement plan to help it drive real change across the sector.

In the three years since the Grenfell Tower fire, the Government has remained steadfast in its commitment to driving forward both cultural and legislative change so that no such tragedy can ever be allowed to happen again. Through implementation of the reforms highlighted in this statement, and wider work of Government and our stakeholders, we will move from the conditions that allowed a tragedy like the fire at Grenfell Tower to occur almost three years ago, to a system which ensures developers and building owners demonstrate greater responsibility for the safety of residents and which allows local authorities and fire and rescue authorities to enforce this. The Government is firmly committed to ensuring all residents are safe in their homes, now and in the future.

Original parliamentary record

The Grenfell Tower Inquiry: Publication of its Phase 1 Report

Written Ministerial Statement House of Lords
Baroness Evans of Bowes Park · Conservative Answering body: Cabinet Office
Parliamentary excerpt

My Rt Hon. Friend the Prime Minister has made the following statement to the House of Commons:This morning, Sir Martin Moore-Bick has published the phase 1 report of the independent Grenfell Tower Inquiry. A copy of the report has been laid before each House of Parliament. This is a difficult day for all those who lost their loved ones, homes and possessions in that unimaginable tragedy, and found their lives devastated. Our first thoughts should be with them.The report is a very substantial ...

Recorded statement

Answering body: Cabinet Office

My Rt Hon. Friend the Prime Minister has made the following statement to the House of Commons:

This morning, Sir Martin Moore-Bick has published the phase 1 report of the independent Grenfell Tower Inquiry. A copy of the report has been laid before each House of Parliament. This is a difficult day for all those who lost their loved ones, homes and possessions in that unimaginable tragedy, and found their lives devastated. Our first thoughts should be with them.

The report is a very substantial document, which includes a detailed description of the events of the night of 14 June 2017, as well as the Chair’s findings about the nature of the building, the origins of the fire, it’s subsequent development, the response of the London Fire Brigade and the steps taken by the other emergency services. It also contains a number of recommendations that my Government will consider with the utmost urgency. The bereaved, survivors and local residents have waited a long time for the Inquiry’s report, and it is right that the report should be debated in parliament on the day of its publication. But given the substantial nature of the report, and the limited time that parliamentarians have had to read the text, I am committed to holding a further debate at the earliest opportunity once Members have had an opportunity to properly scrutinise its contents. I hope that the bereaved and survivors can draw at least some solace from the rigorous, detailed nature of Sir Martin’s report.

Original parliamentary record

Names of Additional Grenfell Tower Inquiry Panel Members

Written Ministerial Statement House of Lords
Baroness Evans of Bowes Park · Conservative Answering body: Leader of the House of Lords
Parliamentary excerpt

My Rt Hon. Friend the Prime Minister has made the following statement to the House of Commons:The fire in Grenfell Tower on 14 June 2017 was an unimaginable tragedy that should never have happened. The Government set up the Grenfell Tower Inquiry to get to the truth about what happened, deliver justice for victims, survivors, bereaved families and the wider community, and to ensure that such a terrible tragedy could never happen again.Section 7 (1)(b) of the Inquiries Act 2005 allows me to ap...

Recorded statement

Answering body: Leader of the House of Lords

My Rt Hon. Friend the Prime Minister has made the following statement to the House of Commons:

The fire in Grenfell Tower on 14 June 2017 was an unimaginable tragedy that should never have happened. The Government set up the Grenfell Tower Inquiry to get to the truth about what happened, deliver justice for victims, survivors, bereaved families and the wider community, and to ensure that such a terrible tragedy could never happen again.

Section 7 (1)(b) of the Inquiries Act 2005 allows me to appoint panel members to the Inquiry panel at any time during the Inquiry. I have recently announced that Professor Nabeel Hamdi and Thouria Istephan will be appointed to the Inquiry panel for phase 2 of the Inquiry’s work.

Professor Nabeel Hamdi is a widely accomplished academic with an international reputation in housing and participatory design and planning. Thouria Istephan is an experienced and highly respected architect with a professional focus on health and safety. She is a partner at Foster + Partners and has a range of skills and experience directly relevant to the issues that the Inquiry will be investigating in phase 2 of its work.

Given the extent of the tragic circumstances surrounding the fire, we should not be surprised by the scale and breadth of issues to be investigated that have emerged from the Inquiry’s work. Phase 2 of the Inquiry will be the largest phase in terms of the number and range of issues to be considered and I am confident that these appointments will ensure that the Inquiry panel has the diversity of skills and expertise necessary for the scope and complexity of issues to be addressed by phase 2 of the Inquiry’s work.

I wrote to the Chair of the Inquiry, Sir Martin Moore-Bick, before recess informing him of my decision and to seek his consent to the appointments in accordance with section 7(2)(b) of the Inquiries Act 2005. Sir Martin replied on 29 May 2019 consenting to the appointment. Our exchange of letters can be found on gov.uk: https://www.gov.uk/government/publications/names-of-grenfell-tower-inquiry-panel-members-announced-30-may-2019.

Original parliamentary record

Grenfell update

Written Ministerial Statement House of Lords
Lord Bourne of Aberystwyth · Conservative Answering body: Ministry of Housing, Communities and Local Government
Parliamentary excerpt

My Rt Hon. Friend, the Secretary of State for Housing, Communities and Local Government (James Brokenshire), has today made the following Written Ministerial Statement.Honourable Members will be aware of the on-going Grenfell Tower Inquiry and the harrowing accounts from all those affected by the Grenfell Tower fire. I want to provide the House with an update on the Government’s on-going work in response to the tragedy.RecoveryGovernment has committed over £80 million to support the bereaved,...

Recorded statement

Answering body: Ministry of Housing, Communities and Local Government

My Rt Hon. Friend, the Secretary of State for Housing, Communities and Local Government (James Brokenshire), has today made the following Written Ministerial Statement.

Honourable Members will be aware of the on-going Grenfell Tower Inquiry and the harrowing accounts from all those affected by the Grenfell Tower fire. I want to provide the House with an update on the Government’s on-going work in response to the tragedy.

Recovery

Government has committed over £80 million to support the bereaved, survivors and the community following the Grenfell Tower fire. This includes rehousing costs, new mental health services, investment in the Lancaster West Estate, and a community space.

NHS England has also announced that it will provide up to £50 million to fund long term mental and physical health checks and treatment for those affected by the Grenfell Tower fire.

Grenfell Tower Site

I would like to update the House on progress towards the long term future of the site. The Government has always been committed to working with the community to create a fitting memorial, with the Prime Minister giving her personal commitment that the bereaved, survivors and community will decide what happens to the long term future of the Grenfell Tower site.

As part of this, I made a commitment in August 2018 that the Government would take responsibility for the Grenfell Tower. I would like to update the House on the steps I have taken to put this announcement into effect.

I am pleased to inform the House that the Government will meet the on-going costs of keeping the Tower site safe and secure. This will deliver on my earlier promise to the bereaved, survivors and community that the Royal Borough of Kensington and Chelsea (RBKC) will take no role in making decisions regarding the Grenfell Tower site. Once ownership transfers, Government will make operational decisions, such as those on safety, security and access, until the long term future has been determined by the community.

As we work towards responsibility transferring to Government, I want to reassure the House and the community that the independent Site Management team continue to closely monitor and inspect the Tower and are responsible for ensuring that it is safe and secure.

I recognise that sensitive management of the Tower site, working towards a fitting memorial, is of paramount importance to the bereaved, survivors and the local community. The arrangements that I am putting in place will ensure that Grenfell Tower will continue to be managed effectively and sensitively.

In taking responsibility for Grenfell Tower, I will become responsible for decisions about the Tower site. I would, therefore, like to reassure the House and the community about how I intend to approach decision-making: The principles I commit to include that:

most importantly, the community will continue to be engaged at each step along the way to a lasting memorial;

the health and safety of those living, working and at the school in the local area, as well those working on the site, will continue to take priority;

decisions that I take about the Tower site will be evidence based, informed by the advice of public authorities and technical experts; and that,

I will consult the Police and the Grenfell Tower Inquiry to ensure that decision-making does not interfere with the path to justice.

The community-led Grenfell Tower Memorial Commission will develop a proposal for what happens to the Grenfell Tower site in the future, and will decide how the memorial site will be owned and managed in the long term. The Minister for Grenfell Victims, the Rt Hon Nick Hurd MP, continues to meet with members of the bereaved, survivors and wider community to discuss the process and the role of community representatives.

Environmental Monitoring

On 26 October 2018 I announced additional environmental checks will be carried out in and around the Grenfell Tower site to reassure the bereaved, survivors and wider community that any environmental risks to public health will be fully assessed and appropriate action taken.

This is an issue that I take very seriously, and my officials have been working closely with RBKC, the Department of Environment, Food and Rural Affairs, the Environment Agency, NHS England and Public Health England to plan further environmental sampling of the site, including comprehensive soil analysis to check for any signs of contamination.

The new soil testing programme will take place alongside existing air quality monitoring which has been in place since the fire. So far, the monitoring has consistently shown the risk to people’s health from air pollution around the Grenfell Tower site to be low. Public Health England will continue to monitor this and publish the results on a weekly basis - alongside an explanation of the data in terms of potential impacts on health, at the following weblink: www.gov.uk/government/publications/environmental-monitoring-following-the-grenfell-tower-fire.

An expert multi-agency group which includes the Environment Agency, Public Health England, RBKC and NHS England has been set up to make sure soil surveying around Grenfell Tower is comprehensive and that analysis will be provided to the public. The Minister for Grenfell Victims, the Rt Hon Nick Hurd MP recently chaired the first meeting of this group. As a result we have started procuring the relevant expertise and will appoint independent environmental specialists from a network of leading experts. Their work will be overseen by the multi-agency group.

Once selected, the specialists will proactively engage the community on the design and implementation of the testing process. This will take place in the new year.

Both the Government and the NHS share a resolute commitment to support all those affected by the fire. The NHS has run health drop-in events within the local area for those who are concerned about their health.

The Minister for Grenfell Victims, the Rt Hon Nick Hurd MP, and I are also committed to engaging local residents with the investigation process from start to finish and consultation workshops will begin in January, to inform the scope and locations of the main site investigation and sampling.

Rehousing

The Government remains committed to ensuring all survivors are permanently rehoused as quickly as possible.

Since my last update to the House in July, based on data provided by RBKC as of 26 November, 44 more households have moved into permanent accommodation bringing the total to 149; and the number of households living in hotels has reduced by 23 to 15. Out of 203 households, there are currently 26 households living in good quality temporary accommodation, 12 in serviced apartments and 1 staying with family and friends. Every household has had an offer of permanent or temporary accommodation, and 201 households (99%) have accepted an offer. 194 of these households have accepted permanent homes, of which 149 have now moved in.

The Royal Borough of Kensington and Chelsea Council continues its efforts to rehouse those who lost their homes in the fire, and improved progress has been made. Whilst I recognise the complexities involved, the overall pace of rehousing has been too slow, and there remains a small number of households in hotels as we approach 18 months after the fire. I expect the Council to do everything possible to speed up the rehousing process and ensure that the remaining survivors are permanently rehoused as quickly as possible.

It is important that the bereaved, survivors and wider community continue to be supported. My department will continue to work closely with RBKC to this end. I would like to express my thanks to all those involved in supporting the survivors throughout this difficult process.

Building Safety

As well as the work set out above that the Government has done with its partners in respect of the recovery, we are determined to learn the lessons from the Grenfell Tower fire and bring about a fundamental change to ensure that residents of high-rise buildings are safe and feel safe. That is why we have set in train a programme of work to deliver that change by addressing the issues raised by Dame Judith Hackitt in her Independent review of Building Regulations and Fire Safety.

Ban on the use of combustible materials

We recognised the strength of feeling on combustible cladding and having consulted, announced a clear ban on the use of combustible materials on the external walls of new buildings over 18m containing flats, as well as new hospitals, residential care premises, dormitories in boarding schools and student accommodation over 18m. Today regulations have been laid to give legal effect to the ban. As part of wider work on fire safety across government, I will work with the Education Secretary to join up our reviews of fire safety guidance. I also welcome the Department for Education’s commitment to ensuring schools over 18m built as part of their centrally delivered build programmes will not use combustible materials, in line with the terms of the ban, in the external wall.

Remediation

As of 31 October 2018, 289 private sector high-rise residential buildings have been identified as having unsafe Aluminium Composite Material (ACM) cladding. We have made good progress in getting remediation completed (in 19 cases); started (in 21 cases); and with plans in place for 98 buildings. These numbers continue to increase, but we are taking decisive action to deal with the remaining buildings where owners are not fulfilling their responsibility to remediate unsafe ACM cladding. That is why, as part of our strong commitment to ensuring that residents of high rise residential buildings are safe and that they feel safe, I am announcing measures to support local authorities to take action where remediation plans are not clear.

I am laying an addendum to the Housing Health and Safety Rating System operating guidance. This addendum provides specific guidance on the assessment of high-rise residential buildings with unsafe cladding. This will help local authorities to make robust hazard assessments and boost their ability to take decisive enforcement action.

Alongside this the Joint Inspection Team, hosted by the Local Government Association, will provide support to local authorities in their assessments and give them confidence to take enforcement action.

I am also writing to local authorities with buildings where the owner refuses to remediate unsafe ACM cladding, to offer them our full support to take enforcement action. This will include financial support where this is necessary for the local authority to carry out emergency remedial work. Where financial support is provided, local authorities will recover the costs from the building owner.

I am determined that building owners will not evade their responsibilities and that local authorities will have all the support they need to ensure that all high-rise buildings with unsafe ACM cladding are made permanently safe for the people who live in them.

Original parliamentary record