Recommendation 1
IOPC recommendationThere was a lengthy delay in resourcing a request for a welfare check that was graded Grade 2 (expected response time 1 hour). There were resourcing issues that led to this delay, the incident log provided very little information about these. Sussex Police should remind control room staff of the importance of including more detailed information on all incident logs that are awaiting, or have issues with, resourcing and to include this in training.
Do you accept the recommendation?
Yes
Accepted action:
Email sent to staff reminding them of the need for adequate information to be placed on the CAD. Contact handler guidance updated re: use of Shift F8 Function in Current system (STORM MA) to ensure CAD is updated- Manual Shift F8 key stroke, to take a snapshot/timestamp of resource availability which is added to the CAD remarks, this can be carried out at any given point, until a resource is assigned to an incident. Use of F8 automatically populates the CAD.
During the 2 week Controllers course this is covered under the additional STORM commands that they are taught. The F8 function is trained and practised alongside a discussion about when to use it
Use of this function is included in current training Material and how use of code NRA (no resources available) is not appropriate
Resourcing Deployment document and it refers to point number one below (page 12)
An extract from the Core Storm MA (current System 2019-2020) use manual which shows how we filter remarks on Storm. (point 4)
Domestic abuse grading changed as of 16/12/2019 and as such will ensure correct grading for Grade 3 DA (previously all DA was graded 2 even if would fall as Grade 3) and effective management within FCCCD for Grade 2 incidents which require resourcing, or queue management by Supervision in FCCCD. This will be completed and reviewed by the Corporate development team and forms part of the on-going work