8

Flangeway gap standards

Potters Bar Investigation · Formal Inquiry: Potters Bar derailment of 10 May 2002 — Final Report (RSSB FI2013/F) · Issued 18 March 2005

Government responseNot tracked (historical inquiry)

DeliveryNo statement from the addressee found

Recommendation, verbatim from the inquiry

●Inquiry recommendation, 5.9.1, 5.9.2 and 5.9.4

Railway Group Standard GI/RT7004 and all Network Rail technical documents covering installation, inspection and maintenance of point flangeway gaps, including the opening at the switch toes, should be reviewed, and, where necessary, modified, in order to: • Use consistent terminology. • Remove ambiguities. • Be consistent with the dimensions contained in RT/E/C/11772. • Specify the depth and longitudinal position at which the flangeway gap dimensions are to be measured.

Potters Bar Investigation, Formal Inquiry: Potters Bar derailment of 10 May 2002 — Final Report (RSSB FI2013/F) · 18 Mar 2005 Source PDF, page 150 →

Government response

●No formal government response recorded

The Index has not yet recorded a verbatim government response to this recommendation.

Delivery

No statement on delivery from the addressee has been found in the sources searched. This is separate from the response above.

How this page is built

The recommendation and the government responses are verbatim from primary documents. Delivery statements and other bodies' findings are shown in their own words, each with its source. The summary is written by this site and labelled as such. The Index does not paraphrase sources or characterise intent; it records what has been published.