L7 Accepted in Part

Standards Code Responsibility

Leveson Inquiry · An Inquiry into the Culture, Practices and Ethics of the Press · Issued 29 November 2012 · Addressed to: Press

Source — verbatim from the inquiry

Inquiry recommendation

The standards code must ultimately be the responsibility of, and adopted by, the Board, advised by a Code Committee which may comprise both independent members of the Board and serving editors.

Leveson Inquiry, An Inquiry into the Culture, Practices and Ethics of the Press · 29 Nov 2012 Source PDF →

Published evidence summary

Publicly available evidence relating to this recommendation:

- The Prime Minister stated on 29 November 2012 that he accepted the principle of a standards code (Oral Statement to Parliament, Prime Minister's Office, 29 November 2012).
- IPSO operates under the Editors' Code of Practice, maintained by the Editors' Code of Practice Committee. The IPSO board has ultimate responsibility for adopting the code (IPSO Editors' Code of Practice, accessed March 2026).
- The Editors' Code Committee includes serving editors alongside independent members, which Leveson permitted for the advisory code committee but not for the board itself.
- IMPRESS operates its own Standards Code, over which its board has full responsibility (IMPRESS, Our Regulatory Scheme, accessed March 2026).

Response — verbatim from government

UK Government

The Prime Minister stated on 29 November 2012 that he accepted "the principles that Lord Justice Leveson has laid out" for independent self-regulation, including "an independent board, a standards code, an arbitration service and the power to demand up-front, prominent apologies and impose million-pound fines." However, he rejected statutory underpinning, expressing "serious concerns and misgivings" about crossing "the Rubicon of writing elements of press regulation into the law of the land." The Royal Charter on Self-Regulation of the Press was granted on 30 October 2013, establishing the Press Recognition Panel as the recognition body. IPSO was established in September 2014 but has not sought Royal Charter recognition. IMPRESS was recognised by the PRP in October 2016. Source: https://www.gov.uk/government/speeches/david-cameron-statement-in-response-to-the-leveson-inquiry-report

UK Government · 29 Nov 2012 Written response →

Evidence trail — what's actually happened since

  • 27 Feb 2025 · IPSO IPSO has an Editors' Code of Practice Committee that maintains the code, with the Board having ultimate responsibility. The code is regularly reviewed and updated. View source → Good Progress

Each entry above links to a primary source — gov.uk written statement, consultation response document, or inspection report. The Index does not characterise government intent; it tracks what has been published.

How this page is built

Source and Response are verbatim from primary documents. The Evidence trail records published activity since — written statements, consultation outcomes, inspection findings, parliamentary references. The Index does not paraphrase or characterise intent; it tracks what has been published. Where the evidence is the absence of action (a missed deadline, a slipped timetable), that absence is documented from primary sources rather than inferred.

This recommendation's data is verified periodically against primary sources. The Index is monitored for staleness weekly.