Anthony Ponting
The coroner's concerns
The office of Rail Regulation report dated 13 August 2013 revealed several matters which although in no way responsible for this death could cause a potential risk to other users namely:-
(i) reduced sighting line caused by track side vegetation growth for pedestrians crossing from the upside to up trains and on the downside for both up and down trains at the S.H.I sign
(ii) the S.H.I boards should have been positioned 3 metres from the line.
(iii) | Tripping hazards on the crossing surface
The coroner's words, from "Coroner's concerns" of the report.
The coroner noted potential risks to railway crossing users due to reduced sighting lines from trackside vegetation, incorrectly positioned S.H.I boards, and tripping hazards on the crossing surface.
Responses 1 organisation
Every organisation the report was sent to has responded.
Days after the report of 8 July 2014, by the date on each organisation's first response. The dashed line is the deadline, 2 September 2014.
- Network Rail 45 days · 22 Aug
22 Aug 2014Network Rail
Dated 22 August 2014
Summary written by this site (AI-generated).Show the full text (596 words, the response's own words)
NetworkRail January 2014 and 26'h June 2014 where sighting line was deemed to be satisfactory. The next inspection of the crossing is scheduled to take place in the first week of December 2014, Concern 5(i) regarding the SLL signs has been addressed. On 8lh August 2014, the SLL sign on the on the down line was moved from 4.9 meters to 3 meters as recommended in your report. The SLL sign on up side remains at 3.4 meters from the track_ There is some troughing at the 3 meter point which makes this sign more difficult to move but the current location of the sign is appropriate and fit for purpose. As we understand it the ORR report focussed on the inadequacy of the SLL sign on the down line_ The signage will continue to be assessed as part of the routine inspections, the next of which is scheduled for the first week of December 2014. Concern 5(iii) has been addressed. In early March 2014 and as part of more extensive track works in the area, the surface system was completely renewed in modern rubber panels free of tripping hazards Again the surface is checked for condition at each six-monthly inspection regime, the next one being in the first week of December 2014_ would take this opportunity to highlight Network Rail's commitment to safety. It is a core Network Rail value and we are committed to making sure everyone gets home safely be it employees, contractors or members of the public. We have invested much time, money and effort into reducing the risks inherent in level crossings and our work over the past four years has reduced that risk by 31%. This includes closures, improved engineering risk controls and targeted action to influence user behaviour and we will continue our work to improve safety at level crossings having been entrusted with significant funds over the next five years to do so_ hope that the response provides you with adequate information and assurance that the issues you identified are taken seriously and have been addressed. If you would Iike any further clarification, please do not hesitate to contact me. sincerely Mark Carne Chief Executive the the every day Yours
The report
Read the full report478 words
Full text of the report. Original PDF ↗
REGULATION 28: REPORT TO PREVENT FUTURE DEATHS (1)
REGULATION 28 REPORT TO PREVENT FUTURE DEATHS THIS REPORT IS BEING SENT TO:
The Chief Executive, Network Rail, Kings Place, 90 York Way,
London Ni 9AG 1 | CORONER
| am Michael Richard ROSE, Senior Coroner for the West Somerset area
2 | CORONER’S LEGAL POWERS
| make this report under paragraph 7, Schedule 5, of the Coroners and Justice Act 2009 and regulations 28 and 29 of the Coroners
(Investigations) Regulations 2013.
3 | INVESTIGATION and INQUEST
On the 5 June 2014 | held an Inquest before a Jury into the death of Antony Shane Ponting, a 34 year old man who died from Extensive
Multiple Traumatic injuries. 4 | CIRCUMSTANCES OF THE DEATHS
The deceased was killed when using an authorised pedestrian crossing over the Bristol to Taunton railway line near Springfield Road, Highbridge,
Somerset on the 11 July 2013. The jury returned a verdict of “Accidental
ee
Death” but found the deceased’s failure to observe the approaching train was influenced by the considerable amount of morphine (otherwise heroin) the deceased had in his blood.
i
5. | CORONER’S CONCERNS
The office of Rail Regulation report dated 13 August 2013 revealed
several matters which although in no way responsible for this death could
cause a potential risk to other users namely:-
(i) reduced sighting line caused by track side vegetation growth for pedestrians crossing from the upside to up trains and on the downside for both up and down trains at the S.H.I sign
(ii) the S.H.I boards should have been positioned 3 metres from the
line.
(iii) | Tripping hazards on the crossing surface
6 | ACTION SHOULD BE TAKEN
Although the vegetation was cut back shortly after this accident, the
matters revealed in 5(ii) and (iii) should be attended to if not already dealt
with.
AND in future items 5(i) and (iii) looked at regular intervals
¢ | YOUR RESPONSE
You are under a duty to respond to this report within 56 days of the date of this report.
Your response must contain details of action taken or proposed to be taken, setting out the timetable for action. Otherwise you must explain
why no action is proposed. ee
8 | COPIES and PUBLICATION | have sent a copy of my report to the Chief Coroner .
| am also under a duty to send the Chief Coroner a copy of your response.
The Chief Coroner may publish either or both in a complete or redacted or summary form. He may send a copy of this report to any person who he believes may find it useful or of interest. You may make representations to me, the coroner, at the time of your response, about the release or the publication of your response by the Chief Coroner.
9 | DATESJuly 2014
en
SIGNED BY CORONER eee |
Source: judiciary.uk.
Contains public sector information licensed under the Open Government Licence v3.0.