Source · Prevention of Future Deaths

Matthew Hatfield

Ref: 2018-0231-wp26293 Date: 18 Jul 2018 Coroner: Louise Hunt Area: Birmingham 2 responses identified · 2 indexed addressees View PDF

AI-generated concerns summaryThe coroner raises concerns about soldiers' clarity regarding the "Prove The Gun drill" and the Range Conducting Officer's up-to-date knowledge of tank status. The report also notes the need for improved risk assessments during gun design, actively considering drills.

Date 18 Jul 2018
56-day deadline 12 Sep 2018 stated in the report
Responses identified 2 of 2
Service Personnel related deaths

Coroner's concerns

AI summary
The coroner raises concerns about soldiers' clarity regarding the "Prove The Gun drill" and the Range Conducting Officer's up-to-date knowledge of tank status. The report also notes the need for improved risk assessments during gun design, actively considering drills.
View full coroner's concerns
day day: The being firing put The bag fitting One bag bag the bag fire bag and

Iremain concerned that soldiers are not clear about when to use the Prove The Gun drilland the meaning of the word "work" in the drill, This was supported by the evidence off who stated there was still a lack of clarity. The MOD should ensure that soldiers are clear about the meaning of the word work in the drill and when the drill should be undertaken_ One of the contributing factors to this tragedy was that the RCO, the person in charge of the live firing exercise, did not know the state of the tanks on the range and therefore allocated a stripped down tank for a firing exercise: remain concerned that it is vital that the person in charge of such exercises has up to date knowledge about the status of the tanks on the range. The MOD should look at what communication can be put in place to ensure the RCO is in fact in charge and has all the correct information to make decisions the exercise_ ffrom the HSE confirmed that had applied advanced or developed risk assessment techniques undertaken then it would have been identified in the design and manufacture of the gun that it could fire without the BVA assembly present when undertaking the TVEDU red drill: BAE and the MOD should look at their process to ensure that their risk assessments are suitable and importantly that drills are actively considered when assessing risk and identifying hazards during manufacture

Responses

2 respondents

Ministry of Defence

Central Government
PDF
AI-classified response stance Action Taken
AI-generated response summary

• The Ministry of Defence revised Army Equipment Support Publications (AESPs) to clarify gun safety drills and mandate specific checks for critical components, with all Challenger 2 crews receiving comprehensive training. • A 'Do not use' cover was introduced to clearly indicate when a gun is in an unsafe state during maintenance. • BAE Systems conducted a Failure Mode Effects and Criticality Analysis and a feasibility study into physical safety mechanisms, with further work underway to develop design solutions.

BAE Systems

Private Sector
Letter dated 10 Sep 2018 PDF
AI-classified response stance Disputed
AI-generated response summary

• BAE Systems and the MoD are developing a design solution to eliminate the risk of the Challenger 2 gun firing without a vital safety assembly. • Two additional engineering proposals are being considered, alongside two previously highlighted, to prevent the gun from firing without the BVA Assembly. • Progress on all four solutions will be reviewed by the MoD Challenger 2 Safety and Environmental Management Panel in October 2018.

Report sections

Investigation and inquest
On 30/06/2017 commenced an investigation into the deaths of Matthew Karl Hatfield and Darren Paul Neilson: The investigation concluded at end of an inquest on 17th July 2018. The conclusion of the inquest was: The main cause of this incident was the tank being able to fire without the BVA assembly being present During production and manufacture f the gun this hazard was not adequately considered or investigated and therefore the ability of the gun to fire without the BVA assembly present when the FNA with attached TVE is manually fitted in accordance with the TVEDU red drill went undetected: There were other issues which contributed to the incident: At the time of the incident there was no written process in place to check for the presence of the BVA assembly or any written process to confirm when it should be removed and where it should be stored: The prove the gun drill was misunderstood and there was a grey area around when it should be done: The decision to undertake an experience shoot was opportunistic and not communicated adequately: There was no written handover procedure in place and no handover occurred between the crews. Failure to correctly stow charges caused a secondary explosion following failure of the breech block due to the absent BVA assembly: The practice of unstowed charges was routine in the regiment and had not been identified or addressed by senior officers_
Circumstances of the death
The tank involved in this incident was a Challenger 2 call sign DS39AA which L3OA1 120mm gun: The gun was designed and manufactured in the 1980s coming into use in Challenger 2 in 1994. The gun fires a projectile by a Tube Vent Electrical (TVE), which sits in the Bolt Vent Axial (BVA) assembly, igniting propelling charge which then leads to the build-up of hot pressured gases which force the projectile out the barrel: The BVA assembly is a mushroom shape assembly. When the electrical circuit is made the stalk of the BVA assembly safely retains the TVE of the gun system and allows the flame to be directed onto the charge through the flash panel to ignite the charge. The head of the BVA assembly creates a rearward seal when the gun fires to stop the high pressured hot gases which form from the lit bag charge coming back into the turret thus facilitating the to fire the projectile. During the manufacture and production of the it was not identified that the gun could fire without the BVA assembly being present in combination with the Tube Vent Electrical Display Unit (TVEDU) red drill: Cpls Hatfield and Neilson were Regimental Instructors Gunnery (RIGS) in Badger Squadron of the Royal Tank Regiment: They were at Castlemartin firing range as part of a planned excrcise culminating in a routine Annual Crew Test (ACT}: The person in charge of the exercise was the Range Conducting Officer (RCO) On 14/06/17 the final ACTs were concluded just before lunchtime. The BVA assembly in tank DS39AA was removed, cleaned and replaced in the brew bin (a compartment in the tank) It was wrapped in a rag and covered by a prestle and red mine tape The outgoing crew from the the has bag during firing gun gun live firing morning ACT were not aware that the tank would be used again that day. The white board showing the day' $ activities only detailed the morning ACT for the tank There was no formal written process in place at the time to say when the BVA assembly should be stripped and where it should be stored before being checked by the armorer. practice had developed for the BVA assembly to be taken out of the tank and stored in the range tower at the end of the to be inspected by the armourer that evening or the following morning before being refitted to the tank by the first oncoming crew the next The RCO was not aware that the tank had been stripped down and the BVA assembly removed The RCO did not adequately communicate that an experience shoot was taking place that afternoon as it was opportunistic. An experience shoot involves a non-qualified person being in the tank in the gunner's position to fire the gun. required permissions were not obtained for the experience shoot however any risk was mitigated by the two RIGS (Cpl Hatfield as loader and Cpl Neilson as commander) part of the tank crew: The other tank crew consisted of as driver 4 Shell 12Omm TK practice SH L3646 projectiles with bag charges and shot 12Omm TK DS practice L29A1 projectiles with charges were loaded into the tank with some additional rounds for the chain gun; When the experience shoot crew entered the tank at around 15.00 hrs the tank was running: It was not recognised that the BVA assembly was absent and they would not have expected it to be missing: The loader placed his mobile phone in the brew bin and did not see the partially covered BVA assembly. At some point the loaders tray was in place and the needle assembly (FNA) inserted: The Prove The Gun drill (PTG) ensures there is no ammunition within the gun and at step 6.13 requires the BVA to be checked for any TVE It is not clear if this drill was done however it is possible to do the drill without noticing if the BVA assembly is present crew prepared to fire a shell 12Omm TK practice SH L36A6 projectile using a charge and got a TVEDU red light warning: The most likely explanation for the TVEDU red light warning would be a failed vent tube insertion (the mechanism to ignite the charge bags used to propel projectiles): The loader would have run the accepted TVEDU red drill which includes manually another vent tube on an FNA, It is possible to do this without noticing the BVA assembly is absent: This would have achieved a green light on the electrical circuit as the BVA assembly is not part of the electrical circuit: The tank would then have gone ahead to fire: As the BVA assembly was missing no adequate rearward obturation would be achieved in the gun which resulted in extremely hot pressurised gases from the ignited bag charge in the barrel coming back into the tank turret; This was the hissing noise heard by witnesses and fThe pressure then reached a point where the breech block exploded causing the upper breech block to be severed off landing in the back of the turret: After hearing the hissing Cpl Neilson was seen to attempt to leave the tank through the commander's hatch, as the breech exploded he was propelled out of the hatch landing on his head/face several meters away: Flames were then seen t0 come from the commander'$ and loader s hatches and the barrel. These were from the ignited unstowed propelling charges in the turret: DST charge bag was on the charge storage locker in front of and to the left of the loader and 3 HESH charges were in the projectile racks to the right and slightly behind [oader. The DST charge likely ignited first followed by the other charges causing an immensely hot fire ball in the turret: The from the ignited charges was similar to a jet engine fire and was extremely intense. Cpl Hatfield was found wedged against the loading guard and was seriously burnt with his coveralls and shoes melted: The gunner was found with serious burns in the gunner's seat: The driver (who is sitting in a different compartment of the tank) was injured but his injuries were more minor. Army medics attended the scene within minutes other emergency services were called and arrived quickly. Cpl Neilson required CPR and intensive treatment before being taken by air ambulance to University Hospital in) Cardiff where despite further attempts to treat him he died on 15/06/17. Cpl Hatfield was extracted from the tank and given first aid and taken by air ambulance to Morriston hospital where despite further treatment he died on 15/06/17. Following a post mortem, the medical cause of death was determined to be: Cpl Hatfield: 1a
Action should be taken
In my opinion action should be taken to prevent future deaths and believe you have the power to take such action:
Copies sent to
Powys Police HSE have also sent it to the Minister for Defence

Similar PFD reports

Shared signals

Report details

Reference
2018-0231-wp26293
Date of report
18 July 2018
Coroner
Louise Hunt
Coroner area
Birmingham

Responses identified

Responses identified 2 of 2
All listed responses identified

Organisations named in PFD reports are normally expected to respond within 56 days. Deadline: 12 Sep 2018 (stated in the report).

Sent to

BAE Systems Ltd
MOD