• Network Rail stated that Cromwell Lane level crossing is a public highway crossing with manned barriers. • Network Rail confirmed the crossing is CCTV monitored at Carlton signal-box by a local signaller. • Network Rail noted that a narrative risk assessment for the crossing was last carried out on 20 December 2017, identifying appropriate mitigation measures. (AI summary)
View full response
[Page 2] Cromwell Lane level crossing narrative risk assessment (NRA) was last carried out on 201h December 2017. The NRA identifies appropriate mitigation measures to manage the risk associated with the crossing so far as is reasonably practicable. The NRA identifies the following risk controls in place at Cromwell Lane level crossing:
• Full barriers with barrier lamps - the barriers prevent anyone gaining access to the railway when trains are approaching. Lamps on top of barriers are there for visibility to approaching road traffic.
• CCTV cameras - as noted above CCTV cameras allow the signaller to check that the crossing is clear of vehicles and pedestrians before allowing an approaching train to proceed into the crossing area. The CCTV monitor will automatically switch off once he presses the "crossing clear'' button. The CCTV system is purely to check the crossing is clear when a train is approaching and is not monitored or recorded 24 hours.
• Road instructional signage - to forewarn users that they are approaching a level crossing.
• Interlocked barriers - this is a safety system preventing trains approaching unless barriers are in down position.
• Signaller (Located at Carlton signal box) - this is the person who looks after the crossings within his section of responsibility.
• Electrification warning signage - signage to highlight height restrictions due to OHLE (Overhead Line Equipment) above the railway carrying 25,000 volts.
• LED road lights - these lights are brighter and more visible than normal road lighting to mitigate against low sun.
• Cyclical maintenance and inspections - these are carried out every three months to ensure the asset is compliant to all relevant standards. Any defects found during the inspection are referred to the focal maintenance delivery unit for their attention to be rectified within the specified timescales.
• Regular risk reviews and assessments - these are carried out based on risk identified through ALCRM (All Level Crossing Risk Model). Any misuse or changes to the crossing triggers a review of the crossing.
[Page 3] Additional mitigation at Cromwell Lane level crossing We have also considered the findings you reference were identified within the Post Incident Site Report (the "PISR"). The PISR is a site assessment undertaken by the British Transport Police ("BTP") immediately after an incident. While it provides valuable information the PISR is not undertaken by specialists with detailed level crossing knowledge so the actions are not always practicable. There is no requirement for a telephone Cromwell Lane level crossing because it is a CCTV monitored crossing. Should a member of the public be concerned about an emergency situation, this should be reported by calling 999. Network Rail also maintains a 24 hour emergency number (03457 11 41 41) for the reporting of safety incidents on or near the railway, details of which are widely publicised. The emergency services closely liaise with Network Rail to pass information to signallers where required. Anti-trespass & anti-suicide measures In October of 2018 Network Rail implemented a team of patrollers who cover this level crossing and other at-risk locations in the area. They patrol on a risked based priority all locations which are identified by the rail industry's suicide and trespass workstreams. Moreover, Network Rail has funded an Embedded BTP Inspector to coordinate our activity across the rail industry and bring in BTP data. We have funded overtime patrols deployed on a priority basis and have established a joint operation to prevent suicide and trespass, working with local stakeholders to focus on areas including Cromwell Lane level crossing. I hope this response answers your concerns but if I can be of further assistance, or if you would like further clarification, please do not hesitate to contact me. Route Managing Director LNE&EM Network Rail