Source · Prevention of Future Deaths

Aaron Edwards

Ref: 2022-0302 Date: 27 Sep 2022 Coroner: Rachael Knight Area: South Wales Central 1 response identified · 1 indexed addressee View PDF

AI-generated concerns summaryThe coroner noted concerns about the dangerous junction of Goitre Lane and the Gurnos Ring Road due to poor visibility and increased danger from school traffic. Changes are needed to slow drivers on the Ring Road.

Date 27 Sep 2022
56-day deadline 23 Nov 2022 stated in the report
Responses identified 1 of 1
Road (Highways Safety) related deaths Wales prevention of future deaths reports (2019 onwards)

Coroner's concerns

AI summary
The coroner noted concerns about the dangerous junction of Goitre Lane and the Gurnos Ring Road due to poor visibility and increased danger from school traffic. Changes are needed to slow drivers on the Ring Road.
View full coroner's concerns
(1) The junction of Goitre Lane and the Gurnos Ring Road appears to be dangerous. Visibility is poor for the driver entering the Ring Road due to the bend in the road to the right and the railings protecting a subway below.

(2) Traffic and parked cars around this area at the nearby school Pen-Y-Dre at pick-up and drop off times add to this danger.

(3) Unless changes are made to slow down drivers on the Gurnos Ring Road more deaths may occur.

Responses

1 respondent

Merthyr Tydfil County Borough Council

Local Authority
Indexed date: 28 Sep 2022 PDF
AI-classified response stance Action Planned
AI-generated response summary

• The council stated that annual SCRIM surveys are undertaken, with recent results indicating good skid resistance at the location. • The council stated that the road layout at the junction will be altered as part of the Welsh Government's A465 dualling project, which is under construction until May 2025. • The council stated that the Gurnos Ring Road will become a 20mph speed limit on 17 September 2023.

View full response
Dear Rachel Re: Aaron David Edwards (Deceased) Thank you for your letter dated 28th September 2022 and the accompanying Regulation 28 report. We have considered all the concerns that were raised within the report in relation to the junction layout and would like to make the following observations. It has been determined that visibility at this junction is poor, however, we respectfully disagree as there is no immediate obstruction to the right while approaching the junction from Goitre Lane and the vision splay meets the requirements in accordance with Manual for Streets at
2.4m x 40m, therefore, visibility at this junction is acceptable. As noted a bridge/subway parapet does obstruct vision at circa 2.4m x 55m although the sightline extends behind the back of the parapet to 2.4m x 90m. It is also worth noting that the stopping sight distance for a 30mph road is 43m when accounting for a car bonnet length, therefore a vehicle travelling at 30mph would be able to stop safely if a car emerged from Goitre Lane. As highlighted within the report Mr Edwards was riding his Kawasaki motorcycle at over twice the speed limit when he collided with a car, which in our view negates the junction layout as a contributing factor in the collision. The time ofthe road traffic collision has not been made clear within the report but if it did occur during school start or end times then it is likely cars were parked on the Gurnos Ring Road which may have reduced visibility. However, if the incident did occur during these times where children were walking along Gurnos Ring Road then further responsibility should be attributed to Mr Edwards by traveling at over 60mph on a 30mph road with children in the area. Merthyr Tudful Merthyr Tydfil ... lie i fod yn falch ohono ... a place to be proud of Croesawn ohebu yn Gymraegafydd gohebu yn yGymraegddlm yn arwaln atoedl. Rhowch wybod lnnl beth yw'ch dewls lalth e.e Cymraegneu'n ddwylelthog. We welcome correspondence In Welsh and colll!spondlngwith us In Welsh will not lead to adelay. Letusknow your language choice IfWelsh or bilingual.

Cont/.... For information, the SCRIM (Sideway-Force Coefficient Routine Investigation Machine) which measures the skid resistance over a stretch of a road is undertaken every year on Merthyr's roads by an independent contractor WDM. The results from the SCRIM surveys at this location in 2019, 2020, 2021 and 2022 identify that no action is needed as the skid resistance of this road is good. Skid resistance is an important factor in highway safety particularly in damp or wet conditions. With reference to making changes on Gurnos Ring Road to slow vehicle speeds, it is proposed to alter the road layout at this location as part of Welsh Governments A465 dualling project which is currently under construction and will continue between now and May 2025. The road bridge will be removed including the parapet and an elevated roundabout will be located adjacent to Penydre School, this will prevent parents parking on Gurnos Ring Road or near the junction of Goitre Lane. In addition, due to Welsh Governments new legislation with regard to a default 20mph speed limit, the Gurnos Ring Road will become 20mph on the 17th of September 2023. I hope the above information is satisfactory and if you have any further queries, please do not hesitate to contact me. CHIEF EXECUTIVE Merthyr Tudful Merthyr Tydfil ... lie i fod yn falch ohono ... a place to be proud of Croesawn ohebu yn Gymraeg afydd gohebu yn yGymraeg ddlm yn arwaln at oedl. Rhowch wybod lnnl beth yw'ch dewls lalth e.e Cymraegneu'n ddwyielthog. We welcome conespondence In Welsh and conespondlngwlth us In Welsh wl!I not lead to adelay. Let us know your language choice IfWelsh orblllngual.

Report sections

Investigation and inquest
I commenced an investigation into the death of Aaron David Edwards on 10th October 2020. It concluded on 27th September 2022 following an inquest.
Circumstances of the death
These were recorded as :-

Aaron David Edwards was aged 42 when he died on 30th August 2020 at the junction of Goitre Lane and the Gurnos Ring Road in Merthyr Tydfil. Mr Edwards was riding his Kawasaki motorcycle at over twice the speed limit when he collided with a car that was emerging from a side road. Despite extensive efforts of civilians and professionals, he had sustained catastrophic injuries and died at the scene.
Copies sent to
of Mr Edwards, and the other driver involved

Similar PFD reports

Shared signals

Report details

Reference
2022-0302
Date of report
27 September 2022
Coroner
Rachael Knight
Coroner area
South Wales Central

Responses identified

Responses identified 1 of 1
All listed responses identified

Organisations named in PFD reports are normally expected to respond within 56 days. Deadline: 23 Nov 2022 (stated in the report).

Sent to

Merthyr Tydfil County Borough Council

Source links