National Highways will repair the boundary fence at the edge of the hotel car park and Hasty Lane, extending this to cover the wing walls of the structure. They are also in discussion to establish if it is feasible to maintain a more remote access to the electrical cabinets and remove the ladder from the retaining wall. (AI summary)
View full response
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ National Highways Limited registered in England and Wales number 09346363 embankment/verge. We believe this is the substantial wooden fence referred to in the Coroner’s concerns. Along the northbound carriageway and to the south of Hasty Lane, the M56 carriageway is some 3 metres higher than the adjacent ground level and initially has a ramped profiled embankment. After a distance of 12 metres, the profiled verge area becomes a near vertical retaining wall which continues for some distance. This also creates a level area of ground, running parallel to the motorway between the retaining wall and boundary fence. Between the retaining wall on one side and the boundary fence and mature vegetation on the other, this gives the visual impression of a pathway. The M56 at this point is lit with lighting columns located within the area of carriageway immediately behind the hard shoulder. This includes columns installed within the top of the verge/embankment and the top of the retaining structure. The electrical supply required to operate this system is distributed from electrical feed cabinets located at the foot of the retaining wall. Maintenance personnel require unhindered access to, not only the individual lighting columns, but also these supply cabinets to safely work on the systems when needed. A set of metal steps (ladder) allow access for maintenance personnel to and from carriageway level and the flat ground some 2 metres below. This is within the fenced highway boundary. The boundary fence alongside the northbound carriageway to the south of Hasty Lane has suffered some level of vandalism in the immediate area of the underpass and although there is some dense vegetation, this affords access to the side of the carriageway and metal steps outlined above. Additionally, it appears that a boundary fence line has never been in place along the wing walls on this side of the structure and Hasty Lane. Further investigation has identified some minor vandalism at the edge of the car park for the Marriot Hotel, 100 yards south of Hasty Lane. This indicates the section of lane between the retaining wall and boundary fence has been used as short cut or cut through although the usage appears to be light. Our current incident recording system was implemented during April 2019. Since this time we are not aware of any similar, pedestrian related, incidents having been recorded at this site. We will repair the boundary fence both at the edge of the hotel car park and Hasty Lane, extending this to cover the wing walls of the structure to increase the security and reduce access to the area along the carriageway. This work will be completed by the 30 June 2025. In addition, we are in discussion with our Electrical team and Maintenance contractors to establish if it is feasible to maintain a more remote access to the electrical cabinets and whether direct access from the mainline carriageway, via the ladder is essential. This includes the relevant health and safety requirements and if this can be resolved we will take steps to remove the ladder from the retaining wall. Again, if this is feasible the work will be completed by 30 June 2025.
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ National Highways Limited registered in England and Wales number 09346363 If this is not a realistic way forward, we will undertake to design and install a bespoke fence assembly to secure the access point, cabinets and ladder. If this course of action is necessary, the work will be completed by the 31 August 2025. I hope that you find this information helpful.