Select Committee · Treasury Committee

Restoration and Renewal of the Palace of Westminster inquiry

Status: Closed Opened: 16 Jan 2017 Closed: 3 May 2017 1 report
Inquiry scopePreliminary report: Restoration and Renewal of the Palace of Westminster: Preliminary Report Preliminary report: Restoration and Renewal of the Palace of Westminster: Preliminary Report (PDF 193 KB) The Treasury Committee examines the Restoration and Renewal Programme. Restoration and Renewal is likely to be one of the largest major restorations in the history of the public sector estate. The consultants have estimated that the cost, if carried out over the minimum period of 5-8 years, will be between £3.5 and £4 billion. A Joint Committee of both House of Parliament reported on the options presented by the consultants .

Reports

1 report

Correspondence

7 letters