Select committee inquiry

Revisiting the nuclear roadmap

Open

Energy Security and Net Zero Committee · Opened 20 February 2025

20 recommendations · 19 conclusions
Inquiry on parliament.uk ↗

What the inquiry is looking at

“The previous Government published Civil Nuclear: Roadmap to 2050 in January 2024. The roadmap committed to building a further large-scale reactor; delivering 3-7GW more of nuclear power every five years from 2030-2044; reaching 24GW of nuclear power on the grid by 2050 and developing government policy to support advanced nuclear technologies Like Small Modular Reactors. Witnesses to the Science, Innovation and Technology Committee’s 2023 inquiry on delivering nuclear power described the 24GW and building goals as more of a “wish list” than a strategy to achieve those ambitions. The new Government has not re-committed to the roadmap or these targets. The final investment decision to greenlight the new large-scale nuclear plant at Sizewell C is expected in the coming months. The result of the previous government’s small modular reactor competition is also due to be announced soon. This inquiry seeks to understand what the new Government’s nuclear ambitions are and what the roadmap is to achieving them.”

The committee's words, from the inquiry page on parliament.uk ↗.

What it found

In the committee's words, from the summary of 6th Report – Revisiting the nuclear roadmap ↗

While there has been significant recent progress in the nuclear sector, including the financial close of Sizewell C, the selection of Rolls-Royce SMR for the UK’s first small modular reactor programme, and regulatory reforms following the Nuclear Regulatory Review, the government lacks a clear long-term strategy for nuclear energy. We are concerned that the government has not recommitted to the previous 2024 Nuclear Roadmap and that the Strategic Spatial Energy Plan, intended to provide an evidence-based framework for energy policy decisions, has been delayed until 2027. The uncertainty this causes risks undermining investor confidence, workforce development, supply chain investment and long-term project planning.

We recommend that the Government publish an updated nuclear roadmap within six months of the Strategic Spatial Energy Plan, setting out evidence-based deployment targets and clear plans for delivery of gigawatt-scale reactors, SMRs and AMRs. We also recommend increasing Great British Energy-Nuclear’s target from two to three completed Final Investment Decisions by the end of this Parliament to better align delivery with long-term nuclear objectives.

The UK’s historic “stop-start” approach to nuclear development has resulted in decades of underinvestment in the nuclear workforce and supply chains. Witnesses argued that a predictable pipeline of reactor orders could encourage investment in domestic supply chains, secure high-value manufacturing jobs and create export opportunities for UK industry.

However, concerns remain that current commitments to achieving 70% UK content in the SMR programme are not sufficiently enforceable. We recommend stronger contractual requirements and greater transparency over how UK supply chain commitments will be measured and monitored.

Pathways into the nuclear workforce should be expanded and there must be clearer accountability arrangements for delivery against targets in the National Nuclear Strategic Plan for Skills. To strengthen energy resilience, we also call for a formal assessment of whether the UK should develop a civil nuclear test reactor.

We have heard that, while maintaining confidence in the UK’s strong safety culture, nuclear power regulation must become more proportionate and less burdensome. We also back efforts to reduce Generic Design Assessment timelines, improve international regulatory cooperation and reform outdated reactor siting rules that may hinder deployment of SMRs and AMRs.

On financing, we acknowledge the difficulty of funding large nuclear projects but express concern that the Regulated Asset Base model used for Sizewell C transfers significant construction risk to consumers. We recommend greater transparency over the costs borne by households and businesses and urge caution before extending consumer-funded models to future projects. We broadly approve of the Advanced Nuclear Framework but emphasise that public support for first-of-a-kind technologies must lead to deployment at scale and provide value for consumers and taxpayers.

Future nuclear expansion will depend on the successful delivery of a Geological Disposal Facility (GDF) to safely manage the UK’s radioactive waste over the long term. Progress has been too slow, with delivery not expected until the 2050s. We call for an acceleration of the GDF programme, with a preferred site identified before the end of this Parliament.

In summary, the Committee is persuaded by the need for an expanded role for nuclear power in the UK’s future energy system but concludes that success for the nuclear sector will depend on providing greater strategic clarity through a roadmap, securing skills and supply chains, delivering regulatory reform, ensuring fair financing arrangements and making faster progress on waste management.

What the government said

Government response awaited: deadline 20 January 2027.

How the inquiry has run so far

Each dot is a dated item listed on this page, from the inquiry's opening on 20 February 2025 to 20 January 2027. The dashed mark is the deadline Parliament records for the government's response.

  1. Oral evidence 5 sessions
  2. Report 20 Nov 2026

What it recommended 20 recommendations · 19 conclusions

1We welcome the significant progress made in the nuclear sector since the publication of the...
Concluded (the committee's words)
We welcome the significant progress made in the nuclear sector since the publication of the 2024 Nuclear Roadmap. The Labour government appears to have a short-term plan, however, there remains insufficient clarity about its intentions for the sector’s long-term direction. We are concerned that this uncertainty is affecting investor confidence, workforce and skills pipelines, supply chains, fleet build and more. (Conclusion, Paragraph 11)

Addressed to Department for Energy Security and Net Zero

2We note Lord Vallance’s view that the previous Conservative government’s 24 GW target provided a...
Concluded (the committee's words)
We note Lord Vallance’s view that the previous Conservative government’s 24 GW target provided a sense of direction but that the precise figure did not appear to be founded on evidence. We agree that it remains unclear what analysis, if any, underpins the deliverability of this target. Its value, even as a spur to action, is therefore questionable if it is not regarded as credible, raising concerns about why it was selected for inclusion in the 2050 Roadmap. Targets should be evidence-based, achievable, and aligned with wider energy system requirements. We are concerned that the delay in publishing the Strategic Spatial Energy Plan (SSEP) means investment decisions with long-term implications for the sector continue to be taken before the strategic framework intended to guide them is in place. This undermines confidence that investment is being directed in line with an evidence-based assessment of future energy system requirements. (Conclusion, Paragraph 12)

Addressed to Department for Energy Security and Net Zero

3The Government should prioritise the publication of the Strategic Spatial Energy Plan (SSEP) and ensure...
Recommended (the committee's words)
The Government should prioritise the publication of the Strategic Spatial Energy Plan (SSEP) and ensure there are no further delays to its delivery, as long-term investment decisions continue to be taken in the absence of a guiding strategic framework. In turn, within six months of the publication of the SSEP, the Government should publish an updated nuclear energy roadmap setting out the role of nuclear power within the UK’s future energy system. The roadmap should include an evidence-based deployment target and provide clarity on the anticipated deployment of gigawatt-scale reactors, SMRs and AMRs, together with the milestones required to deliver that capacity. (Recommendation, Paragraph 13) 41

Addressed to Department for Energy Security and Net Zero

4We are concerned that GBE-N’s current remit lacks both the clarity and ambition needed to...
Concluded (the committee's words)
We are concerned that GBE-N’s current remit lacks both the clarity and ambition needed to support the Government’s nuclear objectives. A stronger mandate would help align delivery arrangements with long-term policy goals. (Conclusion, Paragraph 16)

Addressed to Department for Energy Security and Net Zero

5We recommend that the Government review GBE-N’s mandate and objectives and ensure they are clearly...
Recommended (the committee's words)
We recommend that the Government review GBE-N’s mandate and objectives and ensure they are clearly aligned with its wider nuclear policy ambitions. A remit focused solely on achieving two Final Investment Decisions by 2029 risks creating uncertainty about the organisation’s role in delivering the wider programme of nuclear deployment required to meet the UK’s long-term targets. (Recommendation, Paragraph 17) Chapter 2: Workforce and supply chain

Addressed to Department for Energy Security and Net Zero

6The UK’s stop-start approach to nuclear power has, amongst other things, affected the development and...
Concluded (the committee's words)
The UK’s stop-start approach to nuclear power has, amongst other things, affected the development and retention of skills within the nuclear workforce. Future strategy must prevent this pattern from recurring. The industry requires long term planning commitments to help with skills development, and help the UK compete for those skills once developed domestically, as well as internationally. (Conclusion, Paragraph 20)

Addressed to Department for Energy Security and Net Zero

7To provide the certainty needed for skills investment, the Government should set out a clear...
Recommended (the committee's words)
To provide the certainty needed for skills investment, the Government should set out a clear and credible pipeline for future nuclear projects through an updated Nuclear Roadmap. (Recommendation, Paragraph 21)

Addressed to Department for Energy Security and Net Zero

8Competition is intensifying across the full nuclear lifecycle, from commissioning through to decommissioning.
Concluded (the committee's words)
Competition is intensifying across the full nuclear lifecycle, from commissioning through to decommissioning. As such, there should be coordinated workforce strategies across both civil and defence sectors, as well as industry, universities, colleges, national and local government. Apprenticeships and graduate schemes remain vital entry routes into the nuclear sector, but they will not by themselves meet future workforce needs. A successful workforce strategy must provide multiple pathways into the sector, at different entry-points, supporting lifelong skills development. (Conclusion, Paragraph 24)

Addressed to Department for Energy Security and Net Zero

9The government should expand support for alternative entry routes into the nuclear workforce, including mid-career...
Recommended (the committee's words)
The government should expand support for alternative entry routes into the nuclear workforce, including mid-career retraining programmes, recognition of transferable skills from adjacent sectors, and mentoring schemes to facilitate the transfer of expertise from experienced workers to new entrants. In particular, there should be an official skills-matching assessment developed for North Sea oil and gas workers to transition to nuclear. (Recommendation, Paragraph 25)

Addressed to Department for Energy Security and Net Zero

10Where significant public funding is provided for nuclear projects, the government should require developers to...
Recommended (the committee's words)
Where significant public funding is provided for nuclear projects, the government should require developers to put in place robust workforce and skills plans as a condition of support. These plans should be incorporated 42 from the outset and set out how developers will recruit, train and retain the skilled workforce required to deliver the project, including through apprenticeships, training programmes and partnerships with local skills providers. (Recommendation, Paragraph 28)

Addressed to Department for Energy Security and Net Zero

11The Committee welcomes the National Nuclear Strategic Plan for Skills and notes progress in reducing...
Concluded (the committee's words)
The Committee welcomes the National Nuclear Strategic Plan for Skills and notes progress in reducing the projected workforce gap. However, we are concerned that witnesses were unable to identify clear accountability structures for delivering the Plan’s objectives. Recruitment delays and workforce reductions in key nuclear bodies suggest a disconnect between the government’s various nuclear ambitions and risk undermining the very objectives the Skills Plan is intended to achieve. (Conclusion, Paragraph 32)

Addressed to Department for Energy Security and Net Zero

12The government’s response to this report should set out the respective responsibilities of the organisations...
Recommended (the committee's words)
The government’s response to this report should set out the respective responsibilities of the organisations involved in delivering the Nuclear Skills Plan and name a Senior Responsible Owner with overall accountability for its implementation. Given recent recruitment delays and workforce reductions across key nuclear organisations, it should explain how these decisions affect the objectives of the Skills Plan and set out measures to avoid the loss and encourage the retention of valuable nuclear skills experience. (Recommendation, Paragraph 33)

Addressed to Department for Energy Security and Net Zero

13The UK risks missing the opportunity to gain a competitive edge in establishing domestic supply...
Concluded (the committee's words)
The UK risks missing the opportunity to gain a competitive edge in establishing domestic supply chain businesses because government has not provided sufficient certainty, accountability, or competitiveness to secure investment in the UK. Setting out a deployment pathway for a fleet of new nuclear reactors, rather than treating reactors as standalone projects, allows industry to plan for future procurement opportunities. (Conclusion, Paragraph 40)

Addressed to Department for Energy Security and Net Zero

14In the publication of the updated nuclear roadmap, DESNZ and GBE-N should publish a UK...
Recommended (the committee's words)
In the publication of the updated nuclear roadmap, DESNZ and GBE-N should publish a UK nuclear supply chain capability assessment identifying “red”, “amber” and “green” areas. This should be used to identify strategic nuclear supply chain capabilities that could be developed in the UK and provide targeted support to secure them. (Recommendation, Paragraph 41)

Addressed to Department for Energy Security and Net Zero

15The government should ensure that UK supply chain commitments form a contractual obligation rather than...
Recommended (the committee's words)
The government should ensure that UK supply chain commitments form a contractual obligation rather than an aspirational target. GBE-N and DESNZ should set out in contracts how UK content requirements will be measured, monitored and enforced across the SMR programme. This should include: a definition of “UK content”; methodology for calculating the 70% figure; requirements flowing down through tiers of the supply chain; annual reporting against targets; and consequences for non- compliance, including a threshold at which financial penalties are applied. (Recommendation, Paragraph 42) 43

Addressed to Department for Energy Security and Net Zero

16Russia’s invasion of Ukraine and the US’s bombing of Iran leading to severe shipping congestion...
Concluded (the committee's words)
Russia’s invasion of Ukraine and the US’s bombing of Iran leading to severe shipping congestion in and around the Strait of Hormuz have demonstrated how geopolitical events can quickly disrupt energy supply chains. The use of nuclear energy changes, rather than eliminates, energy dependencies. But because nuclear fuel can be sourced in advance and stockpiled for years, supply risks are more manageable than those associated with fossil fuels. A safe strategic reserve could be conceived and created providing more of a buffer against sanctions, conflicts, transport disruptions, or supplier failures than would be possible for oil or gas. (Conclusion, Paragraph 47)

Addressed to Department for Energy Security and Net Zero

17Given increasing geopolitical instability, we recommend that the government undertakes a strategic assessment of the...
Recommended (the committee's words)
Given increasing geopolitical instability, we recommend that the government undertakes a strategic assessment of the UK’s nuclear fuel resilience, including the risks, costs and benefits of maintaining a strategic reserve of uranium and nuclear fuel. (Recommendation, Paragraph 48)

Addressed to Department for Energy Security and Net Zero

18The Government should continue to support the HALEU programme because it is an important component...
Recommended (the committee's words)
The Government should continue to support the HALEU programme because it is an important component of energy security, reducing reliance on Russian fuel supplies, and facilitating the steady deployment of advanced modular reactors. However, the level of public expenditure allocated to support the production of fuels for novel nuclear energy technologies should be geared to both this contribution to national energy security, clear evidence of future reactor demand and likely value for money for taxpayers and electricity customers. (Recommendation, Paragraph 49)

Addressed to Department for Energy Security and Net Zero

19We recognise the government’s view that civil test reactors are not required for SMRs and...
Concluded (the committee's words)
We recognise the government’s view that civil test reactors are not required for SMRs and that the private sector may provide capacity for some AMR designs. However, the evidence we received suggests that the absence of a UK civil nuclear test reactor presents a strategic gap. Reliance on international facilities risks constrained access, slower innovation, and reduced sovereign capability at a time when global demand for nuclear research infrastructure is growing. If AMRs are to be deployed at scale in the UK, the case for domestic test reactor capacity merits far more serious consideration than it has received to date. (Conclusion, Paragraph 53)

Addressed to Department for Energy Security and Net Zero

20The Government should undertake a full strategic assessment of the costs and benefits of establishing...
Recommended (the committee's words)
The Government should undertake a full strategic assessment of the costs and benefits of establishing a UK civil nuclear test reactor. This assessment should consider the role such a facility could play in supporting AMR deployment, advanced fuel qualification, medical radioisotope supply, skills development and sovereign capability. (Recommendation, Paragraph 54) Chapter 3: Regulation

Addressed to Department for Energy Security and Net Zero

21We welcome the Government’s acceptance of the Nuclear Regulatory Taskforce’s findings and the progress made...
Concluded (the committee's words)
We welcome the Government’s acceptance of the Nuclear Regulatory Taskforce’s findings and the progress made since its Review’s publication, including the Strategic Steer, the Ways of Working guidance, and the commitment to implement all recommendations by the end of 2027. 44 We agree that a more proportionate application of the ALARP principle can reduce unnecessary cost, delay and complexity without weakening safety or environmental protections. However, we are concerned that excessive risk aversion is deeply embedded across the nuclear system and that cultural change will be difficult and may take considerable time. (Conclusion, Paragraph 62)

Addressed to Department for Energy Security and Net Zero

22The Government has accepted the Nuclear Regulatory Review in full and committed to complete all...
Recommended (the committee's words)
The Government has accepted the Nuclear Regulatory Review in full and committed to complete all 47 recommendations by the end of 2027. Within three months of the publication of this report, the Government should publish an implementation update setting out, for each of the 47 recommendations, the responsible Minister and official, its current status, and a fixed delivery date. Where a deliverable has already passed its published date, the update should state why and give a new fixed date. The update should identify every recommendation that requires primary legislation and the Government should introduce the enabling Bill in the current session so that Royal Assent can be secured within the end-2027 deadline. (Recommendation, Paragraph 63)

Addressed to Department for Energy Security and Net Zero

23Success should not be judged by the publication of plans and guidance, but by measurable...
Concluded (the committee's words)
Success should not be judged by the publication of plans and guidance, but by measurable improvements in project delivery, regulatory decision making, and costs. The Nuclear Regulation Implementation Panel should develop measurable indicators of the impact of regulatory change. They should provide Parliament with annual updates on progress against the Nuclear Regulatory Review’s implementation programme, including evidence and case studies of where regulatory processes have been simplified, where delays remain, and what further legislative change may be required. (Recommendation, Paragraph 64)

Addressed to Department for Energy Security and Net Zero

24The GDA is a valued and internationally respected process that provides for the assessment of...
Concluded (the committee's words)
The GDA is a valued and internationally respected process that provides for the assessment of a wide range of nuclear technologies. We approve of efforts to reduce the GDA process from four to two years. However, increasing demand and plans to accelerate assessments raise concerns about regulatory capacity. There are also concerns that the process is increasingly being used as an investment milestone rather than as a tool to facilitate fleet deployment. (Conclusion, Paragraph 69)

Addressed to Department for Energy Security and Net Zero

25The government should clarify the strategic purpose of the GDA process through an updated nuclear...
Recommended (the committee's words)
The government should clarify the strategic purpose of the GDA process through an updated nuclear roadmap. It should clarify whether the process is primarily intended to support UK deployment, investor confidence, or both, and ensure that its operation remains aligned with the delivery of the UK’s nuclear ambitions. (Recommendation, Paragraph 70) 45

Addressed to Department for Energy Security and Net Zero

26The Government should ensure the GDA process is adequately resourced to meet increasing demand for...
Recommended (the committee's words)
The Government should ensure the GDA process is adequately resourced to meet increasing demand for GDAs in order to achieve the two-year target. The impact of reducing GDA timescales from four years to two years should be monitored to ensure that efforts to accelerate deployment do not compromise regulatory rigour or safety. (Recommendation, Paragraph 71)

Addressed to Department for Energy Security and Net Zero

27We welcome closer cooperation between UK nuclear regulators and trusted international counterparts, particularly through the...
Concluded (the committee's words)
We welcome closer cooperation between UK nuclear regulators and trusted international counterparts, particularly through the UK-US Atlantic Partnership and the upcoming government-regulator international strategy recommended by the Nuclear Regulatory Review. While the UK must retain independent regulatory oversight, greater harmonisation of designs and processes enabling more use of international evidence and assessments, could significantly reduce costs and delays, while making the UK a more attractive destination for nuclear investment. (Conclusion, Paragraph 75)

Addressed to Department for Energy Security and Net Zero

28Building on the UK-US Atlantic Partnership, the government should pursue comparable arrangements with other trusted...
Recommended (the committee's words)
Building on the UK-US Atlantic Partnership, the government should pursue comparable arrangements with other trusted international partners in the civil nuclear sector where this can reduce duplication, support reactor deployment and strengthen opportunities for inward investment. It must publish the joint government-regulator international strategy by the end of 2026, as promised, to strengthen international regulatory harmonisation processes. (Recommendation, Paragraph 76)

Addressed to Department for Energy Security and Net Zero

29The Semi-Urban Population Density Criterion is outdated and risks becoming a significant barrier to the...
Concluded (the committee's words)
The Semi-Urban Population Density Criterion is outdated and risks becoming a significant barrier to the deployment of SMRs and AMRs. A siting regime designed around reactor technologies of the size and novelty of the 1960s is unlikely to be relevant nearly 70 year later; especially to small and advanced modular reactors specifically designed to be located close to industry and other demand centres as a key advantage. The current siting regime risks undermining this benefit, potentially increasing network costs and limiting opportunities for industrial decarbonisation. We will return to this issue in our inquiry Reviewing the electricity market. (Conclusion, Paragraph 81)

Addressed to Department for Energy Security and Net Zero

30We welcome the government’s commitment to review the Semi-Urban Population Density Criterion (SUPDC) as an...
Concluded (the committee's words)
We welcome the government’s commitment to review the Semi-Urban Population Density Criterion (SUPDC) as an inevitable and necessary consequence of the development of modern reactors. The current criterion should be replaced with a modern, evidence-based, approach that reflects the safety characteristics of contemporary reactor technologies and a proportionate balance of risks. The revised framework should be in place by March 2027, in line with the timeline set out by Lord Vallance. (Recommendation, Paragraph 82) 46 Chapter 4: Financing

Addressed to Department for Energy Security and Net Zero

31We recognise the need for financing models that support investment in gigawatt-scale nuclear projects.
Concluded (the committee's words)
We recognise the need for financing models that support investment in gigawatt-scale nuclear projects. However, while the RAB model may reduce financing costs, it does so by transferring significant construction risk from investors to consumers, who will pay for Sizewell C long before it generates electricity. We remain concerned that consumers may bear an unfair share of the risks, and that funding new nuclear projects through electricity bills will potentially undermine wider efforts to lower electricity costs and encourage electrification. (Conclusion, Paragraph 88)

Addressed to Department for Energy Security and Net Zero

32The Government should publish a detailed assessment of the impact of Sizewell C’s RAB charges...
Recommended (the committee's words)
The Government should publish a detailed assessment of the impact of Sizewell C’s RAB charges on different electricity consumers, including households, small businesses and energy-intensive industries. If the benefits are realised by risk transfer, the government should commission a risk assessment process that regularly monitors and reports on any changes to relevant factors. In light of the Government’s efforts to remove policy costs from electricity bills, future gigawatt-scale nuclear projects should not be financed through new consumer levies unless the Government can demonstrate that this provides better value for money and adequate consumer protection compared with funding through general taxation. (Recommendation, Paragraph 89)

Addressed to Department for Energy Security and Net Zero

33We are supportive of the Advanced Nuclear Framework and government ambitions.
Concluded (the committee's words)
We are supportive of the Advanced Nuclear Framework and government ambitions. It notes that the Framework’s success depends on whether it accelerates deployment, rather than creating unnecessary bureaucracy. Whilst accepting FOAK projects are likely to require government risk-sharing to attract investment, we are concerned that consumers and taxpayers are being exposed to uncertain costs and delivery risks, without guarantee that they will receive the benefits which arise from nth-of-a-kind fleet deployment. (Conclusion, Paragraph 96)

Addressed to Department for Energy Security and Net Zero

34The Government should align the Advanced Nuclear Framework with the new nuclear roadmap and set...
Recommended (the committee's words)
The Government should align the Advanced Nuclear Framework with the new nuclear roadmap and set out a clear pathway from first-of-a-kind projects to fleet deployment. Public risk-sharing should be avoided and alternative routes should be sought wherever possible. The Government should report annually on the Framework’s performance, including its impact on deployment, supply chains and economies of scale. This should demonstrate that it is accelerating deployment, and avoiding an additional regulatory barriers. (Recommendation, Paragraph 97) 47 Chapter 5: Decommissioning and nuclear waste

Addressed to Department for Energy Security and Net Zero

35A GDF is essential for both legacy waste management and future nuclear deployment.
Concluded (the committee's words)
A GDF is essential for both legacy waste management and future nuclear deployment. We welcome the requirement for new nuclear projects to have funded waste and decommissioning plans in place before construction. However, the absence of a GDF leaves the UK without a permanent disposal solution and maintains a significant long-term financial burden for DESNZ and therefore the taxpayer. (Conclusion, Paragraph 104)

Addressed to Department for Energy Security and Net Zero

36The current pace of progress on the GDF programme is unsatisfactory.
Concluded (the committee's words)
The current pace of progress on the GDF programme is unsatisfactory. With site selection still unresolved, delivery not expected until the 2050s, and the programme rated Red by NISTA, we believe greater urgency is required. Every delay increases costs and risks by extending reliance on interim storage, requiring additional infrastructure, and postponing a permanent solution for the UK’s higher-activity and legacy radioactive waste. (Conclusion, Paragraph 105)

Addressed to Department for Energy Security and Net Zero

37The Government should make delivery of a GDF a strategic national priority and identify a...
Recommended (the committee's words)
The Government should make delivery of a GDF a strategic national priority and identify a preferred site before the end of this Parliament. The Government should set out, in its response to this report, how it intends to accelerate the programme, overcome barriers to delivery, and establish a clear timetable for site selection. It should report annually to Parliament on progress against key milestones. (Recommendation, Paragraph 106)

Addressed to Department for Energy Security and Net Zero

38The Government should establish long-term funding for nuclear waste management and assess the costs of...
Recommended (the committee's words)
The Government should establish long-term funding for nuclear waste management and assess the costs of delay. The Department should consider multi-year funding arrangements and, within 12 months, publish their assessment of the range of costs associated with delaying or accelerating a GDF, particularly comparing costs of continued interim storage over different time periods. (Recommendation, Paragraph 107)

Addressed to Department for Energy Security and Net Zero

39The Government should deepen international collaboration on geological disposal.
Recommended (the committee's words)
The Government should deepen international collaboration on geological disposal. The UK should strengthen cooperation with countries such as Finland, Sweden, France, Canada and Switzerland to draw on international experience in site selection, community engagement, regulation and facility construction. (Recommendation, Paragraph 108) 48

Addressed to Department for Energy Security and Net Zero

Evidence

Oral evidence sessions 5

  • 27 Apr 20262 witnesses: Lord Vallance, Sam Whiteparliament.uk ↗
  • 22 Apr 20265 witnesses: Andy Mayall, Dr Gareth Headdock, Mustafa Latif-Aramesh, Paul Fyfe, Simon Bowenparliament.uk ↗
  • 15 Apr 20263 witnesses: Alastair Evans, Leon Flexman, Vanessa Jakovichparliament.uk ↗
  • 25 Feb 20266 witnesses: Cllr Richard Rout, Cllr Struan Mackie, David Cunningham, Mark Rouse, Sue Ferns, Zion Lightsparliament.uk ↗
  • 17 Dec 20254 witnesses: Dr Doug Parr, Professor Fiona Rayment OBE, Professor Stephen Thomas, Sam Dumitriuparliament.uk ↗

Who gave evidence 20 witnesses

  • Alastair EvansDirector of Corporate Affairs, Rolls Royce SMR
  • Andy MayallDeputy Director of Nuclear and Radioactive Substances Regulation Strategy, Environment Agency
  • Cllr Richard RoutChair of the New Nuclear Local Authorities Group, Suffolk County Council
  • Cllr Struan MackieHighland Councillor, Thurso and Northwest Caithness and Chair of Dounreay Stakeholder Group
  • David Cunningham
  • Dr Doug ParrChief Scientist and Policy Director, Greenpeace UK
  • Dr Gareth HeaddockChief Science and Technology Officer, United Kingdom National Nuclear Laboratory (UKNNL)
  • Leon FlexmanSenior Director, UK Corporate Affairs, X-energy
  • Lord VallanceMinister of State for Science, Research and Innovation, Department for Science, Innovation and Technology
  • Mark RouseSkills Director, Nuclear Sector Skills Team
  • Mustafa Latif-ArameshNuclear Taskforce Member, Nuclear Regulatory Taskforce
  • Paul FyfeDirector of Regulation – Futures, Office for Nuclear Regulation (ONR)
  • Professor Fiona Rayment OBEVisiting Professor, Dalton Nuclear Institute, previously the Chief Science and Technology Officer at the National Nuclear Laboratory
  • Professor Stephen ThomasEmeritus Professor of Energy Policy, University of Greenwich
  • Sam DumitriuHead of Policy, Britain Remade
  • Sam WhiteDeputy Director, Nuclear Power, Department for Energy Security and Net Zero
  • Simon BowenChair, Great British Energy – Nuclear
  • Sue FernsSenior Deputy General Secretary, Prospect Trade Union
  • Vanessa JakovichPartner, Freshfields
  • Zion Lights